Loading...
HomeMy WebLinkAboutNWE - Will Serve Letter Jacob Farwell Engineer jacob.farwell@contractor.northwestern.com 121 East Griffin Drive P.O. Box 490 Bozeman, MT 59771 C: (406) 224-2011 121 East Griffin Drive | P.O Box 490 | Bozeman, MT 59771 | New Construction: 406-582-4600 NorthWesternEnergy.com July 7, 2022 WH Northwest Crossing LLC Attn: Mike Badner – Williams Homes 24911 Avenue Stanford Santa Clarita, CA 91355 Dear Mike Badner, Northwestern Energy is willing and able to provide natural gas and electric service to the Northwest Crossing Phase 2, which includes both single family homes and condo style units. These services can be provided in accordance with applicable Montana Public Services rules and regulations and the current Northwestern Energy tariff schedule. Please note that the nearest natural gas is along Harvest Parkway. The nearest electric is accessible from existing junction cans within Phase 1 of the subdivision, however further electrical installation will be required to complete an alternate feed to the overhead lines along Baxter Ln. Northwestern Energy shall determine the locations of all transformers, underground lines and equipment to provide for maintenance and installation. These facilities shall be located on front lot lines in a minimum 10’ wide utility easement. Northwestern Energy will require a 10 ft. wide utility easement along Cottonwood Rd. for installation of a 600A electric line. The installation cost of the 600A gear will be borne by Northwestern Energy and is intended to benefit the system as a whole. The gas distribution infrastructure will be able to serve typical residential loads (300MBH) based on the preliminary subdivision layout. Any gas loads above this may require additional upgrades to the system including a district gas regulator station. Please provide the anticipated gas load for this project at your earliest convenience to determine any potential upgrades to the gas infrastructure. Please call or email me if you have any questions or concerns at 406-224-2011. Also, we require having a copy of the approved plat of this proposed area prior to providing a cost to bring in these services. If installation is required prior to approval of the plat, it will be your responsibility to keep us informed of any changes which would alter our utility design and installation. To request a cost estimate we would also require a signed application for new service along with an electronic layout of the subdivision. Sincerely, Jacob Farwell