HomeMy WebLinkAboutConcurrent Construction RequestCity of Bozeman Development Review Committee October 26, 2022 Re: Northwest Crossing Phase II Subdivision Concurrent Construction Request Please accept this letter as a request for concurrent construction of Subdivision infrastructure and building improvements on Northwest Crossing Phase II Subdivision. WH Bozeman NWX 358 LLC will begin construction of the Subdivision infrastructure as soon as practical after engineering approvals have been obtained, but infrastructure is unlikely to be complete prior to Final Plat. It is anticipated that a portion of the Subdivision infrastructure will be financially guaranteed prior to Final Plat through an Improvements Agreement. As soon as possible after Final Plat WH Bozeman NWX 358 LLC is planning on developing five lots (Lots 29 & 30 Block 8, Lots 14A &14B Block 11, and Lot 8 Block 9) in the southern portion of the Subdivision. To facilitate building permit reviews on these lots, concurrent construction of Subdivision and building improvements is requested. By the time of building permit approval, it is very likely that Subdivision infrastructure construction will be well underway. WH Bozeman NWX 358 LLC understands the need for functional Subdivision infrastructure to support construction activities and commits to the following Concurrent Construction Plan. Subdivision streets will be improved to a gravel surface and fire hydrants activated prior to vertical construction on the residential lots. Access to the entire Subdivision will be closed to the public until Subdivision infrastructure is complete. Subdivision infrastructure and park improvements will be complete and accepted by the City prior to occupancy of any structure on the concurrent construction lots. Prior to the Final Plat application, the concurrent construction request will be supported by the following project specific conditions and standard conditions per UDC 38.270.30 D and stipulated in the Subdivision Improvements Agreement. It is our understanding that meeting these conditions a PUD is not required for concurrent construction. 1. The Subdivision and concurrent construction site projects will be under control of a single entity, WH Bozeman NWX 358 LLC with a single general contractor for both subdivision and site construction. There will be no third-party builders until subdivision infrastructure is complete and accepted by the City. 2. Subdivision infrastructure plans will be approved and financially guaranteed prior to the Final Plat and any concurrent construction Building Permit issuance. 3. Subdivision streets will be improved to gravel surfacing and fire hydrants will be activated prior vertical construction on the concurrent construction lots. Access to the entire Subdivision will be closed to the public until Subdivision infrastructure is complete. Subdivision infrastructure and park improvements will be complete and accepted by the City prior to occupancy of any structure on the concurrent construction lots. 4. WH Bozeman NWX 358 LLC will provide insurance, risk acknowledgement, and indemnification in a form acceptable to the City prior to Final Plat and/or Building Permit issuance. Please let us know if there are any additional conditions required to enable concurrent Subdivision and residentially zoned building construction. Sincerely, Mike Badner WH Bozeman NWX 358 LLC