Loading...
HomeMy WebLinkAbout22 - Agency Letters NWX PH2 July 29, 2021 Bozeman Deaconess Hospital 915 HIGHLAND BLVD BOZEMAN, MT 59715 Re: Northwest Crossing Phase 2 Subdivision MMI# 6787.002 To Whom It May Concern: We are soliciting your comments regarding a proposed multiple lot major subdivision located in Bozeman, on the south side of Baxter Lane, and west side of the Cottonwood Road Alignment. The Preliminary Plat for this subdivision is currently being prepared for submittal to the City of Bozeman. A copy of both the Phase II Pre-Application Plan and Phase I Preliminary Plat (Phase II will be located on Restricted Lots 1-5) is enclosed for your reference. The proposed subdivision will cover approximately 44 plus acres and is requesting to be subdivided into multiple lots. The property is currently zoned REMU – Residential Emphasis Mixed Use. The project is located within the city limits of Bozeman and will be served by city infrastructure/services. Ingress and egress to the proposed subdivision will be provided by Baxter Lane (north), Harvest Parkway (south – currently being built with Phase 1) and Cottonwood Road (east). Cottonwood Road from Oak to Baxter is a City of Bozeman Capital Improvements Project - project #CIP No. SIF 138 and is scheduled to be constructed summer/ fall of 2022 with completion in 2023. As part of the subdivision application process, we are requesting any comments you may have regarding the proposed subdivision. Should you have any comments or questions, they may be directed to the address and phone number provided above. You may also feel free to contact me directly at (406) 431-5819 or mekstrom@m-m.net. Thank you for your consideration. Sincerely, ______________________________ Matt Ekstrom, PE Project Manager July 29, 2021 Chief Jim Veltkamp Bozeman Police Department 615 S 16TH AVE, STE 260 BOZEMAN, MT 59715 Re: Northwest Crossing Phase 2 Subdivision MMI# 6787.002 Dear Chief Veltkamp: We are soliciting your comments regarding a proposed multiple lot major subdivision located in Bozeman, on the south side of Baxter Lane, and west side of the Cottonwood Road Alignment. The Preliminary Plat for this subdivision is currently being prepared for submittal to the City of Bozeman. A copy of both the Phase II Pre-Application Plan and Phase I Preliminary Plat (Phase II will be located on Restricted Lots 1-5) is enclosed for your reference. The proposed subdivision will cover approximately 44 plus acres and is requesting to be subdivided into multiple lots. The property is currently zoned REMU – Residential Emphasis Mixed Use. The project is located within the city limits of Bozeman and will be served by city infrastructure/services. Ingress and egress to the proposed subdivision will be provided by Baxter Lane (north), Harvest Parkway (south – currently being built with Phase 1) and Cottonwood Road (east). Cottonwood Road from Oak to Baxter is a City of Bozeman Capital Improvements Project - project #CIP No. SIF 138 and is scheduled to be constructed summer/ fall of 2022 with completion in 2023. As part of the subdivision application process, we are requesting any comments you may have regarding the proposed subdivision. Should you have any comments or questions, they may be directed to the address and phone number provided above. You may also feel free to contact me directly at (406) 431-5819 or mekstrom@m-m.net. Thank you for your consideration. Sincerely, ______________________________ Matt Ekstrom, PE Project Manag July 29, 2021 Belgrade School District #44 312 N WEAVER ST BELGRADE, MT 59714 Re: Northwest Crossing Phase 2 Subdivision MMI# 6787.002 To Whom It May Concern: We are soliciting your comments regarding a proposed multiple lot major subdivision located in Bozeman, on the south side of Baxter Lane, and west side of the Cottonwood Road Alignment. The Preliminary Plat for this subdivision is currently being prepared for submittal to the City of Bozeman. A copy of both the Phase II Pre-Application Plan and Phase I Preliminary Plat (Phase II will be located on Restricted Lots 1-5) is enclosed for your reference. The proposed subdivision will cover approximately 44 plus acres and is requesting to be subdivided into multiple lots. The property is currently zoned REMU – Residential Emphasis Mixed Use. The project is located within the city limits of Bozeman and will be served by city infrastructure/services. Ingress and egress to the proposed subdivision will be provided by Baxter Lane (north), Harvest Parkway (south – currently being built with Phase 1) and Cottonwood Road (east). Cottonwood Road from Oak to Baxter is a City of Bozeman Capital Improvements Project - project #CIP No. SIF 138 and is scheduled to be constructed summer/ fall of 2022 with completion in 2023. As part of the subdivision application process, we are requesting any comments you may have regarding the proposed subdivision. Should you have any comments or questions, they may be directed to the address and phone number provided above. You may also feel free to contact me directly at (406) 431-5819 or mekstrom@m-m.net. Thank you for your consideration. Sincerely, ______________________________ Matt Ekstrom, PE Project Manager July 29, 2021 Chief Ron Lindroth Central Valley Fire District 205 MAIN ST BELGRADE, MT 59714 Re: Northwest Crossing Phase 2 Subdivision MMI# 6787.002 Dear Chief Lindroth: We are soliciting your comments regarding a proposed multiple lot major subdivision located in Bozeman, on the south side of Baxter Lane, and west side of the Cottonwood Road Alignment. The Preliminary Plat for this subdivision is currently being prepared for submittal to the City of Bozeman. A copy of both the Phase II Pre-Application Plan and Phase I Preliminary Plat (Phase II will be located on Restricted Lots 1-5) is enclosed for your reference. The proposed subdivision will cover approximately 44 plus acres and is requesting to be subdivided into multiple lots. The property is currently zoned REMU – Residential Emphasis Mixed Use. The project is located within the city limits of Bozeman and will be served by city infrastructure/services. Ingress and egress to the proposed subdivision will be provided by Baxter Lane (north), Harvest Parkway (south – currently being built with Phase 1) and Cottonwood Road (east). Cottonwood Road from Oak to Baxter is a City of Bozeman Capital Improvements Project - project #CIP No. SIF 138 and is scheduled to be constructed summer/ fall of 2022 with completion in 2023. As part of the subdivision application process, we are requesting any comments you may have regarding the proposed subdivision. Should you have any comments or questions, they may be directed to the address and phone number provided above. You may also feel free to contact me directly at (406) 431-5819 or mekstrom@m-m.net. Thank you for your consideration. Sincerely, ______________________________ Matt Ekstrom, PE Project Manager July 29, 2021 Century Link 2707 W MAIN ST BOZEMAN, MT 59718 Re: Northwest Crossing Phase 2 Subdivision MMI# 6787.002 To Whom It May Concern: We are soliciting your comments regarding a proposed multiple lot major subdivision located in Bozeman, on the south side of Baxter Lane, and west side of the Cottonwood Road Alignment. The Preliminary Plat for this subdivision is currently being prepared for submittal to the City of Bozeman. A copy of both the Phase II Pre-Application Plan and Phase I Preliminary Plat (Phase II will be located on Restricted Lots 1-5) is enclosed for your reference. The proposed subdivision will cover approximately 44 plus acres and is requesting to be subdivided into multiple lots. The property is currently zoned REMU – Residential Emphasis Mixed Use. The project is located within the city limits of Bozeman and will be served by city infrastructure/services. Ingress and egress to the proposed subdivision will be provided by Baxter Lane (north), Harvest Parkway (south – currently being built with Phase 1) and Cottonwood Road (east). Cottonwood Road from Oak to Baxter is a City of Bozeman Capital Improvements Project - project #CIP No. SIF 138 and is scheduled to be constructed summer/ fall of 2022 with completion in 2023. As part of the subdivision application process, we are requesting any comments you may have regarding the proposed subdivision. Should you have any comments or questions, they may be directed to the address and phone number provided above. You may also feel free to contact me directly at (406) 431-5819 or mekstrom@m-m.net. Thank you for your consideration. Sincerely, ______________________________ Matt Ekstrom, PE Project Manager July 29, 2021 Charter Communications 1500 N, 19th AVE SUITE B BOZEMAN, MT 59718 Re: Northwest Crossing Phase 2 Subdivision MMI# 6787.002 To Whom It May Concern: We are soliciting your comments regarding a proposed multiple lot major subdivision located in Bozeman, on the south side of Baxter Lane, and west side of the Cottonwood Road Alignment. The Preliminary Plat for this subdivision is currently being prepared for submittal to the City of Bozeman. A copy of both the Phase II Pre-Application Plan and Phase I Preliminary Plat (Phase II will be located on Restricted Lots 1-5) is enclosed for your reference. The proposed subdivision will cover approximately 44 plus acres and is requesting to be subdivided into multiple lots. The property is currently zoned REMU – Residential Emphasis Mixed Use. The project is located within the city limits of Bozeman and will be served by city infrastructure/services. Ingress and egress to the proposed subdivision will be provided by Baxter Lane (north), Harvest Parkway (south – currently being built with Phase 1) and Cottonwood Road (east). Cottonwood Road from Oak to Baxter is a City of Bozeman Capital Improvements Project - project #CIP No. SIF 138 and is scheduled to be constructed summer/ fall of 2022 with completion in 2023. As part of the subdivision application process, we are requesting any comments you may have regarding the proposed subdivision. Should you have any comments or questions, they may be directed to the address and phone number provided above. You may also feel free to contact me directly at (406) 431-5819 or mekstrom@m-m.net. . Thank you for your consideration. Sincerely, ______________________________ Matt Ekstrom, PE Project Manager July 29, 2021 Kerri Strasheim, Regional Manager - Water Resources DNRC 2273 BOOTHILL CT, STE 110 BOZEMAN, MT 59715 Re: Northwest Crossing Phase 2 Subdivision MMI# 6787.002 Dear Ms. Strasheim: We are soliciting your comments regarding a proposed multiple lot major subdivision located in Bozeman, on the south side of Baxter Lane, and west side of the Cottonwood Road Alignment. The Preliminary Plat for this subdivision is currently being prepared for submittal to the City of Bozeman. A copy of both the Phase II Pre-Application Plan and Phase I Preliminary Plat (Phase II will be located on Restricted Lots 1-5) is enclosed for your reference. The proposed subdivision will cover approximately 44 plus acres and is requesting to be subdivided into multiple lots. The property is currently zoned REMU – Residential Emphasis Mixed Use. The project is located within the city limits of Bozeman and will be served by city infrastructure/services. Ingress and egress to the proposed subdivision will be provided by Baxter Lane (north), Harvest Parkway (south – currently being built with Phase 1) and Cottonwood Road (east). Cottonwood Road from Oak to Baxter is a City of Bozeman Capital Improvements Project - project #CIP No. SIF 138 and is scheduled to be constructed summer/ fall of 2022 with completion in 2023. As part of the subdivision application process, we are requesting any comments you may have regarding the proposed subdivision. Should you have any comments or questions, they may be directed to the address and phone number provided above. You may also feel free to contact me directly at (406) 431-5819 or mekstrom@m-m.net. Thank you for your consideration. Sincerely, ______________________________ Matt Ekstrom, PE Project Manager July 29, 2021 Brian Sprenger, Airport Director Gallatin Airport Authority 850 GALLATIN FIELD RD BELGRADE, MT 59714 Re: Northwest Crossing Phase 2 Subdivision MMI# 6787.002 Dear Mr. Sprenger: We are soliciting your comments regarding a proposed multiple lot major subdivision located in Bozeman, on the south side of Baxter Lane, and west side of the Cottonwood Road Alignment. The Preliminary Plat for this subdivision is currently being prepared for submittal to the City of Bozeman. A copy of both the Phase II Pre-Application Plan and Phase I Preliminary Plat (Phase II will be located on Restricted Lots 1-5) is enclosed for your reference. The proposed subdivision will cover approximately 44 plus acres and is requesting to be subdivided into multiple lots. The property is currently zoned REMU – Residential Emphasis Mixed Use. The project is located within the city limits of Bozeman and will be served by city infrastructure/services. Ingress and egress to the proposed subdivision will be provided by Baxter Lane (north), Harvest Parkway (south – currently being built with Phase 1) and Cottonwood Road (east). Cottonwood Road from Oak to Baxter is a City of Bozeman Capital Improvements Project - project #CIP No. SIF 138 and is scheduled to be constructed summer/ fall of 2022 with completion in 2023. As part of the subdivision application process, we are requesting any comments you may have regarding the proposed subdivision. Should you have any comments or questions, they may be directed to the address and phone number provided above. You may also feel free to contact me directly at (406) 431-5819 or mekstrom@m-m.net. Thank you for your consideration. Sincerely, ______________________________ Matt Ekstrom, PE Project Manager July 29, 2021 Levi Ewan Gallatin County Road and Bridge Dept 205 BAXTER LN W BOZEMAN, MT 59718 Re: Northwest Crossing Phase 2 Subdivision MMI# 6787.002 Dear Mr. Ewan: We are soliciting your comments regarding a proposed multiple lot major subdivision located in Bozeman, on the south side of Baxter Lane, and west side of the Cottonwood Road Alignment. The Preliminary Plat for this subdivision is currently being prepared for submittal to the City of Bozeman. A copy of both the Phase II Pre-Application Plan and Phase I Preliminary Plat (Phase II will be located on Restricted Lots 1-5) is enclosed for your reference. The proposed subdivision will cover approximately 44 plus acres and is requesting to be subdivided into multiple lots. The property is currently zoned REMU – Residential Emphasis Mixed Use. The project is located within the city limits of Bozeman and will be served by city infrastructure/services. Ingress and egress to the proposed subdivision will be provided by Baxter Lane (north), Harvest Parkway (south – currently being built with Phase 1) and Cottonwood Road (east). Cottonwood Road from Oak to Baxter is a City of Bozeman Capital Improvements Project - project #CIP No. SIF 138 and is scheduled to be constructed summer/ fall of 2022 with completion in 2023. As part of the subdivision application process, we are requesting any comments you may have regarding the proposed subdivision. Should you have any comments or questions, they may be directed to the address and phone number provided above. You may also feel free to contact me directly at (406) 431-5819 or mekstrom@m-m.net. Thank you for your consideration. Sincerely, ______________________________ Matt Ekstrom, PE Project Manager July 29, 2021 Sheriff Dan Springer Gallatin County Sheriff's Office 615 S 16TH AVE BOZEMAN, MT 59715 Re: Northwest Crossing Phase 2 Subdivision MMI# 6787.002 Dear Sheriff Springer: We are soliciting your comments regarding a proposed multiple lot major subdivision located in Bozeman, on the south side of Baxter Lane, and west side of the Cottonwood Road Alignment. The Preliminary Plat for this subdivision is currently being prepared for submittal to the City of Bozeman. A copy of both the Phase II Pre-Application Plan and Phase I Preliminary Plat (Phase II will be located on Restricted Lots 1-5) is enclosed for your reference. The proposed subdivision will cover approximately 44 plus acres and is requesting to be subdivided into multiple lots. The property is currently zoned REMU – Residential Emphasis Mixed Use. The project is located within the city limits of Bozeman and will be served by city infrastructure/services. Ingress and egress to the proposed subdivision will be provided by Baxter Lane (north), Harvest Parkway (south – currently being built with Phase 1) and Cottonwood Road (east). Cottonwood Road from Oak to Baxter is a City of Bozeman Capital Improvements Project - project #CIP No. SIF 138 and is scheduled to be constructed summer/ fall of 2022 with completion in 2023. As part of the subdivision application process, we are requesting any comments you may have regarding the proposed subdivision. Should you have any comments or questions, they may be directed to the address and phone number provided above. You may also feel free to contact me directly at (406) 431-5819 or mekstrom@m-m.net. Thank you for your consideration. Sincerely, ______________________________ Matt Ekstrom, PE Project Manager July 29, 2021 Med Trans MT 2101 INDUSTRIAL DR BOZEMAN, MT 59715 Re: Northwest Crossing Phase 2 Subdivision MMI# 6787.002 To Whom It May Concern: We are soliciting your comments regarding a proposed multiple lot major subdivision located in Bozeman, on the south side of Baxter Lane, and west side of the Cottonwood Road Alignment. The Preliminary Plat for this subdivision is currently being prepared for submittal to the City of Bozeman. A copy of both the Phase II Pre-Application Plan and Phase I Preliminary Plat (Phase II will be located on Restricted Lots 1-5) is enclosed for your reference. The proposed subdivision will cover approximately 44 plus acres and is requesting to be subdivided into multiple lots. The property is currently zoned REMU – Residential Emphasis Mixed Use. The project is located within the city limits of Bozeman and will be served by city infrastructure/services. Ingress and egress to the proposed subdivision will be provided by Baxter Lane (north), Harvest Parkway (south – currently being built with Phase 1) and Cottonwood Road (east). Cottonwood Road from Oak to Baxter is a City of Bozeman Capital Improvements Project - project #CIP No. SIF 138 and is scheduled to be constructed summer/ fall of 2022 with completion in 2023. As part of the subdivision application process, we are requesting any comments you may have regarding the proposed subdivision. Should you have any comments or questions, they may be directed to the address and phone number provided above. You may also feel free to contact me directly at (406) 431-5819 or mekstrom@m-m.net. . Thank you for your consideration. Sincerely, ______________________________ Matt Ekstrom, PE Project Manager July 29, 2021 Montana Fish, Wildlife, and Parks 1400 S 19TH AVE BOZEMAN, MT 59718 Re: Northwest Crossing Phase 2 Subdivision MMI# 6787.002 To Whom It May Concern: We are soliciting your comments regarding a proposed multiple lot major subdivision located in Bozeman, on the south side of Baxter Lane, and west side of the Cottonwood Road Alignment. The Preliminary Plat for this subdivision is currently being prepared for submittal to the City of Bozeman. A copy of both the Phase II Pre-Application Plan and Phase I Preliminary Plat (Phase II will be located on Restricted Lots 1-5) is enclosed for your reference. The proposed subdivision will cover approximately 44 plus acres and is requesting to be subdivided into multiple lots. The property is currently zoned REMU – Residential Emphasis Mixed Use. The project is located within the city limits of Bozeman and will be served by city infrastructure/services. Ingress and egress to the proposed subdivision will be provided by Baxter Lane (north), Harvest Parkway (south – currently being built with Phase 1) and Cottonwood Road (east). Cottonwood Road from Oak to Baxter is a City of Bozeman Capital Improvements Project - project #CIP No. SIF 138 and is scheduled to be constructed summer/ fall of 2022 with completion in 2023. As part of the subdivision application process, we are requesting any comments you may have regarding the proposed subdivision. Should you have any comments or questions, they may be directed to the address and phone number provided above. You may also feel free to contact me directly at (406) 431-5819 or mekstrom@m-m.net. Thank you for your consideration. Sincerely, ______________________________ Matt Ekstrom, PE Project Manager July 29, 2021 NorthWestern Energy PO BOX 490 BOZEMAN, MT 59771 Re: Northwest Crossing Phase 2 Subdivision MMI# 6787.002 To Whom It May Concern We are soliciting your comments regarding a proposed multiple lot major subdivision located in Bozeman, on the south side of Baxter Lane, and west side of the Cottonwood Road Alignment. The Preliminary Plat for this subdivision is currently being prepared for submittal to the City of Bozeman. A copy of both the Phase II Pre-Application Plan and Phase I Preliminary Plat (Phase II will be located on Restricted Lots 1-5) is enclosed for your reference. The proposed subdivision will cover approximately 44 plus acres and is requesting to be subdivided into multiple lots. The property is currently zoned REMU – Residential Emphasis Mixed Use. The project is located within the city limits of Bozeman and will be served by city infrastructure/services. Ingress and egress to the proposed subdivision will be provided by Baxter Lane (north), Harvest Parkway (south – currently being built with Phase 1) and Cottonwood Road (east). Cottonwood Road from Oak to Baxter is a City of Bozeman Capital Improvements Project - project #CIP No. SIF 138 and is scheduled to be constructed summer/ fall of 2022 with completion in 2023. As part of the subdivision application process, we are requesting any comments you may have regarding the proposed subdivision. Should you have any comments or questions, they may be directed to the address and phone number provided above. You may also feel free to contact me directly at (406) 431-5819 or mekstrom@m-m.net. . Thank you for your consideration. Sincerely, ______________________________ Matt Ekstrom, PE Project Manager August 18, 2021 Moira Stanish, Territory Representative Republic Solid Waste Services 8600 Huffine Lane BOZEMAN, MT 59718 Re: Northwest Crossing Phase 2 Subdivision MMI# 6787.002 Dear Ms. Stanish: We are soliciting your comments regarding a proposed multiple lot major subdivision located in Bozeman, on the south side of Baxter Lane, and west side of the Cottonwood Road Alignment. The Preliminary Plat for this subdivision is currently being prepared for submittal to the City of Bozeman. A copy of both the Phase II Pre-Application Plan and Phase I Preliminary Plat (Phase II will be located on Restricted Lots 1-5) is enclosed for your reference. The proposed subdivision will cover approximately 44 plus acres and is requesting to be subdivided into multiple lots. The property is currently zoned REMU – Residential Emphasis Mixed Use. The project is located within the city limits of Bozeman and will be served by city infrastructure/services. Ingress and egress to the proposed subdivision will be provided by Baxter Lane (north), Harvest Parkway (south – currently being built with Phase 1) and Cottonwood Road (east). Cottonwood Road from Oak to Baxter is a City of Bozeman Capital Improvements Project - project #CIP No. SIF 138 and is scheduled to be constructed summer/ fall of 2022 with completion in 2023. As part of the subdivision application process, we are requesting any comments you may have regarding the proposed subdivision. Should you have any comments or questions, they may be directed to the address and phone number provided above. You may also feel free to contact me directly at (406) 431-5819 or mekstrom@m-m.net. Thank you for your consideration. Sincerely, ______________________________ Matt Ekstrom, PE Project Manager July 29, 2021 Damon Murdo, Cultural Records Manager State Historic Preservation Office PO BOX 201202 HELENA, MT 59620 Re: Northwest Crossing Phase 2 Subdivision MMI# 6787.002 Dear Mr. Murdo: We are soliciting your comments regarding a proposed multiple lot major subdivision located in Bozeman, on the south side of Baxter Lane, and west side of the Cottonwood Road Alignment. The Preliminary Plat for this subdivision is currently being prepared for submittal to the City of Bozeman. A copy of both the Phase II Pre-Application Plan and Phase I Preliminary Plat (Phase II will be located on Restricted Lots 1-5) is enclosed for your reference. The proposed subdivision will cover approximately 44 plus acres and is requesting to be subdivided into multiple lots. The property is currently zoned REMU – Residential Emphasis Mixed Use. The project is located within the city limits of Bozeman and will be served by city infrastructure/services. Ingress and egress to the proposed subdivision will be provided by Baxter Lane (north), Harvest Parkway (south – currently being built with Phase 1) and Cottonwood Road (east). Cottonwood Road from Oak to Baxter is a City of Bozeman Capital Improvements Project - project #CIP No. SIF 138 and is scheduled to be constructed summer/ fall of 2022 with completion in 2023. As part of the subdivision application process, we are requesting any comments you may have regarding the proposed subdivision. Should you have any comments or questions, they may be directed to the address and phone number provided above. You may also feel free to contact me directly at (406) 431-5819 or mekstrom@m-m.net. Thank you for your consideration. Sincerely, ______________________________ Matt Ekstrom, PE Project Manager July 29, 2021 United States Postal Service 2201 BAXTER LN BOZEMAN, MT 59718 Re: Northwest Crossing Phase 2 Subdivision MMI# 6787.002 To Whom It May Concern: We are soliciting your comments regarding a proposed multiple lot major subdivision located in Bozeman, on the south side of Baxter Lane, and west side of the Cottonwood Road Alignment. The Preliminary Plat for this subdivision is currently being prepared for submittal to the City of Bozeman. A copy of both the Phase II Pre-Application Plan and Phase I Preliminary Plat (Phase II will be located on Restricted Lots 1-5) is enclosed for your reference. The proposed subdivision will cover approximately 44 plus acres and is requesting to be subdivided into multiple lots. The property is currently zoned REMU – Residential Emphasis Mixed Use. The project is located within the city limits of Bozeman and will be served by city infrastructure/services. Ingress and egress to the proposed subdivision will be provided by Baxter Lane (north), Harvest Parkway (south – currently being built with Phase 1) and Cottonwood Road (east). Cottonwood Road from Oak to Baxter is a City of Bozeman Capital Improvements Project - project #CIP No. SIF 138 and is scheduled to be constructed summer/ fall of 2022 with completion in 2023. As part of the subdivision application process, we are requesting any comments you may have regarding the proposed subdivision. Should you have any comments or questions, they may be directed to the address and phone number provided above. You may also feel free to contact me directly at (406) 431-5819 or mekstrom@m-m.net. Thank you for your consideration. Sincerely, ______________________________ Matt Ekstrom, PE Project Manager July 29, 2021 Farmers Canal Company PO BOX 10686 BOZEMAN, MT 59719 Re: Northwest Crossing Phase 2 Subdivision MMI# 6787.002 To Whom It May Concern We are soliciting your comments regarding a proposed multiple lot major subdivision located in Bozeman, on the south side of Baxter Lane, and west side of the Cottonwood Road Alignment. The Preliminary Plat for this subdivision is currently being prepared for submittal to the City of Bozeman. A copy of both the Phase II Pre-Application Plan and Phase I Preliminary Plat (Phase II will be located on Restricted Lots 1-5) is enclosed for your reference. The proposed subdivision will cover approximately 44 plus acres and is requesting to be subdivided into multiple lots. The property is currently zoned REMU – Residential Emphasis Mixed Use. The project is located within the city limits of Bozeman and will be served by city infrastructure/services. Ingress and egress to the proposed subdivision will be provided by Baxter Lane (north), Harvest Parkway (south – currently being built with Phase 1) and Cottonwood Road (east). Cottonwood Road from Oak to Baxter is a City of Bozeman Capital Improvements Project - project #CIP No. SIF 138 and is scheduled to be constructed summer/ fall of 2022 with completion in 2023. As part of the subdivision application process, we are requesting any comments you may have regarding the proposed subdivision. Should you have any comments or questions, they may be directed to the address and phone number provided above. You may also feel free to contact me directly at (406) 431-5819 or mekstrom@m-m.net. Thank you for your consideration. Sincerely, ______________________________ Matt Ekstrom, PE Project Manager N:\6787\002 - NW Crossing Ph II Pre Plat\04 Design\Platting\Pre-Plat\Merged Agency Letters.docx August 18, 2021 Bozeman Public Schools 404 W. Main St. BOZEMAN, MT 59715 Re: Northwest Crossing Phase 2 Subdivision MMI# 6787.002 To Whom It May Concern: We are soliciting your comments regarding a proposed multiple lot major subdivision located in Bozeman, on the south side of Baxter Lane, and west side of the Cottonwood Road Alignment. The Preliminary Plat for this subdivision is currently being prepared for submittal to the City of Bozeman. A copy of both the Phase II Pre-Application Plan and Phase I Preliminary Plat (Phase II will be located on Restricted Lots 1-5) is enclosed for your reference. The proposed subdivision will cover approximately 44 plus acres and is requesting to be subdivided into multiple lots. The property is currently zoned REMU – Residential Emphasis Mixed Use. The project is located within the city limits of Bozeman and will be served by city infrastructure/services. Ingress and egress to the proposed subdivision will be provided by Baxter Lane (north), Harvest Parkway (south – currently being built with Phase 1) and Cottonwood Road (east). Cottonwood Road from Oak to Baxter is a City of Bozeman Capital Improvements Project - project #CIP No. SIF 138 and is scheduled to be constructed summer/ fall of 2022 with completion in 2023. As part of the subdivision application process, we are requesting any comments you may have regarding the proposed subdivision. Should you have any comments or questions, they may be directed to the address and phone number provided above. You may also feel free to contact me directly at (406) 431-5819 or mekstrom@m-m.net. Thank you for your consideration. Sincerely, ______________________________ Matt Ekstrom, PE Project Manager