Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
12 - Street & Roads - Plan & Profiles 5
0+00 1+00 2+00 3+00 4+005+006+007+008+009+0010+0011+0012+0013+0014+0015+0016+00 16+17 PC: 2+56.65 PT: 4+21.58PI: 5+05.78PC: 15+69.78NORTH DAYSPRING PH2 4700 4705 4710 4715 4720 4725 4730 4735 4700 4705 4710 4715 4720 4725 4730 4735 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+0016+17 FG-EG-0+00 FG-4716.78EG-4716.78FG-4716.29EG-4716.291+00 FG-4715.76EG-4715.76FG-4715.23EG-4715.232+00 FG-4714.81EG-4714.81FG-4714.56EG-4714.563+00 FG-4714.31EG-4714.31FG-4714.06EG-4714.064+00 FG-4714.10EG-4714.10FG-4714.60EG-4714.605+00 FG-4714.42EG-4714.42FG-4714.82EG-4714.826+00 FG-4715.22EG-4715.22FG-4715.45EG-4715.457+00 FG-4715.45EG-4715.45FG-4715.21EG-4715.218+00 FG-4714.76EG-4714.76FG-4714.27EG-4714.279+00 FG-4713.79EG-4713.79FG-4713.89EG-4713.8910+00 FG-4713.86EG-4713.86FG-4714.20EG-4714.2011+00 FG-4714.55EG-4714.55FG-4714.90EG-4714.9012+00 FG-4715.25EG-4715.25FG-4715.60EG-4715.6013+00 FG-4715.94EG-4715.94FG-4716.29EG-4716.2914+00 FG-4716.64EG-4716.64FG-4716.99EG-4716.9915+00 FG-4717.33EG-4717.33FG-4717.68EG-4717.6816+00 FG-4717.80EG-4717.8016+17 0.50% -1.06% -0.50%STA=0+06.71ELEV=4716.78STA=16+16.90ELEV=4717.80STA=2+29.84ELEV=4714.91STA=4+21.58ELEV=4713.95VPI STA=7+33.23 VPI ELEV=4715.89 K=105.00 LVC=185.48'VPC STA=6+40.49VPC ELEV=4715.15VPT STA=8+25.97VPT ELEV=4714.990.80% 0.70% VERIFY SCALE! THESE PRINTS MAY BE REDUCED. LINE BELOW MEASURES ONE INCH ON ORIGINAL DRAWING. MODIFY SCALE ACCORDINGLY! 2022COPYRIGHT © MORRISON-MAIERLE, SHEET NUMBER PROJECT NUMBER DRAWING NUMBER DATEDESCRIPTIONNO.BY N:\6787\002 - NW CROSSING PH II PRE PLAT\ACAD\SHEETS\6787002_ROAD-DAYSPRING-NORTH.DWGREVISIONS DRAWN BY: DSGN. BY: APPR. BY: DATE: Q.C. REVIEW DATE: BY: 2880 Technology Blvd West Bozeman, MT 59718 406.587.0721 www.m-m.net engineers surveyors planners scientists MorrisonMaierle PLOTTED BY:COOPER KRAUSE ON Apr/06/2022 NORTHWEST CROSSING SUBDIVISION PHASE 2 BOZEMAN MONTANA DAYSRING AVENUE- NORTH PRELIMINARY PLAN & PROFILE 6787.002 ---- R-5 CGM CPK MEE 04/2022 0 VERT. SCALE IN FEET 0 HORIZ. SCALE IN FEET 36 6 12 3060 60 120 PROPOSED GROUND AT ROAD CENTERLINE EXISTING GROUND AT ROAD CENTERLINEROSA WAYTWIN LAKES RDDAYSPRING AVE TOUCHSTONE DR CENTERLINETOUCHSTONE DRCENTERLINEROSA WAYCENTERLINETWIN LAKES RDDAYSPRING AVE - NORTH ESTIMATED HIGH GROUNDWATER AT ROAD CENTERLINE