HomeMy WebLinkAbout107-Stormwater Report Stormwater Report: for NELSON MEADOWS LOT 17 Gallatin County, Montana March, 2022 Prepared For: DGB Development, LLC Prepared By: Hyalite Engineers, PLLC Brett Megaard, PE 12/2/2022 Page 1 NELSON MEADOWS LOT 17 ENGINEER’S STORM DRAINAGE DESIGN REPORT Owner: DGB Development, LLC 244 Cirque Dr. Bozeman, MT 59718-9315 Introduction This report provides a design basis and hydrologic calculations for sizing stormwater infrastructure for Nelson Meadows Lot 17. The project site is located 0.05 miles south of the Royal Wolf Way and Prince Lane intersection. This project in total is 0.97 acres of multifamily housing and small office space development constructed in one proposed phase. The owner would like to construct two buildings. The existing site has topography sloping at approximately -2.5% to the northeast. There is currently no existing stormwater infrastructure on the lot. All precipitation is currently either contained on site through absorption and infiltration or runs offsite to the northeast. The City of Bozeman Design Standards and Specifications (March 2004) was used as the primary guideline for this stormwater drainage design. General Design The proposed development of the site will be 68% impervious area containing buildings, asphalt driveways, and concrete walkways and 32% pervious area of undisturbed land. Groundwater observed 0.5 miles to the southwest of this site was found at depths ranging from 3’ or deeper, while monitoring wells 1 mile to the northeast ranged from 5’ or deeper. The proposed building will have roof drains that will capture rainwater which will then be routed to a surface retention pond. The site is graded so that runoff from all the areas will runoff into the proposed surface retention ponds. Hydrologic Methodology The modified rational method was used to calculate retention volumes. The modified rational method is used to compute runoff for storm durations equal to or greater than time of concentration. Total runoff volume is computed by multiplying the duration of the storm by the runoff rate. Retention volumes were calculated using the following formulas: Q = CIA V = DQ Where: C = Weighted C Factor I = Storm Intensity (in/hr) A = Area (acres) Q = Runoff (cfs) D= Duration (s) V = Volume (cf) Retention volumes were analyzed for the 10-year 2-hour and 100-year 2-hour and 24-hour storms using Figure I-3 from The City of Bozeman design Standards (March 2004). Runoff coefficients and watershed flow calculations are included in Appendix A. Page 2 Stormwater Retention Ponds The stormwater retention ponds were designed to be sized for the development of Nelson Meadows Lot 17. The proposed 30’x15’ retention pond will be installed to account for the runoff from the southern half of the proposed Building 1 and the area in front of it. The proposed 60’x12’ retention pond will be installed to account for the runoff from the proposed Building 2 and the area to the northeast of it. The irregular shaped retention pond (70’x60’x45’) will be installed to account for the runoff from the driveways/parking areas and the small areas surrounding them. A drainage area exhibit is included with this report in Appendix B. The flow of water will also follow existing conditions and flow to the northwest into swales to capture the stormwater and route them to the proposed ponds. The stormwater calculations for these areas are included in Appendix A. Flooding Excessive runoff from a large storm event will be routed such that runoff does not inundate home sites, drainfields or over top the roadway. Finished floor elevations of buildings will be set higher than the surrounding ground with finished ground sloping away from them. In the event that the ponds overtop, stormwater will spill to the northeast away from the proposed buildings. Appendix A – Stormwater Retention Pond Calculations Appendix B – Drainage Area Exhibit N E L S O N M E A D O W S L O T 1 7 M A R C H 2 0 2 2 A P P E N D I X APPENDIX A STORMWATER RETENTION POND CALCULATIONS NELSON MEADOWS LOT 17 Stormwater Basin 1 Page 1 of 1 2/9/2022 By Cody Kerkaert RETENTION CHAMBER Design Storm: 10-Year, 2 Hour (City of Bozeman) Basin Area (ac): 0.15 Post-Dev C (weighted): 0.57 Storm Duration (min)120.00 Weighted Runoff Co-efficent: Area Runoff (acres) Coefficient Calculations Impervious 0.08 0.90 0.07 Undisturbed 0.07 0.20 0.01 Totals 0.15 0.09 Cw =0.57 Runoff Rate (Rational Method): Storm Event (yr): 2-yr, 2-hr 10-yr, 2-hr 25-yr, 2-hr 100-yr, 2-hr 100-yr, 24-hr *Storm Coeff. A: 0.36 0.64 0.78 1.01 1.01 *Storm Coeff. B:0.60 0.65 0.64 0.67 0.67 Composite C: 0.57 0.57 0.57 0.57 0.57 Storm Intensity (in/hr): 0.24 0.41 0.50 0.63 0.12 Post-Dev Qp (cfs): 0.02 0.04 0.04 0.05 0.01 Pond Size: 10-Year, 2 Hour Storm Duration Time: 7200.00 sec V10YR/2HR : 253 cf *Values are from COB Design Standards Figure 2 - Rainfall Intensity Druation in Minutes NELSON MEADOWS LOT 17 Stormwater Basin 2 Page 1 of 1 2/9/2022 By Cody Kerkaert RETENTION CHAMBER Design Storm: 10-Year, 2 Hour (City of Bozeman) Basin Area (ac): 0.17 Post-Dev C (weighted): 0.65 Storm Duration (min)120.00 Weighted Runoff Co-efficent: Area Runoff (acres) Coefficient Calculations Impervious 0.11 0.90 0.10 Undisturbed 0.06 0.20 0.01 Totals 0.17 0.11 Cw =0.65 Runoff Rate (Rational Method): Storm Event (yr): 2-yr, 2-hr 10-yr, 2-hr 25-yr, 2-hr 100-yr, 2-hr 100-yr, 24-hr *Storm Coeff. A: 0.36 0.64 0.78 1.01 1.01 *Storm Coeff. B:0.60 0.65 0.64 0.67 0.67 Composite C: 0.65 0.65 0.65 0.65 0.65 Storm Intensity (in/hr): 0.24 0.41 0.50 0.63 0.12 Post-Dev Qp (cfs): 0.03 0.05 0.06 0.07 0.01 Pond Size: 10-Year, 2 Hour Storm Duration Time: 7200.00 sec V10YR/2HR : 326 cf *Values are from COB Design Standards Figure 2 - Rainfall Intensity Druation in Minutes NELSON MEADOWS LOT 17 Stormwater Basin 3 Page 1 of 1 2/9/2022 By Cody Kerkaert RETENTION CHAMBER Design Storm: 10-Year, 2 Hour (City of Bozeman) Basin Area (ac): 0.65 Post-Dev C (weighted): 0.71 Storm Duration (min)120.00 Weighted Runoff Co-efficent: Area Runoff (acres) Coefficient Calculations Impervious 0.47 0.90 0.42 Undisturbed 0.18 0.20 0.04 Totals 0.65 0.46 Cw =0.71 Runoff Rate (Rational Method): Storm Event (yr): 2-yr, 2-hr 10-yr, 2-hr 25-yr, 2-hr 100-yr, 2-hr 100-yr, 24-hr *Storm Coeff. A: 0.36 0.64 0.78 1.01 1.01 *Storm Coeff. B:0.60 0.65 0.64 0.67 0.67 Composite C: 0.71 0.71 0.71 0.71 0.71 Storm Intensity (in/hr): 0.24 0.41 0.50 0.63 0.12 Post-Dev Qp (cfs): 0.11 0.19 0.23 0.29 0.06 Pond Size: 10-Year, 2 Hour Storm Duration Time: 7200.00 sec V10YR/2HR : 1348 cf *Values are from COB Design Standards Figure 2 - Rainfall Intensity Druation in Minutes N E L S O N M E A D O W S L O T 1 7 M A R C H 2 0 2 2 A P P E N D I X APPENDIX B DRAINAGE AREA EXHIBIT