Loading...
HomeMy WebLinkAbout101-Site Plan Application Narrative_03182022 March 18, 2022 Project Narrative Nelson Meadows Lofts Site Plan Application Project Narrative These two-story buildings being proposed will be built on block 4, lot 17 of the Nelson Meadows Subdivision. The first story of each of the two buildings will be composed of (4) mixed use units. These uses will vary from commercial to industrial. The second story of each building will contain (4) residential units. The buildings will be served by a central parking lot and surrounded by perimeter landscaped yards. The buildings will be sided with a combination of cement board panel and metal siding with natural wood accents. The simple broken gable roof covered in standing seam metal roofing will be built of R- panels, the exterior walls framed of wood, the second floors constructed of poured concrete slabs over steel pan deck and the foundation will be constructed of a poured-in-place concrete frost wall with concrete slab for the ground floor. The contemporary industrial style of the building is designed to fit into the surrounding M-1 zoning district. Each pair of business and residential spaces in each building is accessed by a common entrance leading from the entry sidewalk and parking area to the ground-floor unit. From this entrance, a stair connects to the second-story residential unit. The ground floor business spaces will have both front and rear entrance/exits. While the upper residential units will have rear outdoor balconies. Parking is located on the interior of the lot with the buildings to either side. Two street accesses allow easy flow into and out of the parking lot. A landscape buffer has been designed between the street-side building and Royal Wolf Way. Community Open Space has been provided in the Pavilion and Community Garden Plots. Bicycle parking has been centrally located north of the interior building. Access to the buildings from the vehicle parking area, bike parking area and Royal Wolf Way will be gained via a system of concrete sidewalks along Royal Wolf Way to the street-side building entrances and on to the interior of the lot. Construction is proposed to start in early Summer 2022 and be completed in Spring 2023 for final occupancy. To facilitate this project timeline, we are also requesting concurrent review of both the Site Plan Application and the Building Permit Application.