HomeMy WebLinkAboutNarrativeSeptember 21, 2022 City of Bozeman Community Development 20 East Olive Street Bozeman, MT 59715 Phase 2 & 3 West Side Flats 5161, 5163, 5167, 5171, 5173, and 5177 Fallon Street We are proposing a new apartment project between Fallon Street and West Babcock Street west of the , JC Billion campus. The 8.77 acre project site is zoned as R-O. As proposed the project would include (4) 12-plex apartment buildings, (5) 18-plex apartment buildings. It is our intention to create a high quality, attractive, and efficient apartment project. Another goal is to offer affordable rental rates while ensuring the project is financially viable for the developer. The design includes three story apartment buildings designed for maximum privacy, views, ease of construction and quality living space. The building exteriors include low maintenance materials including cement board siding, metal corrugated siding and fascia, and asphalt and metal roofing. The apartments project includes ample outdoor space in common areas, patios, or decks. When all phases are complete the project would include 138 two-bedroom apartments. The required parking for the project is 276 spaces. As proposed the site plan includes 280 parking spaces. For the special residential block frontage, we choose option #2a of 38.510.030.J. Reference the A1.0 Site Plan for dimensions between buildings and sidewalks. Reference the landscape drawings for landscaping between the building and sidewalks. We would like for construction to begin in Spring 2022 for all three phases. The Phase 1 building plans have been conditionally approved. The Phase 2 and 3 site will conform to the approved master site plan #20224. The infrastructure has been approved for all phases. The Master Site and Phase 1 applications have been approved, and the approved design reports have been uploaded to the Documents folder. Thanks for everyone’s time in the review of the West Side Flats project. Jesse Sobrepena, AIA JDS Architects, Inc. Conceptual Review Responses: Planning Division, Sarah Rosenberg, srosenberg@bozeman.net, 406-582-2297 1. The formal submittal will require review by the Design Review Board. 2. The infrastructure (roads, trails, utilities) must be completed in Phase I. A phasing plan is required with the formal submittal. Response: The water and sewer infrastructure will be installed with Phase 1. The gravel trail running north-south will be installed with Phase 1. 3. Sec. 38.350.050.A. Uncovered decks/stoops may encroach 5 feet into the rear setback. Ensure that the deck encroaching into the rear setback on the 18-unit building along Dragonfly meets these standards. Response: The decks/stoops encroach at 4’-6” into the rear setback. 4. Sec. 38.410.040. The pedestrian trails that connect east-west must have a 30 foot access easement throughout the entirety of the trail. Setbacks to this easement must not be less than 5 feet. Response: A 30-foot trail easement and document has been provided for the pedestrian connection running east-west. 5. Sec. 38.410.100.A.2.d. Due to being in the watercourse setback, the proposed trail must be permeable pavers. The existing east-west trail on Lot 2A must be improved with permeable pavers. Response: Discussion with the Parks department indicated that the 6’ Class II gravel trail would be sufficient, and less intrusive to the wetland setback that permeable pavers. 6. The subject property contains three different block frontages: Landscaped, Trail/Park, and Special Residential. The order of precedence for these is as follows: a. Sec. 38.510.030.C. Landscape Block Frontage. Fallon Street and Babcock Street must follow this block frontage standard. Ensure that the common building along Fallon meets these standards. Response: Please see sheet A3 for façade transparency table. A1 has the correct block frontage standards. b. Sec. 38.510.030.I. Trail/Park Frontage. This frontage must comply with mixed block frontage standards. Ensure the buildings meet façade transparency for residential provided in this section. Response: See sheet A3 for façade transparency table. See landscaping plan. c. Sec. 38.510.030.J. Special Residential. Ensure that every building feature at least one of the public/private space transitions described in this standard. The internal road needs to be separated by raised deck, 10’ setback, or raised ground floor. Response: There is a 10’ setback from the internal road. 7. Sec. 38.520.040.C.3 Ensure that the crosswalks that are crossing the on-site paved areas are contrasting materials and/or patterns. There needs to be crosswalks anywhere the sidewalk crosses onto the street/drive aisle. Response: Stamped Concrete crosswalks are provided at all necessary. 8. Sec. 38.520.040.C.5. The sidewalk on the south side of Dragon Fly Street and May Fly Street need to connect to the adjacent subdivision to the west. Response: The sidewalks connect to the 5’ sidewalks in the adjacent subdivision. 9. Sec. 38.520.040.D. The pathways in front of a parking area are required to be 7 feet. Ensure that the pathways are separated from the structures by at least 3 feet of landscaping. Response: The pathway in front of the parking area is now 7 feet. See the landscaping plan for the 3’ landscaping from the structures. 10. Sec. 38.520.050.D. Ensure that the landscaping meets internal roadway design standards and that they include street trees. Response: Street trees have been added to meet landscaping standards. See landscaping plan. 11. Sec. 38.540.050. 284 parking spaces are provided when 288 spaces are required. There are some allowable reductions to parking requirements for residential uses. Response: With the updated site plan 276 spaces are required, there are 280 proposed. a. Parking is not permitted in required front or side setbacks. Response: There is no parking in front and rear setbacks. b. The number of bicycle parking spaces must be at least ten percent of the number of car parking. Response: The number of bicycle parking is 28. There are 56 bicycles provided. Engineering Division, Anna Russell, arussell@bozeman.net, 406-582-2281 1. See attached memo Solid Waste Division; Russ Ward, rward@bozeman.net, 406-582-3235 1. Need to identify location of refuse enclosures. Response: See site plan for location of the refuse enclosures. 2. Need details plan for refuse enclosure. Response: See site plan details for detailed refuse enclosure. 3. Refuse enclosure will need to be covered. Response: See site detail sheet for detail drawing of refuse enclosure. Parks and Recreation; Addi Jadin, ajadin@bozeman.net, 406-582-2908 1. BMC Section 38.420.020.A.1. This subdivision has not already provided parkland for the subject parcel in the R-O zoning district. The parkland and cash-in-lieu of parkland (CILP) requirement for the estimated net area of 6.57 acres and 144 residential units is 1.58 acres of land and equivalent CILP value for 0.79 acres. Parkland requirement is based on net lot size as defined in Sec. 38.700.130. - N definitions and does not include street rights-of-way, common open spaces, park easements or dedications, etc.). 2. BMC Section 38.420.030. The parkland proposal must address the CILP criteria of Resolution 4784 with the Site Plan application. Current appraisal value for Cash-in-lieu is $1.60 per square foot but will be determined at the time of Site Plan completeness. New appraisal value is expected in March 2020. CILP amount must be printed on the final Site Plan. Applicants may contact the Park Planner prior to formal application with proposed number of units and net lot area to get an estimated CILP amount. 3. All cash-in-lieu requests are reviewed by the Recreation and Parks Advisory Board Subdivision Review Committee. A meeting will be scheduled upon submittal of a formal application to planning. Applicants may contact the park planner for a preliminary discussion with the committee if it is desired. 4. BMC Section 38.420.020.G. Parks supports the creation of a linear park easement along Baxter Creek; however, per BMC 38.420.070.A.1.a., where the trail is within required watercourse setbacks, the pathway corridor cannot count toward the parkland dedication requirements. Parks and other departments would like to discuss with the applicants the exemptions from watercourse setback requirements in 38.410.100.A.2.e. to allow the trail to run to the east of Baxter Creek north of the bridge crossing to align with the existing trail across W. Babcock. Please contact the Park and Planning Department review staff to schedule a meeting. 5. BMC Section 38.420.110. – The trail is determined to be a recreation pathway. 6. The following additional conditions of approval are suggested: a. Crosswalk and pedestrian ramps where trail crosses West Babcock Street. 7. Submit a sign plan in accordance with the PROST Plan Appendix G. To meet the requirements of BMC 38.420.080.B. it is suggested that the signs demarcate the “Trail Easement Boundary” within the private lot.