HomeMy WebLinkAbout030.5 A3.2 ROOF PLAN 18-PLEXDESCRIPTION:NO:DATE:DRAWN BY:
CHECKED BY:
JOB NO:
PLOT SCALE:BY:2004-2022 JDS ARCHITECTSc
01-06-22 FALLON STREETSTAMP
No. 2557
SOBREPENA
JESSE D.AN
ATNOMFOETATS
T A N AMON
E MANBOZ
E
NSELI
C
A R CD H ITECTBOZEMAN, MTWEST SIDE FLATS 18-PLEXPHASE 2 & 3A3.2
1/8"=1'-0"
1/8"=1'-0"
ROOF PLAN 18-PLEXA
A3.2
DOWNSPOUT
SEAMLESS GUTTER
A
S3.1
A
S3.2
A
S3
19-073
JDS
JDS
RIDGERIDGERIDGE RIDGE RIDGE RIDGE RIDGE RIDGE RIDGE RIDGE RIDGE RIDGE RIDGE RIDGE RIDGESLOPE8:12SLOPE8:12SLOPE6:12SLOPE8:12SLOPE8:12SLOPE6:12SLOPE8:12SLOPE6:12SLOPE8:12SLOPE8:12SLOPE8:12SLOPE6:12SLOPE8:12SLOPE8:12SLOPE6:12SLOPE8:12SLOPE6:12SLOPE8:12SLOPE
6:12
SLOPE
1.5:12
SLOPE
1.5:12
SLOPE
1.5:12
SLOPE
6:12STEPSTEP3'-0"1'-0"1'-0"
ROOF OVERLAPS
@ STEP
ROOF OVERLAPS
@ STEP
EDGE OF WALL
BELOW1'-0"2'-0"SEAMLESS GUTTER TO
MATCH FASCIA COLOR
TYP.
SEAMLESS GUTTER TO
MATCH FASCIA COLOR
TYP.
VENT SCREEN VENT SCREEN VENT SCREEN
MECHNICAL VENT MECHNICAL VENT MECHNICAL VENT
VENT SCREEN
MECHNICAL VENT
VENT SCREEN VENT SCREEN
MECHNICAL VENT MECHNICAL VENT
NOTE:
PROVIDE SNOW BREAK
SYSTEM AT ALL STANDING SEAM
ROOFS, SEE ELEVATIONS
NOTE:
PROVIDE SNOW BREAK
SYSTEM AT ALL STANDING SEAM
ROOFS, SEE ELEVATIONS
NOTE:
PROVIDE SNOW BREAK
SYSTEM AT ALL STANDING SEAM
ROOFS, SEE ELEVATIONS
NOTE:
PROVIDE SNOW BREAK
SYSTEM AT ALL STANDING SEAM
ROOFS, SEE ELEVATIONS
NOTE:
PROVIDE SNOW BREAK
SYSTEM AT ALL STANDING SEAM
ROOFS, SEE ELEVATIONS2'-0"2'-0"2'-0"CRICKET AS
REQ'D
CRICKET AS
REQ'D
CRICKET AS
REQ'D8'-2"8'-2"1COB REVISIONS 03-09-22 AS