HomeMy WebLinkAbout012_L1.6SiteDetails3FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION----SITE DETAILS 3WESTLAKE PARK IMPROVEMENTSWESTLAKE PARK, BLOCK 1, WESTLAKE'S FOURTH SUBDIVISIONBOZEMAN, MONTANAL1.6 EJS18098_18_LS DETAILS.DWGALM08/03/211ST SP SUBMITTAL09/27/2212/27/22----2ND SP SUBMITTAL3RD SP SUBMITTAL------18098.18GEOGRID AS PER
GEOTECHNICAL ENGINEER30" TYP24" TYP
4' HT STEEL FENCING
COMPACTED SUBGRADE
24" X 30" ECOBLOCK
BACKFILL AS PER
GEOTECHNICAL ENGINEER
6"SECTION A - ECOBLOCK WALL
N.T.S.
UPPER MOUNTAIN
BIKE START HILL
4"22"8'4
L1.5
METAL FENCING
4' ALTERNATE BIDALTERNATE BID - UPPER
MOUNTAIN BIKE START HILL
1
4' HT STEEL FENCING
BACKFILL AS PER
GEOTECHNICAL ENGINEER
COMPACTED SUBGRADE
SECTION B - ECOBLOCK WALL
N.T.S.
PLANTING BED
24" X 30" ECOBLOCK
GEOGRID AS PER
GEOTECHNICAL ENGINEER
1
L1.4
CONCRETE
FLATWORK
UPPER MOUNTAIN BIKE
COURSE START HILL
4
L1.5
METAL FENCING
ALTERNATE BID - UPPER
MOUNTAIN BIKE START HILL
9' 3"24" TYP.30" TYP.9"6"4" TYP4' ALTERNATE BID3
L1.5
BENCH
2 4"24"24"
SECTION E - ECOBLOCK WALL
N.T.S.6"COMPACTED SUBGRADE
24" X 24" ECOBLOCK
BACKFILL AS PER
GEOTECHNICAL ENGINEER
CRUSHER FINES,
BMX RUNOUT
LAWN
3
6'24" TYP.30" TYP.4' HT STEEL FENCING
BACKFILL AS PER
GEOTECHNICAL ENGINEER
COMPACTED SUBGRADE
SECTION C - ECOBLOCK WALL
N.T.S.
PLANTING BED
24" X 30" ECOBLOCK
4
L1.5
METAL FENCING
5
L1.4
ASPHALT
PATH
GEOGRID AS PER
GEOTECHNICAL ENGINEER
18"6"4" TYP
MOUNTAIN BIKE
START HILL
4 4' 6"3.00'10"10"24" TYP.30" TYP.24" TYP.30" TYP.4' HT STEEL FENCING
4' HT STEEL FENCING
BACKFILL AS PER
GEOTECHNICAL ENGINEER
BACKFILL AS PER
GEOTECHNICAL ENGINEER
COMPACTED SUBGRADE
SECTION D - ECOBLOCK WALL
N.T.S.
MOUNTAIN BIKE
START HILL
24" X 30" ECOBLOCK
24" X 36" ECOBLOCK 6"4
L1.5
METAL FENCING
5
L1.4
ASPHALT
PATH6"6"20"20"6"4" TYP
MOUNTAIN BIKE
START HILL
5
p:\18098_18_westlake_bmx_track_landscape_&_design\CADD_C3D\production_dwg\18098_18_LS DETAILS.dwg, SITE DETAILS 3, 12/27/2022 2:45:02 PM, amartoncik, 1:1