HomeMy WebLinkAbout008_L1.2LayoutPlan4
L1.5
4
L1.4
5
L1.4 5.
0
0
'
8.0
0
'18.00'60.00'
6.00'10.00'20.00'
5
L1.4
CF CRUSHER FINES
C PUMP TRACK CLAY
SA SHRUB AREA / CRUSHED AGGREGATE MULCH - 3" DEPTH
ECOBLOCK
EXISTING FENCING
PROPOSED FENCING
LIMITS OF DISTURBANCE
ALTERNATE BID - UPPER MOUNTAIN BIKE START HILL
EXISTING DECIDUOUS TREE
EXISTING CONIFEROUS TREE
EXISTING SHRUB
0 30
SCALE: 1" = 30'
601530
UULC FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION----LAYOUT PLANWESTLAKE PARK IMPROVEMENTSWESTLAKE PARK, BLOCK 1, WESTLAKE'S FOURTH SUBDIVISIONBOZEMAN, MONTANAL1.2 EJS18098_18_LS_LAYOUT.DWGALM08/03/211ST SP SUBMITTAL09/27/2212/27/22----2ND SP SUBMITTAL3RD SP SUBMITTAL------18098.18LAYOUT PLAN
LEGEND
LAYOUT NOTES
1.ALL SITE IMPROVEMENTS SHALL BE FIELD SURVEYED AND STAKED BY CONTRACTOR. RECEIVE OWNER’S REPRESENTATIVE APPROVAL OF STAKED
LOCATIONS OF IMPROVEMENTS PRIOR TO INSTALLATION START-UP.
2.RECEIVE OWNER’S REPRESENTATIVE APPROVAL OF FINAL STAKING BY CONTRACTOR OF ALL CONCRETE FLATWORK PRIOR TO CONSTRUCTION
AND ALL FORM WORK PRIOR TO POURING.
3.ALL DIMENSIONS SHALL BE VERIFIED BY CONTRACTOR PRIOR TO CONSTRUCTION. ANY DEVIATION FROM THESE PLANS MUST BE APPROVED BY
OWNER’S REPRESENTATIVE PRIOR TO CONSTRUCTION.
4.PRIOR TO EXCAVATION, UNDERGROUND UTILITIES SHALL BE FIELD VERIFIED.
5.NOTIFY OWNER’S REPRESENTATIVE IMMEDIATELY OF ANY DISCREPANCY BETWEEN WRITTEN COORDINATE POINTS/ELEVATIONS AND DIGITAL
INFORMATION.
6.ALL CONTROL JOINTS SHALL BE SAWCUT AND SPACED AS INDICATED ON THE DRAWINGS AND DETAILS. EXPANSION JOINTS SHALL BE PLACED AS
INDICATED ON THE DRAWINGS OR EVERY 80’.
7.LOCATION AND SIZE OF BLOCK ROCK IN PLAN IS APPROXIMATE. REFER TO SECTIONS A-E ON SHEET L2.4 FOR BLOCK ROCK ARRANGEMENT AND
C4.0 FOR GRADING.p:\18098_18_westlake_bmx_track_landscape_&_design\CADD_C3D\production_dwg\18098_18_LS_LAYOUT.dwg, LAYOUT PLAN, 12/27/2022 2:43:40 PM, amartoncik, 1:1