Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
050_E-1.0 POWER SITE PLAN
1 2 10 16 17 18 19 20 21 22 23 26 27 2829303132 24 25 33 1112 13 1415 9 8 7 5 6 4 3 METER BANK LOCATION METER BANK LOCATION METER BANK LOCATION P-1 P-3 P-4 P-5 P-7 P-AP-BP-CP-DP-E P-2 P-6 P-E.3 1 1 UTILITY XFMR #1 UTILITY XFMR #2 PRIMARY POWER FROM UTILITY POLE PRIMARY POWER FROM UTILITY POLE UTILITY XFMR #3 TO PARKING GARAGE POWER SYSTEM 1 METER BANK LOCATION PROPERTY LINE N. WALLACE AVE.E. TAMARACK ST.GENERAL ELECTRICAL NOTES: A. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT OF MATERIALS. B. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF FLOORS, WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED WORK DEPICTED IN THESE DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR ALL PATCHING OF HOLES TO THE SATISFACTION OF THE ARCHITECT/ENGINEER. © 2021 Lake|Flato Architects, Inc. 3 1 1 T H I R D S T R E E T S A N A N T O N I O, T E X A S 7 8 2 0 5 P 2 1 0. 2 2 7. 3 3 3 5 F 2 1 0. 2 2 4. 9 5 1 5 w w w . l a k e f l a t o . c o m SET ISSUE DATES DATE ISSUE PROJ. ARCHITECT DRAWN BY: L|F PROJ. NO. OWNER: NEST PARTNERS 3131 SENTINEL DRIVE BOZEMAN, MT 59715 DATE 01 SET ISSUE INFO 01 DATE 02 SET ISSUE INFO 02 DATE 03 SET ISSUE INFO 03 DATE 04 SET ISSUE INFO 04 DATE 05 SET ISSUE INFO 05 DATE 06 SET ISSUE INFO 06 DATE 07 SET ISSUE INFO 07 DATE 08 SET ISSUE INFO 08 THIS SQUARE APEARS 1/2"x1/2" ON FULL SIZE SHEETS CIVIL: TD&H ENGINEERING 234 E. BABCOCK, SUITE 3 BOZEMAN, MT 59715 LANDSCAPE: DESIGN 5 111 N. TRACY ST. BOZEMAN, MT 59715 STRUCTURAL: IMEG 108 WEST BABCOCK ST BOZEMAN, MT 59715 MEP: ENERGY1 2042 STADIUM DRIVE, SUITE 2 BOZEMAN, MT 59715 GARAGE: WALKER CONSULTANTS 10375 PARK MEADOWS DRIVE, SUITE 425 LONE TREE, CO 80124 NOT FOR CONSTRUCTION 2042 STADIUM DRIVE, BOZEMAN MT 59715 3500 CORNERSTONE - BLDG 1, JACKSON WY 83001 MONTANA OFFICE: (406) 587-2917 WYOMING OFFICE: (307) 200-2210 WWW.ENERGY-1.NET C:\Users\kjenkins\Documents\Nest Bozeman MEP Central V22_E1RevitFighter.rvt5/2/2022 4:03:02 PM POWER SITE PLAN E-1.0 SD DEVELOPMENT Issue Date 21043 AuthorAM NEST BOZEMAN 801 N. WALLACE AVENUE E-1.0 SCALE: 1/16" = 1'-0" POWER SITE PLAN1 KEYED NOTES 1 TRANSFORMER LOCATIONS TO BE COORDINATED WITH LOCAL UTILITY (NORTH WESTERN ENERGY). TRANSFORMERS MUST MAINTAIN 10FT CLEAR FROM ALL COMBUSTABLE MATERIAL AND 10-15FT CLEARANCE AT FRONT OF ENCLOSURE FOR ACCESS AND MAINTENANCE. REVISIONS NO.DATE DESCRIPTION