Loading...
HomeMy WebLinkAbout015_L500 - Landscape Details1L5003/8" = 1'-0"Typ. Deciduous Tree B&B PlantingMIN. 2 X ROOT BALL DIAM.FINISH GRADEELEVATION OF TREE FLARE TO BE 2" ABOVEFINISH GRADE ELEVATION. REMOVE EXCESSSOIL FROM ROOT BALL, AS REQUIRED, INORDER TO EXPOSE FLAREPLANTING PIT. PIT TO HAVE BROADLYSLOPING SIDES; SCARIFY SIDES OF PIT. SOILAT THE BOTTOM OF THE PIT TO BESUFFICIENTLY COMPACTED TO PREVENTSETTLEMENT. EXCAVATE PIT 2X - 5XDIAMETER OF ROOT BALL. REMOVE ALLDEBRIS AND ROCKS (LARGER THAN 3" DIAM.)FROM PIT PRIOR TO PLANTINGBACKFILL WITH MIX: 13 NATIVE BACKFILLSOIL, 13 SANDY LOAM AND 13 DEBRISFREE TOPSOILNATIVE SOILTREE STAKING, SEE SHEET L500: DETAIL 5ROOT BALL3" - 4" LAYER OF BARK MULCH. DO NOTALLOW MULCH TO COME IN CONTACTWITH TRUNK3" HIGH ROUND-TOPPED CIRCULAR RING FORWATER RETENTION. FORM RING OF SOILALONG THE PERIMETER OF THE PLANTING PIT2L5003/4" = 1'-0"Typ. Shrub Planting, Individual Planting PitMIN. 2 X ROOT BALL DIAM.FINISH GRADEELEVATION OF ROOT CROWN TO BE 1" - 2"ABOVE FINISH GRADE ELEVATION3" - 4" LAYER OF BARK MULCH. DO NOTALLOW MULCH TO COME IN CONTACTWITH SHRUB STEMSNATIVE SOILPLANTING PIT. PIT TO HAVE BROADLYSLOPING SLIDES; SCARIFY SIDES OF PIT.SOIL AT THE BOTTOM OF THE PIT TO BESUFFICIENTLY COMPACTED TO PREVENTSETTLEMENT. EXCAVATE PIT 2X - 5XDIAMETER OF ROOT BALL. REMOVE ALLDEBRIS AND ROCKS (LARGER THAN 3"DIAM.) FROM PIT PRIOR TO PLANTINGROOT BALLBACKFILL WITH MIX: 13 NATIVEBACKFILL SOIL WITH 13 SANDY LOAMAND 13 DEBRIS FREE TOPSOIL3" HIGH ROUND-TOPPED CIRCULAR RINGFOR WATER RETENTION. FORM RING OFSOIL ALONG THE PERIMETER OF THEPLANTING PIT3L5003/4" = 1'-0"Typ. Planting BedNOTE:1.REMOVE ALL DEBRIS AND STONES (LARGER THAN 3" DIAMETER)2.ALL PLANTING BEDS TO BE EXCAVATED 18" DEEP. SCARIFY SIDES AND BOTTOMTO REMOVE GLAZING. ALL BEDS TO RECEIVE NEW, AMENDED SOIL: MIX 1"COMPOST WITH MIN. 17" NEW TOPSOIL, FOR A COMBINED SETTLED DEPTH OF 18".RAKE SMOOTH TO MATCH FINAL GRADING PLANFINISH GRADE3" - 4" MULCH LAYER,MULCH TYPE PER PLAN.DO NOT ALLOW MULCHTO COME IN CONTACTWITH SHRUB STEMSTOPSOIL, SEE NOTE 2NATIVE SOILPLANT CROWN TO BEPLANTED AT ORSLIGHTLY ABOVE FINISHGRADE AT MAXIMUM OF1"-2".SHEETS L500 LANDSCAPE DETAILS NOTES:1.LANDSCAPE CONTRACTOR SHALL ASSURE PERCOLATION OFALL PLANTING PITS PRIOR TO INSTALLATION2.ALL CONTAINMENT MATERIALS AROUND ROOT BALL TO BEREMOVED PRIOR TO INSTALLATION2.1.CAREFULLY REMOVE ENTIRE WIRE BASKETS AT PLANTING2.2.CAREFULLY REMOVE ALL TREATED BURLAP (ROT-PROOF)AT PLANTING2.3.UNTREATED BURLAP MAY PARTIALLY REMAIN ON ROOTBALL. REMOVE BURLAP FROM TOP HALF OF ROOT BALLBEFORE COMPLETION OF PLANTING3.CONTAINER PLANTS: CAREFULLY CUT ANY CIRCLING ROOTS TOPREVENT PLANT FROM BECOMING ROOT BOUND4.PRUNE ALL PLANT MATERIAL PRIOR TO PLANTING, ON AN ASNEEDED BASIS. REMOVE DEAD AND / OR DAMAGED BRANCHES,LIMBS, AND LEAVES5.ALL TREES TO BE STAKED, REMOVE STAKES AFTER TWO YEARS6.ALL DECIDUOUS TREES AND SHRUBS NOT PLANTED INFOUNDATION BEDS TO BE FENCED FOR PROTECTION FROMUNGULATES AND OTHER HERBIVORES7.PROVIDE TREE GUARDS ON ALL DECIDUOUS TREES OUTSIDE OFPLANTING BEDS4L5003/4" = 1'-0"Planting Bed at Pavement Edge1"REVEAL - SEE NOTE 26" - 12" SEENOTE 345°NOTE:1.SLOPE PLANTED AREAS AWAY FROM PAVED AREAS2.FINISH GRADE AT PAVEMENT EDGE MUST BE AT A LEVEL SUCH THAT THEESTABLISHED PLANTED SURFACE WILL BE ONE (0.5-1) INCH BELOW TOP OFPAVEMENT FOR A MINIMUM DISTANCE OF SIX (6) FEET FROM THE EDGE3.BASE MATERIAL AND COMPACTED SUBGRADE TO BE EXTENDED 1X-2X THE DEPTHOF THE BASE MATERIAL BEYOND THE EDGE OF THE PAVEMENT SYSTEM. TAPERBASE MATERIAL TOWARD THE COMPACTED SUBGRADE AT A 45° ANGLE90% - 95% COMPACTED SUBGRADENATIVE SOILPAVEMENT EDGE - SEE PLANS ANDPAVING DETAILS FOR ADDITIONALINFORMATION. SEE ALSO EDGINGDETAILS AS APPLICABLEAMENDED TOPSOIL3" - 4" MULCH LAYER,MULCH TYPE PER PLANFINISH GRADE, SEE NOTE 26" DEPTH OF 34" MINUS WASHEDAGGREGATE BASE MATERIAL5L5001" = 1'-0"Natural Steel Edging -Fescue Lawn1" REVEALNOTE:1.REMOVE ALL DEBRIS AND STONES (LARGER THAN 2" DIAMETER) FROM NATIVE SOIL2.ALL LAWN AREA SURFACES TO BE LIGHTLY SCARIFIED OR LIGHTLY TILLED ANDRAKED SMOOTH. SOD AREAS TO RECEIVE NEW, AMENDED SOIL: MIX 1" COMPOSTWITH MIN. 5" NEW TOPSOIL FOR A COMBINED SETTLED DEPTH OF 6". TOPSOILSHALL BE DRUM ROLLED OR TRACK PACKED AND GRADED SMOOTHLY AND EVENLYPRIOR TO LAYING SOD. RAKE SMOOTH TO MATCH FINAL GRADING PLANFINISH GRADENATIVE SOIL316" X 4" NATURALSTEEL EDGINGTAC WELDED TO#4 REBAR DRIVENMIN. 18". REBARSPACED 24" O.C.PLANTING BED ORNATIVE SEED &SOIL, PER PLANTOPSOIL, SEE NOTE 2FINISH GRADECONCRETE SIDEWALK6" DEPTH OF 34 MINUSAGGREGATE BASEMATERIALCOMPACTEDSUBGRADE7L5003/4" = 1'-0"Ring Bike RackFRONT ELEVATION6"4"4 14"PLAN VIEWSIDE ELEVATION2'1'-8"6L5003/4" = 1'-0"Concrete BenchFINISH GRADECONCRETE SIDEWALK6" DEPTH OF 34 MINUSAGGREGATE BASEMATERIALCOMPACTEDSUBGRADEPOURED CONCRETEBENCH WITH 14" BULLNOSE EDGES1'#3 REBAR16' O.C. EACH WAYCONCRETE FOOTING#3 REBAR HORIZONTAL8L5003/4" = 1'-0"Gravel Fines DrivewayNOTES:1.NATURAL FINES SHALLCONSIST OF 80%SAND, 10% SILT, AND10% CLAY.2.A SOIL STERILANTSHALL BE APPLIED TOTHE SUBGRADE PRIORTO PLACEMENT OFGRAVEL BASE.6" DEPTH 14" CRUSHER FINES GRAVEL,COMPACTED IN 2" LIFTS, RAKE TOP LAYERTO MAKE SMOOTH8" DEPTH 34" MINUS CRUSHED GRAVELAGGREGATE BASE, COMPACTEDTO 95%, SEE NOTE #1COMPACTEDSUBGRADE TO 90%LandscapeDetailsL 500© 2021 Lake|Flato Architects, Inc.3 1 1 T H I R D S T R E E TS A N A N T O N I O, T E X A S 7 8 2 0 5P 2 1 0. 2 2 7. 3 3 3 5 F 2 1 0. 2 2 4. 9 5 1 5w w w . l a k e f l a t o . c o mSET ISSUE DATESDATEISSUEPROJ. ARCHITECTDRAWN BY:L|F PROJ. NO.OWNER: NEST PARTNERS3131 SENTINEL DRIVEBOZEMAN, MT 597155/3/2022SP1THIS SQUARE APEARS 1/2"x1/2"ON FULL SIZE SHEETSCIVIL: TD&H ENGINEERING234 E. BABCOCK, SUITE 3BOZEMAN, MT 59715LANDSCAPE: DESIGN 5111 N. TRACY ST.BOZEMAN, MT 59715STRUCTURAL: IMEG108 WEST BABCOCK STBOZEMAN, MT 59715MEP: ENERGY12042 STADIUM DRIVE, SUITE 2BOZEMAN, MT 59715GARAGE: WALKER CONSULTANTS10375 PARK MEADOWS DRIVE, SUITE 425LONE TREE, CO 80124