Loading...
HomeMy WebLinkAbout013 Appendix L - Stormwater Design Engineering ReportEngineering Report Stormwater Design South University District Phase 3 – Block 2 Updated - September 2022 Site Plan RC #1 Submittal Submitted to: City of Bozeman Engineering Department 20 East Olive Bozeman, MT 59715 Prepared by: Stahly Engineering and Associates 851 Bridger Drive, Suite 1 Bozeman, MT 59715 (406) 522-9526 Stormwater Plan 1 9/15/2022 Engineering Report Table of Contents General Information and Design Criteria Existing Site Conditions Storm Drainage Plan Description Estimation of Runoff Retention Facilities Groundwater Monitoring Groundwater Impact Analysis Storm Event Analysis Conveyance Capacity Facilities Maintenance Figures and Tables Figure 1. Vicinity Map Figure 2. Stormwater Plan Table 1. Storm Runoff Calculations Table 2 Stormwater System Capacity (sub-drainage basin 1) Table 3 Stormwater System Capacity (sub- drainage basin 2) Table 4 Stormwater System Capacity (sub- drainage basin 3) Table 5 Stormwater System Capacity (sub- drainage basin 4) Table 6 Stormwater System Capacity (sub- drainage basin 5) Table 7 Stormwater System Capacity (sub- drainage basins 6A, 7A & MDB) Table 8 Groundwater Monitoring Table 9 Groundwater Impact on System Capacity Analysis Table 10 Bozeman Rainfall Analysis (1990-2020) Table 11 Valley Drive Aisle Conveyance Calculations Table 12 Curb and Gutter Conveyance Calculations Table 13 Storm Drain Conveyance Calculations Stormwater Plan 2 9/15/2022 General Information and Design Criteria The proposed South University District Phase 3, Block 2 Development is located northeast of the intersection of South 19th Avenue and Stucky Road. This development will consist of 162 residential units on an 8.60-acre lot. With 4 different building types; two rowhouse-style apartments, motor court apartments, and flat style apartments. The intent of this project is to create 162 residential units over a variety of building types to create a diverse neighborhood in a growing part of town adjacent to the university. This application seeks feedback on the conceptual design and associated site improvements. Stormwater mitigation is achieved by using a compact, efficient stormwater management design utilizing Low Impact Design (LID) methodology to mitigate the impacts of stormwater runoff. The LID stormwater mitigation has been designed in accordance with City of Bozeman Design Standards and Specifications Policy for retention/infiltration facilities. Survivability of LID systems through conventional development is difficult. Erosion control Best Management Practices (BMP’s) will be utilized during construction to reduce the impacts of construction site runoff, until the LID systems are constructed. Plans are provided showing proposed grading, drainage flow paths, and stormwater retention/infiltration details and locations. The developer’s contact information is: Wentworth Property Company Ray Brown 802 North 3rd Avenue Phoenix, Arizona 85003 Water supply and wastewater treatment will be provided by the City of Bozeman’s municipal systems. The system owner’s contact information is: City of Bozeman Public Service Department PO Box 1230 Bozeman, MT 59771-1230 The location of the South University District Phase 3, Block 2 Development is shown on the Vicinity Map in Figure 1. Stormwater Plan 3 9/15/2022 Figure 1. Vicinity Map, Bozeman, Montana Existing Site Conditions SUD Phase 3 Block 2 is a block parcel created by the South University District Phase 3 Major Subdivision. The SUD Block 2 development site was previously used agriculturally prior to its subdivision development. The existing ground slopes north at grades between 1-3%. Existing offsite drainage is minimal, if present it would flow west to an existing irrigation ditch on the east side of 19th Avenue Right-of-Way and Mandeville Creek, east to Mandeville Creek or north to an irrigation ditch on the south side of Kagy Boulevard and either infiltrates or makes its way to Mandeville Creek. Block 2 cannot utilize Mandeville Creek as an outfall due to the topography, creek location and adjacent properties. The Block 2 Development will have its own on-site retention/infiltration facilities. A geotechnical evaluation was conducted and is provided in a separate appendix of this submittal. This site is typical of Bozeman with fine-grained soils overlying gravel deposits. Geotechnical borings have determined the depth to gravel ranges from 3.5 to 5 feet below existing grade. The underlying gravelly sandy material will provide long- term infiltration of stormwater. Groundwater monitoring was conducted in 2019 during the high groundwater season for the SUD Phase 3 subdivision development. Groundwater monitoring found groundwater depths ranged from 6.5’ to 10.0’ below existing grade in the areas of the site proposed for development. The site is not located within a 100-year floodplain. Stormwater Plan 4 9/15/2022 Storm Drainage Plan Description The storm drainage plan for the SUD Phase 3 Block 2 development consists of fifteen subsurface infiltration systems distributed evenly throughout the project site and are designed to capture and infiltrate stormwater in a manner that more closely replicates the natural hydrology of the site. The overall storm drainage plan for Block 2 is depicted on attached Figure 2. This plan shows proposed drainage basin areas, flow paths, and retention/infiltration system locations. In general, grades will be sloped away from buildings towards interior drive aisles. The sub drainage areas typically drain north via valleyed drive aisles that convey runoff to inlets and storm drains connected to subsurface retention/infiltration systems located within the drive aisles or landscape areas. Prior to infiltration into the native gravels below the systems, stormwater runoff will be treated through sediment removal in the pretreatment chambers. Where feasible, each subsurface infiltration system was sized to capture and infiltrate the design storm event to reduce the chances of overloading down gradient stormwater infrastructure. Stormwater runoff will bypass retention systems once they are full and be conveyed to the next down gradient storm system that has capacity remaining. The site will be divided into 15 sub-drainage areas as shown on attached Figure 2 and described below. Sub-drainage areas 1A through 1C are located on the west side of the site and drain north to the Main Drainage Basin (MDB) through valleyed drive Aisle “A”. Sub-areas 2A through 2C are located towards the center of the site and drain north to the main drainage basin (MDB) through valleyed drive Aisle “B”. Sub-areas 3A and 3B are located in the southeast corner of the site and drain west to the Main Drainage Basin (MDB) through valleyed drive Aisle “1”. Sub-areas 4A and 4B are in the central portion of the site and drain to the Main Drainage Basin (MDB) primarily through valleyed drive Aisle “C”. Sub-areas 5A and 5B are located in the eastern most portion of the site draining north to the Main Drainage Basin (MDB) through valleyed drive Aisle “E”, and through storm drain piping. Sub-areas 6A and 7A are smaller drainage basin areas located in the northwesterly portion of the site and drain south to the Main Drainage Basin (MDB). The MDB (on-site collector basin) is the drainage area that encompasses South 18th Avenue, Aisles 4 and 5 in addition to portions of Aisles 2 and 3 and conveys runoff via curb and gutter and or inlets to storm pipe. Sub-basin MBD drains north to a large subsurface infiltration system in the northeast corner of the site. Estimation of Runoff Runoff estimates were obtained for each sub-drainage area using City of Bozeman standards. The sites stormwater facilities have been sized to fully capture the 10-year, 2-hour storm event. The Bozeman IDF (Intensity, Duration, and Frequency) curves show a rainfall intensity of 0.41 in/hour for the 10-year, 2-hour storm, totaling a 0.82- inch storm event. Table 1 shows the storm runoff calculations for the 15 drainage sub- basins. Specifically, the design uses the volume of the 10-year, 2-hour storm for retention calculations. Stormwater Plan 5 9/15/2022 Table 1 – Storm Runoff Calculations Drainage Area Characteristics 1A 1B 1C 2A 2B Area (ft²) 16689 24294 25603 10952 24481 Area (acre) 0.38 0.56 0.59 0.25 0.56 Pervious Area (ft²) 5841 8503 8961 3833 8568 Impervious Area (ft²) 10848 15791 16642 7119 15913 Pervious ( C ) 0.2 0.2 0.2 0.2 0.2 Impervious ( C ) 0.9 0.9 0.9 0.9 0.9 Weighted ( C ) 0.66 0.66 0.66 0.66 0.66 Time of Concentration (min) 5 5 5 5 5 Runoff Volume (cf) 10yr 2hr storm 747 1087 1146 490 1096 Flowrate Q (cfs) 25yr 5min storm 0.96 1.40 1.47 0.63 1.41 Drainage Area Characteristics 2C 3A 3B 4A 4B Area (ft²) 18355 12552 21517 23059 18074 Area (acre) 0.42 0.29 0.49 0.53 0.41 Pervious Area (ft²) 6424 4393 7531 8071 6326 Impervious Area (ft²) 11931 8159 13986 14988 11748 Pervious ( C ) 0.2 0.2 0.2 0.2 0.2 Impervious ( C ) 0.9 0.9 0.9 0.9 0.9 Weighted ( C ) 0.66 0.66 0.66 0.66 0.66 Time of Concentration (min) 5 5 5 5 5 Runoff Volume (cf) 10-year 2-hr storm 822 562 963 1032 809 Flowrate Q (cfs) 25yr 5min storm 1.06 0.72 1.24 1.33 1.04 Drainage Area Characteristics 5A 5B 6A 7A MDB Area (ft²) 19308 37140 18100 12896 91590 Area (acre) 0.44 0.85 0.42 0.30 2.10 Pervious Area (ft²) 6758 12999 6335 4514 32057 Impervious Area (ft²) 12550 24141 11765 8382 59534 Pervious ( C ) 0.2 0.2 0.2 0.2 0.2 Impervious ( C ) 0.9 0.9 0.9 0.9 0.9 Weighted ( C ) 0.66 0.66 0.66 0.66 0.66 Time of Concentration (min) 5 5 5 5 5 Runoff Volume (cf) 10-year 2-hr storm 864 1662 810 577 4099 Flowrate Q (cfs) 25yr 5min storm 1.11 2.14 1.04 0.74 5.27 Stormwater Plan 6 9/15/2022 Retention Facilities The site is divided into 15 sub-drainage areas, each with its own sub-surface infiltration system designed to capture and infiltrate the design storm event. Sub-Drainage Areas Each sub-drainage area has a subsurface infiltration system designed to capture and infiltrate stormwater runoff from hardscapes, buildings, and landscaped areas. The underground infiltration systems are approximately 3.5 feet in depth starting approximately 2 feet below finished grade and extend down to the native gravel soil horizon. Storage media is comprised of a minimum of 3.5 feet of crushed gravel with a minimum of 6 inches at both the top and bottom of the system. Each retention system is hydraulicly connected to the down gradient retention system via storm piping. Outlet elevation control will be provided on each systems’ outlet pipe that allows for maximum ponding in each system before flowing into the next system. Furthermore, each system is design to allow for surfacing bypassing via valley gutters or curb and gutter drainage to be captured by a down gradient retention system. Tables 2 – 7 below show that sub-drainage areas in most cases exceed the 10-year, 2-hour storm event. Table 2 - Stormwater System Capacity (sub-drainage area 1) Basin ID 1A 1B 1C 10-year 2-hour Storm Runoff (Table 1) 747 1087 1146 Total Underground Storage (cf) 681 1451 1451 Storm Event Captured (in) 0.75 1.09 1.04 Table 3 - Stormwater System Capacity (sub-drainage areas 2) Basin ID 2A 2B 2C 10-year 2-hour Storm Runoff (Table 1) 490 1096 822 Total Underground Storage (cf) 680 1451 1449 Storm Event Captured (in) 1.14 1.09 1.45 Table 4 - Stormwater System Capacity (sub-drainage areas 3) Basin ID 3A 3B 10-year 2-hour Storm Runoff (Table 1) 562 963 Total Underground Storage (cf) 941 1418 Storm Event Captured (in) 1.37 1.21 Table 5 - Stormwater System Capacity (sub-basin 4) Basin ID 4A 4B 10-year 2-hour Storm Runoff (Table 1) 1032 809 Total Underground Storage (cf) 1285 1847 Storm Event Captured (in) 1.02 1.87 Stormwater Plan 7 9/15/2022 Table 6 - Stormwater System Capacity (sub-drainage areas 5) Basin ID 5A 5B 10-year 2-hour Storm Runoff (Table 1) 864 1662 Total Underground Storage (cf) 1269 3157 Storm Event Captured (in) 1.20 1.56 Table 7 - Stormwater System Capacity (sub-basin 6A, 7A & MDB) Basin ID 6A 7A MDB 10-year 2-hour Storm Runoff (Table 1) 810 577 4099 Total Underground Storage (cf) 763 763 9337 Storm Event Captured (in) 0.77 1.08 1.87 Groundwater Monitoring As part of the SUD Phase 3 subdivision, groundwater monitoring data was collected and is summarized in Table 8 below. Due to ongoing construction and dewatering activities associated with the subdivision, reliable groundwater monitoring has not been able to take place since the start of subdivision construction. Table 8 – Groundwater Monitoring Measurement Date Depth from Existing Ground Groundwater ELEVATION 5/3/2019 7.0 4922.10 5/6/2019 6.6 4922.50 5/13/2019 6.2 4922.90 5/22/2019 6.4 4922.70 5/29/2019 6.4 4922.70 6/5/2019 6.4 4922.70 6/12/2019 6.6 4922.46 6/24/2019 6.5 4922.63 7/12/2019 6.85 4922.25 7/17/2019 7.1 4922.00 8/26/2019 6.95 4922.15 Groundwater Impact Analysis Table 10 below shows the chamber bottom elevations for each system in relation to the extrapolated seasonally high groundwater elevation at that retention system’s location. As shown in Table 10, the separation between chamber bottom and seasonally high groundwater ranges from 1.3 feet to 3.5 feet with a site system average of 2 feet of separation. Ideally, a separation of 3 feet from seasonally high groundwater is preferred to ensure long-term survivability and performance of the retention system. The site stormwater facilities were analyzed to determine the available capacity in the system if storage capacity within 3 feet of the seasonally high groundwater elevation were eliminated. As analyzed under that scenario, the on-site stormwater management Stormwater Plan 8 9/15/2022 facilities would maintain capacity exceeding the design storm event of approximately 0.90-inch storm event, before escaping the system. Given the short-term nature of the seasonal high groundwater, it is in the interest of the site to maximize storage and maintainability of the system by installing the 2.5-foot-tall chambers as opposed to the shallower 1.5 foot tall chambers. Table 9 – Groundwater Impact on System Capacity Analysis Storm Facility ID Chamber Bottom Elevation Seasonal High GW at Chamber GW Separation FT Reduced Storage Capacity (3ft above High GW) 1A 4933.12 4930.49 2.63 597 cf (0.66” storm) 1B 4929.50 4927.50 2.00 967 cf (0.73” storm) 1C 4926.80 4924.75 2.05 961 cf (0.69” storm) 2A 4932.42 4930.49 1.93 438 cf (0.76” storm) 2B 4928.95 4927.50 1.45 701 cf (0.52” storm) 2C 4926.12 4924.75 1.37 662 cf (0.66” storm) 3A 4932.81 4930.49 2.32 728 cf (1.06” storm) 3B 4932.00 4930.49 1.51 714 cf (0.61” storm) 4A 4928.59 4927.00 1.59 681 cf (0.54” storm) 4B 4925.55 4924.25 1.30 800 cf (0.81” storm) 5A 4929.54 4927.94 2.54 677 cf (0.64” storm) 5B 4926.72 4924.25 2.47 2,599 cf (1.28” storm) 6A 4926.49 4923.00 3.49 842 cf (0.85” storm) 7A 4925.75 4923.00 2.75 700 cf (0.99” storm) MDB 4924.30 4922.25 2.05 6,380 cf (1.28” storm) TOTAL AVG 2.0 18,467 cf (0.90” storm) Storm Event Analysis A storm event analysis was previously conducted to determine the percentile storm events in the City of Bozeman. The exercise analyzed 30 years of recorded 24-hour rainfall events using precipitation data collected at MSU rain gauge Station USC00241044. The analysis excluded snow fall events and 24-hour rainfall events that accumulated less than 0.1-inches. The table below summarizes the percentile storm events produced by the analysis. As indicated by the table, the site stormwater facilities as design would completely retain the 99th percentile storm event. Table 10 – Bozeman Rainfall Analysis (1990-2020) Percentile Storm Event Volume (in) 80th 0.41 85th 0.49 90th 0.57 95th 0.74 99th 1.2 100th 2.29 Stormwater Plan 9 9/15/2022 Conveyance Capacity As designed, each retention system has the capacity to completely capture the 100- year 5-minute (0.44 inch) storm event. The distributed retention systems throughout the site reduce the likelihood of overloading any single conveyance system. Each retention system has a primary overflow and a secondary overflow. Each overflow has adequate capacity to convey the designed high intensity storm event without overloading the system. The stormwater retention systems work in tandem to reduce the compounding effects that come with a single large drainage basin. The site conveyance systems were each individually analyzed to ensure adequate capacity exists in the event there is a failure within the system (i.e., clogging). Valley Drive Aisle Stormwater runoff in most sub-drainage basins will be collected in valleyed drive aisles and conveyed to an underground retention system. The hydraulic capacity of the most limited valley drive aisle was analyzed to determine if the pavement would be overtopped in a 25-year, 5-minute storm event. The maximum 25-year event for any of the basins produces approximately 5.26 cfs of runoff, assuming infiltration systems are full and being bypassed. The capacity of the aisle at the lowest designed slope of 1.0% is 8.95 cfs at a depth of 0.25 feet (3.0 inches) above the flow line in the drive aisle. Therefore, drive aisle capacities within the development are adequate to carry in excess of the 25-year, 5-minute storm event. Table 11 – Valley Drive Aisle Conveyance Capacity Calculations Left Channel side slopes (ft:1) 50 Right Channel side slope (ft:1) 50 Channel bottom width (ft) 0 Flow Depth (ft) 0.25 Flow Area (sf) 3.125 Wetted Perimeter (ft) 25 Width (ft) 25 Hydraulic Radius (ft) 0.125 Manning's Roughness 0.013 Slope (ft/ft) 0.01 Average Velocity (ft/sec) 2.86 Flow (cfs) 8.95 Stormwater Plan 10 9/15/2022 Curb and Gutter Curb and gutter are used on the site to direct runoff into the underground storm pipe network. Curb and gutter is primarily used along S. 18th Ave and on east- west running drive aisles. To ensure the standard curb design will provide adequate conveyance capacity for peak flows, curb and gutter with the greatest flows and least amount of redundant or secondary storm conveyance options was identified and analyzed for conveyance capacity. The critical curb required to convey the maximum flow was identified as the approximately 443’ length of curb running from south to north along S. 18th Ave, serving a catchment area of approximately 45,795 sf (i.e. half of MDB Drainage Area). This catchment area produces a peak flow of 2.64 cfs for the 25-year design storm. As shown in Table 6 above, At the minimum slope of 0.5%, the curb on site has a conveyance capacity of 5.03 cfs. Table 12 – Curb and Gutter Conveyance Calculations Curb and Gutter Capacity Calcs Max Curb Conveyance Req'd (ft^3/sec) 2.63 Right-side Slope X:1 0.06 Left-side Slope X:1 33.00 Channel Bottom Width (ft) 0 Flow Depth (ft) 0.350 Flow Area (ft^2) 2.025 Wetted Perimeter (ft) 11.906 Width 0.044 Hydraulic Radius (ft) 0.170 Manning's Roughness 0.013 Slope (ft/ft) 0.005 Average Velocity (ft/sec) 2.49 Flow (ft^3/sec) 5.03 Storm Drains The hydraulic capacity of the storm drains were analyzed to determine the required pipe size to convey the 25-year, 5-minute storm event. The maximum 25-year event for any of the basins draining to a 15” storm pipe produces approximately 5.27 cfs of runoff. The capacity of a 15” storm drain at 0.6% slope is 5.33 cfs at 90% full pipe flow. Therefore, 15” storm drains have the capacity to convey the 25-year peak runoff of any onsite defined drainage areas. The maximum 25-year event for any of the basins draining to a 12” storm pipe produces approximately 2.13 cfs of runoff. The capacity of a 12” storm drain at 0.5% slope is 2.71 cfs at 90% full pipe flow. Therefore, 12” storm drains have the Stormwater Plan 11 9/15/2022 capacity to convey the 25-year peak runoff of any drainage basin from the woonerfs to the retention systems. Table 13 – Storm Drain Conveyance Calculations Manual Input Parameters Pipe Diameter (in) 12 15 Flow Depth in Pipe (in) 11.10 13.5 Coefficient of Roughness (n) 0.013 0.013 Slope (ft/ft) 0.005 0.006 Calculated Parameters Radius (in) 6 7.50 Radius (ft) 0.50 0.63 Flow Depth in Pipe (ft) 0.93 1.13 Wetted Perimeter (ft) 2.59 3.12 Area of Flow (sq ft) 0.76 1.16 Hydraulic Radius (ft) 0.29 0.37 Average Velocity (ft/sec) 3.6 4.6 Flowrate (cfs) 2.71 5.33 Facilities Maintenance The proposed stormwater mitigation systems are located within private rights-of-ways and will be operated and maintained by the owners’ association. A detailed operations and maintenance plan has been developed and included in the final covenants. At a minimum, the owners’ association is responsible for quarterly inspection and annual maintenance of all stormwater facilities. The inspection and maintenance responsibilities include, but are not limited to, general housekeeping responsibilities, visual inspection for performance, removal of sediment from mitigation facilities, vegetative maintenance, as well as any necessary repairs to the facilities themselves. STUCKY RD(48' WIDTH - 90' ROW)STATE ST(35' WIDTH - 60' ROW)STUCKY RD(48' WIDTH - 90' ROW)SOUTH 17TH AVES 19TH AVE(ROW WIDTH VARIES)S 19TH AVE(ROW WIDTH VARIES)SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SDSDSDSDSDSDSDSDSD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SOUTH 17TH AVE(47' WIDTH - 70' ROW)SDSDSDSDSD >>>>>>>>>>>>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>>>>>>1A2A1B1C2C2B3B3A4A5A4B7A6AMDB5BSD SD SD SD SD SD SD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SDSD SDSDSDSDSDSDSDSDSDSD SD SD SD SDSDSDSDSD SD SD SD SDSDSDSDSD SD SD SD SDSDSDSDSDSDSDSDSD SD SD SD SD SDSDSD SDSDCOVERED PARKING STRUCTUREAISLE "5"AISLE "4"AISLE "2"AISLE "3"AISLE "1"SOUTH 18TH AVE.AISLE "A"AISLE "B"AISLE "C"AISLE "D"AISLE "E"BLDG. - ABLDG. - BBLDG. - CBLDG. - DBLDG. - EBLDG. - FBLDG. - GBLDG. - HBLDG. - PBLDG. -OBLDG. - NBLDG. - MBLDG. - LBLDG. - KBLDG. - JBLDG. - IBLDG. - QBLDG. - RBLDG. - TBLDG. - SBLDG. - UAPARTMENTBLDG.FIG 2STORMWATERFIGURE1 3/9/2022 CONCEPT SUBMITTAL ZWL CDP 2 7/1/2022 SITE PLAN SUBMITTAL ZWL CDP 3 9/14/2022 SITE PLAN RESUBMITTAL ZWL CDP PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESSUD PH3 BLOCK 2 WENTWORTH PROPERTY COMPANY