Loading...
HomeMy WebLinkAbout011 Appendix J - Preliminary Water Engineering ReportPreliminary Engineering Report Water Main Extension South University District Phase 3 - Block 2 Updated September 2022 Submitted to: City of Bozeman Engineering Department 20 East Olive Bozeman, MT 59715 Prepared by: Stahly Engineering and Associates 851 Bridger Drive, Suite 1 Bozeman, MT 59715 (406) 522-8594 Water Mains 1 9/14/2022 Preliminary Engineering Report Contents Note: The Engineering Report format follows DEQ-1 organization. Additional information required by the City of Bozeman Design Standards is added where required. Report Narrative 1.1.1 General Information 1.1.2 Extent of water works system 1.1.3 Alternate plans 1.1.4 Site conditions 1.1.5 Water use data 1.1.6 Flow requirements 1.1.7 Sources of water supply 1.1.8 Proposed treatment processes 1.1.9 Sewage system available 1.1.10 Waste disposal 1.1.11 Automation 1.1.12 Project Sites 1.1.13 Financing 1.1.14 Future Extensions Figures and Tables Figure 1. Vicinity Map Figure 2. C2.0 - Water Plan Table 1. SUD Phase 3 Block 2 Estimated Water Design Flows Table 2. SUD Ph 3 – Block 2 Cash-in-Lieu Calculations Appendices Hydraulic Analysis Exhibit (To be provided with Infrastructure Submittal) DIPRA Analysis Water Mains 2 9/14/2022 1.1.1 General Information The proposed South University District Phase 3 Block 2 Development is located northeast of the intersection of 19th Avenue and Stucky Road. This development will consist of 162 residential units on an 8.60-acre lot. This project consists of 4 different building types, two rowhouse variations, motor court apartments, and flat style apartments. The intent of this project is to create 162 residential units over a variety of building types to create a diverse neighborhood in a growing part of town adjacent to the university. This application seeks feedback on the conceptual design and associated site improvements. The project will be served by extension of City of Bozeman water and sewer mains throughout the project. Individual service lines will be provided to each block of units. City of Bozeman water and sewer mains currently exist along all four sides of the project site. The developer’s contact information is: Wentworth Property Company Ray Brown 802 North 3rd Avenue Phoenix, Arizona 85003 Water supply and wastewater treatment will be provided by the City of Bozeman’s municipal systems. The system owner’s contact information is: City of Bozeman Public Service Department PO Box 1230 Bozeman, MT 59771-1230 The location of the SUD Phase 3 Block 2 development is shown on the Vicinity Map in Figure 1. Water Mains 3 9/14/2022 Figure 1. Vicinity Map, Bozeman, Montana 1.1.2 Extent of Water Works System Water supply to the area is from an existing 8” diameter water main in S 17th Ave, an existing 8” main in State Street, an existing 12” main in Stucky Road and an existing 24” diameter water main in South 19th Avenue. New water mains will be in combined 30-foot wide water and sewer easements. New on-site 8” water mains will be looped. Each structure will have a single water service from the main to the riser room, with a curb stop located on the easement or right-of-way line. Preliminary service sizing indicates a range of 1 ½” to 4” services. The Block 2 water main extensions have been designed in accordance with Montana Department of Environmental Quality Circular 1, and the City of Bozeman Design Standards and Specifications Policy. Construction specifications will be Montana Public Works Standards and Specifications (MPWSS), and the City of Bozeman Modifications to MPWSS. 1.1.3 Alternate Plans Due to the project’s location within the City of Bozeman, extension of public mains was the only water supply alternative. Distribution alternatives were explored, and the proposed design was selected to increase looping and minimize dead ends. The use of an on-site well as a Water Mains 4 9/14/2022 source for irrigation usage is not feasible due to the previously allocated water rights in the Phase 2 subdivision park. because of the lack of water rights available for the lot. 1.1.4. Site Conditions The SUD Phase 3 Block 2 site is typical of Bozeman with fine-grained soils overlying gravel deposits. Geotechnical borings have determined the depth to gravel ranges from 3.5 to 5 feet. Estimated depth to groundwater obtained from the geotechnical borings is 9 to 12 feet. If mains are installed during periods of high groundwater, dewatering may be required. High groundwater and soil conditions in the area indicate potential for corrosion of ductile iron pipe. Composite soil samples were collected at typical depths of water main to test for corrosive soil conditions and found to be at low risk of corrosion. The full DIPRA Decision Model results and summary are included as an appendix of this report. 1.1.5. Water Use Data Domestic and site irrigation water will be provided by the City of Bozeman Municipal system. This project is located within the planned service area of the City’s system. Estimated water use for SUD PH3 Block 2 has been determined utilizing values provided in City design standards and Facility Plans and is shown below in Table 1. For water main sizing, typical City design flows are utilized. Table 1: SUD Phase 3 Block 2 Estimated Water Design Flows Site Area (acres)8.6 Residential Units 162 Residential Occupants (2.11/unit)341.82 Per Capita Use (gpd)89 Residential Flow (gpd)30,422 Commercial Area (sf)0 Commercial Use (gpd/1000 sf)0 Commercial Flow (gpd)0 Commercial and Residential Flows (gpd)30,422 Commercial and Residential Flows (gpm)21 Average Day Water Use [Equal to Commercial & Residential Flows](gpd) 30,422 Irrigation (annual use in gal)1,401,370 Irrigation [based on annual use in a 120 day watering season] (gpd) 11,678 Max Day Water Use [Average Day Use + Irrigation] (gpd)42,100 Peaking Factor (PF)4.05 Design Water Peak Hour Flow 118.51 Water Mains 5 9/14/2022 The estimation of the domestic water demand for the project is based on proposed use and planned density, utilizing standard City of Bozeman design values for most calculations. Because the proposed development is multifamily or mixed use, the domestic water use, and irrigation are calculated separately. The domestic water use is assumed to be the same as the wastewater generation at 89 gpd per capita. Site irrigation use was calculated by the Landscape Architect as shown in the landscaping plans. Water rights are provided by payment of cash-in-lieu of water rights, at the time of lot development as determined during site plan review. The following Table 2 summarizes the estimated Cash-in-Lieu amount for water rights. Table 2: SUD Ph 3 – Block 2 Cash-in-Lieu Calculations The preliminary estimate for Cash-in-lieu of water rights is estimated at 24.39 acre-feet or $146,340.00. Final cash-in-lieu of water rights calculations will be established with the final infrastructure plans. 1.1.6. Flow Requirements As stated previously, the peak hour water demand is estimated to be 118.51 gallons per min (gpm). Fire flows have not been determined yet but will be in accordance with the City of Bozeman adopted Uniform Fire Code. It is anticipated that a fire flow of 1500 gpm will be required. The fire flow requirement will be the dominant design constraint for system design. As part of the Phase 3 Subdivision process, a hydraulic analysis was completed to determine the available fire flow in this area. According to this analysis, Phase 3 hydrants – including those in Block 2 – will have fire flows ranging from 3,122 gpm to 3,606 gpm, with a system residual pressure of 20 psi. Fire flow requirements are based on the Uniform Fire Code. The required hydrant flow is determined using Table H.5.1 of the Uniform Fire Code. For example, a 48,000 sq ft Type V-A building requires a fire flow of 4,000 gpm. In consideration of the planned use of sprinkler systems in future Phase 3 site developments projects, the fire department is allowing a 75% reduction in required fire flows, reducing the hydrant flow down to the anticipated minimum required fire flow of 1500 gpm. The fire flow required will be determined by the fire department at the time of infrastructure design. The total fire flow available will allow for the use of the hydrant and the sprinkler while maintaining the required 20 psi residual pressure. The Phase 3 Subdivision Engineer’s report is available upon request. Dwelling Units Average Daily Use Per Unit (acr feet/unit) Total Annual Multi- Family Water Use (acre-feet) Total Annual Water Required for Irrigation (acre-feet) Total Annual Water Required (acre feet) Unit Price per acre-foot Cash-in-Lieu Water Rights 162 0.124 20.09 4.30 24.39 6,000.00$ 146,340.00$ Water Mains 6 9/14/2022 1.1.7. Sources of Water Supply This section is not applicable. 1.1.8. Proposed Treatment Process This section is not applicable. 1.1.9 Sewage System Available Sewer service is provided by new City mains extended through the site from the existing sewer main running along the northern portion of the property. Sewers will be approximately 8.5 feet deep and primarily cross below water mains and services. 1.1.10 Waste Disposal This section is not applicable. 1.1.11 Automation This section is not applicable. 1.1.12 Project Sites This section is not applicable. 1.1.13 Financing This section is not applicable. 1.1.14 Future Extensions The water system layout accommodates future water main extensions as required to complete future system improvements in this area. J-700J-701J-702H-700J-703H-701J-704J-705H-702J-706J-709H-706J-710H-707J-711J-712H-708P-700P-701P-702P-703P-705P-707P-708P-715P-716P-718P-719P-720P-721J-23J-26J-24H-712J-25H-17P-29 P-724P-725P-32P-34P-727H-714P-728P-35 P-828P-816J-714P-733J-716P-739P-738J2000P2000 J2001P-706(1)P-706(2)P2001J2002P2002J2003P-31(1)P-31(2)P2003J2004P2004J2005P2005 J2007P-735(1)P-735(2)J2008P2008P2010 H2001HL2001J2006P2006P2007J2009P-30(1)P-30(2)P2009J2011P-717(1)P-717(2)P2011 H2002HL2002FIRE FLOW AVAILABLEHYDRANT IDFLOW (GPM)H20013,185H2002NOTE: FIRE FLOW CRITERIA IS MINIMUMOF 20 PSI IN SYSTEM. THIS CONDITION ISSTILL SATISFIED AT 3,500 GPM AT ALLPROPOSED HYDRANTS.3,115NEW HYDRANT (H2001)NEW HYDRANT (H2002)CONNECTION TOEX. SYSTEMCONNECTION TOEX. SYSTEMCONNECTION TOEX. SYSTEMCONNECTION TOEX. SYSTEMCONNECTION TOEX. SYSTEMCONNECTION TOEX. SYSTEMCONNECTION TOEX. SYSTEMNEW 8" WATER LINENEW 8" WATER LINENEW 8" WATER LINETOWN SUPPLY MODELEDAS RESERVOIR ANDCALIBRATED TO FIELDMEASUREMENTS. .NEW MAX DAY DEMAND FOR PROP.CONSTRUCTION MODELED AT 120GPM (60 GPM EACH, PLACED ATNODES (J2000 AND J2005)W W SOUTH 18TH AVE0050'100'FIG.1WATERCADEXHIBIT1 3/9/2022 CONCEPT SUBMITTAL ZWL CDP 2 7/1/2022 SITE PLAN SUBMITTAL ZWL CDP PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESSUD PH3 BLOCK 2 WENTWORTH PROPERTY COMPANY Fire Flow Node FlexTable: Fire Flow Report Junction w/ Minimum Pressure (Zone) Pressure (Calculated System Lower Limit) (psi) Junction w/ Minimum Pressure (System) Pressure (Calculated Residual) (psi) Fire Flow (Available) (gpm) Label J-836.7J-820.03,185H2001 J-837.6J-820.03,115H2002 Page 1 of 127 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 9/14/2022 WaterCAD [10.03.02.75] Bentley Systems, Inc. Haestad Methods Solution CenterSUD PHASE 3 WATERCAD.wtg FlexTable: Junction Table Pressure (psi) Hydraulic Grade (ft) Demand (gpm) Elevation (ft) Is Active?Label 58.85,106.9104,971.00TrueH-1 57.45,108.6304,976.00TrueH-2 60.55,104.8904,965.00TrueH-3 73.25,102.0804,933.00TrueH-10 75.35,102.0304,928.00TrueH-12 71.95,102.1204,936.00TrueH-15 64.85,101.7204,952.00TrueH-16 75.25,101.7204,928.00TrueH-17 79.55,101.7204,918.00TrueH-18 80.45,101.7504,916.00TrueH-19 62.25,103.7104,960.00TrueH-20 68.95,102.1904,943.00TrueH-102 66.35,102.2904,949.00TrueH-104 69.35,102.2504,942.00TrueH-107 71.05,102.1504,938.00TrueH-202 69.35,102.1904,942.00TrueH-206 69.75,102.1704,941.00TrueH-210 71.05,102.1404,938.00TrueH-214 67.65,102.2404,946.00TrueH-302 68.95,102.1804,943.00TrueH-304 71.05,102.1504,938.00TrueH-308 71.05,102.1504,938.00TrueH-311 69.35,102.1504,942.00TrueH-317 71.55,102.1504,937.00TrueH-319 64.35,102.5404,954.00TrueH-502 63.65,102.8904,956.00TrueH-504 64.35,102.6804,954.00TrueH-507 63.05,102.5304,957.00TrueH-510 64.75,102.4604,953.00TrueH-513 66.85,102.3504,948.00TrueH-516 68.95,102.2204,943.00TrueH-518 68.95,102.2904,943.00TrueH-602 66.85,102.4104,948.00TrueH-606 67.65,102.2604,946.00TrueH-609 65.15,102.3704,952.00TrueH-613 70.05,101.7404,940.00TrueH-700 72.65,101.7404,934.00TrueH-701 74.75,101.7304,929.00TrueH-702 77.35,101.7404,923.00TrueH-704 79.55,101.7604,918.00TrueH-705 70.05,101.7504,940.00TrueH-706 70.85,101.7204,938.00TrueH-707 71.35,101.7204,937.00TrueH-708 66.55,101.7204,948.00TrueH-709 68.75,101.7204,943.00TrueH-710 79.95,101.7404,917.00TrueH-711 73.45,101.7204,932.00TrueH-712 77.85,101.7204,922.00TrueH-713 75.65,101.7204,927.00TrueH-714 Page 1 of 427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 9/14/2022 WaterCAD [10.03.02.75] Bentley Systems, Inc. Haestad Methods Solution CenterSUD PHASE 3 WATERCAD.wtg FlexTable: Junction Table Pressure (psi) Hydraulic Grade (ft) Demand (gpm) Elevation (ft) Is Active?Label 73.85,101.7204,931.04TrueH2001 71.85,101.7204,935.68TrueH2002 77.95,101.9804,922.00TrueJ-1 60.25,104.0704,965.00TrueJ-2 75.35,102.021004,928.00TrueJ-3 76.65,102.00254,925.00TrueJ-4 73.65,102.0404,932.00TrueJ-5 75.35,102.0304,928.00TrueJ-6 74.05,102.03254,931.00TrueJ-7 61.75,101.7204,959.00TrueJ-8 73.25,102.0804,933.00TrueJ-9 60.55,104.8904,965.00TrueJ-10 75.35,102.0304,928.00TrueJ-11 57.45,108.6304,976.00TrueJ-12 58.85,106.9104,971.00TrueJ-13 71.95,102.1204,936.00TrueJ-14 71.45,102.1304,937.00TrueJ-16 68.95,102.2004,943.00TrueJ-17 65.95,102.3004,950.00TrueJ-18 64.35,102.55404,954.00TrueJ-19 64.85,101.7204,952.00TrueJ-20 66.55,101.7204,948.00TrueJ-21 68.75,101.7204,943.00TrueJ-22 71.75,101.7204,936.00TrueJ-23 73.45,101.7204,932.00TrueJ-24 75.65,101.7204,927.00TrueJ-25 75.65,101.7204,927.00TrueJ-26 77.85,101.7204,922.00TrueJ-27 79.55,101.7204,918.00TrueJ-28 79.95,101.722004,917.00TrueJ-29 79.95,101.7404,917.00TrueJ-30 80.45,101.7504,916.00TrueJ-31 79.95,101.7704,917.00TrueJ-32 62.25,103.7104,960.00TrueJ-33 62.55,103.3704,959.00TrueJ-34 72.75,102.0904,934.00TrueJ-100 68.95,102.1904,943.00TrueJ-101 66.35,102.2904,949.00TrueJ-103 69.35,102.2604,942.00TrueJ-105 69.35,102.2504,942.00TrueJ-106 71.95,102.1304,936.00TrueJ-200 71.05,102.15194,938.00TrueJ-201 69.75,102.1904,941.00TrueJ-203 69.35,102.19194,942.00TrueJ-205 70.25,102.2004,940.00TrueJ-207 69.75,102.17194,941.00TrueJ-209 68.95,102.1604,943.00TrueJ-211 70.65,102.1504,939.00TrueJ-212 71.05,102.14194,938.00TrueJ-213 Page 2 of 427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 9/14/2022 WaterCAD [10.03.02.75] Bentley Systems, Inc. Haestad Methods Solution CenterSUD PHASE 3 WATERCAD.wtg FlexTable: Junction Table Pressure (psi) Hydraulic Grade (ft) Demand (gpm) Elevation (ft) Is Active?Label 67.65,102.2404,946.00TrueJ-300 67.65,102.2404,946.00TrueJ-301 68.95,102.1804,943.00TrueJ-303 69.35,102.1604,942.00TrueJ-305 71.05,102.1504,938.00TrueJ-306 71.05,102.1504,938.00TrueJ-307 71.55,102.1504,937.00TrueJ-309 71.05,102.15154,938.00TrueJ-310 71.05,102.1504,938.00TrueJ-312 70.25,102.1504,940.00TrueJ-313 69.35,102.1504,942.00TrueJ-315 69.35,102.15154,942.00TrueJ-316 63.65,102.9104,956.00TrueJ-500 64.35,102.5404,954.00TrueJ-501 63.65,102.8904,956.00TrueJ-503 64.35,102.6904,954.00TrueJ-505 64.35,102.6804,954.00TrueJ-506 63.05,102.5304,957.00TrueJ-508 63.05,102.5304,957.00TrueJ-509 64.75,102.4604,953.00TrueJ-511 64.75,102.4604,953.00TrueJ-512 66.85,102.3604,948.00TrueJ-514 66.85,102.3504,948.00TrueJ-515 68.95,102.2204,943.00TrueJ-517 66.85,102.42884,948.00TrueJ-600 68.95,102.2904,943.00TrueJ-601 66.85,102.4104,948.00TrueJ-605 65.15,102.37884,952.00TrueJ-607 67.65,102.2604,946.00TrueJ-608 65.15,102.3704,952.00TrueJ-612 71.35,101.82524,937.00TrueJ-700 69.65,101.7704,941.00TrueJ-701 70.05,101.7404,940.00TrueJ-702 72.65,101.7404,934.00TrueJ-703 75.25,101.7304,928.00TrueJ-704 74.75,101.7304,929.00TrueJ-705 75.65,101.7204,927.00TrueJ-706 77.85,101.7404,922.00TrueJ-707 79.55,101.7604,918.00TrueJ-708 70.05,101.7504,940.00TrueJ-709 70.85,101.7304,938.00TrueJ-710 70.85,101.7204,938.00TrueJ-711 71.35,101.7204,937.00TrueJ-712 79.95,101.7404,917.00TrueJ-713 72.65,101.7404,934.00TrueJ-714 77.85,101.7404,922.00TrueJ-715 75.65,101.7204,927.00TrueJ-716 59.55,102.4504,965.00TrueJ-801 63.55,101.7704,955.00TrueJ-802 Page 3 of 427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 9/14/2022 WaterCAD [10.03.02.75] Bentley Systems, Inc. Haestad Methods Solution CenterSUD PHASE 3 WATERCAD.wtg FlexTable: Junction Table Pressure (psi) Hydraulic Grade (ft) Demand (gpm) Elevation (ft) Is Active?Label 60.85,102.60554,962.00TrueJ-803 61.05,102.88554,962.00TrueJ-804 58.05,103.0204,969.00TrueJ-805 58.75,102.6404,967.00TrueJ-806 62.05,102.47524,959.12TrueJ-807 62.65,101.701004,957.00TrueJ-808 65.25,101.69574,951.00TrueJ-809 66.95,101.69574,947.00TrueJ-810 69.15,101.70574,942.00TrueJ-811 69.15,101.70524,942.00TrueJ-812 66.95,101.69524,947.00TrueJ-813 65.25,101.69524,951.00TrueJ-814 77.85,101.72774,922.00TrueJ-816 74.75,101.72604,929.16TrueJ2000 74.25,101.7304,930.25TrueJ2001 74.15,101.7204,930.34TrueJ2002 74.75,101.7204,929.16TrueJ2003 73.85,101.7204,931.04TrueJ2004 72.15,101.72604,935.18TrueJ2005 71.85,101.7404,935.74TrueJ2006 71.45,101.7404,936.75TrueJ2007 71.85,101.7304,935.84TrueJ2008 72.75,101.7204,933.74TrueJ2009 70.35,101.7404,939.26TrueJ2011 Page 4 of 427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 9/14/2022 WaterCAD [10.03.02.75] Bentley Systems, Inc. Haestad Methods Solution CenterSUD PHASE 3 WATERCAD.wtg FlexTable: Pipe Table Is Active?Length (User Defined) (ft) Length (Scaled) (ft) Velocity (ft/s) Flow (gpm) Minor Loss Coefficient (Local) Hazen- Williams C MaterialDiameter (in) Stop NodeStart NodeLabel True0110.0002.700130.0Ductile Iron6.00H2001J2004HL2001 True0140.0002.700130.0Ductile Iron6.00H2002J2005HL2002 True2,000721.071,5080.000130.0Ductile Iron24.00J-12R-1P-1 True06820.33-550.000130.0Ductile Iron8.32J-3J-1P-3 True02470.49-1860.000130.0Ductile Iron12.39J-4J-1P-4 True02560.41-1550.000130.0Ductile Iron12.39J-5J-3P-5 True03360.431630.000130.0Ductile Iron12.39J-4J-6P-6 True06020.28-480.000130.0Ductile Iron8.32J-7J-4P-7 True03040.19320.000130.0Ductile Iron8.32J-6J-7P-8 True01910.62-1050.000130.0Ductile Iron8.32J-9J-7P-9 True0130.0002.700130.0Ductile Iron6.21H-10J-9P-10 True0370.351310.000130.0Ductile Iron12.39J-6J-11P-11 True0370.0002.700130.0Ductile Iron6.21H-12J-11P-12 True03100.351310.000130.0Ductile Iron12.39J-11J-5P-13 True03600.76-2860.000130.0Ductile Iron12.39J-14J-5P-14 True0250.0002.700130.0Ductile Iron6.21H-15J-14P-15 True0430.76-2860.000130.0Ductile Iron12.39J-16J-14P-16 True03230.76-2860.000130.0Ductile Iron12.39J-17J-16P-17 True03330.92-3470.000130.0Ductile Iron12.39J-18J-17P-18 True04031.36-5090.000130.0Ductile Iron12.39J-19J-18P-19 True0220.0002.700130.0Ductile Iron6.21J-10H-3P-20 True0160.0002.700130.0Ductile Iron6.21H-20J-33P-21 True01392.941,1040.000130.0Ductile Iron12.39J-33J-2P-22 True0160.0002.700130.0Ductile Iron6.21H-2J-12P-23 True03714.01-1,5080.000130.0Ductile Iron12.39J-12J-13P-24 True03620.03-480.000130.0Ductile Iron24.85J-20J-8P-25 True080.0002.700130.0Ductile Iron6.21H-16J-20P-26 True02990.03-480.000130.0Ductile Iron24.85J-21J-20P-27 True03010.03-480.000130.0Ductile Iron24.85J-22J-21P-28 True03670.03-480.000130.0Ductile Iron24.85J-23J-22P-29 True01700.02280.000130.0Ductile Iron24.85J2009J-23P-30(1) True01310.03450.000130.0Ductile Iron24.85J-24J2009P-30(2) Page 1 of 727 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 9/14/2022 WaterCAD [10.03.02.75]Bentley Systems, Inc. Haestad Methods Solution CenterSUD PHASE 3 WATERCAD.wtg FlexTable: Pipe Table Is Active?Length (User Defined) (ft) Length (Scaled) (ft) Velocity (ft/s) Flow (gpm) Minor Loss Coefficient (Local) Hazen- Williams C MaterialDiameter (in) Stop NodeStart NodeLabel True01810.03450.000130.0Ductile Iron24.85J2003J-24P-31(1) True01380.04530.000130.0Ductile Iron24.85J-25J2003P-31(2) True090.0002.700130.0Ductile Iron6.21H-17J-25P-32 True0220.0002.700130.0Ductile Iron6.21H-1J-13P-33 True0350.04530.000130.0Ductile Iron24.85J-26J-25P-34 True02670.05690.000130.0Ductile Iron24.85J-27J-26P-35 True02830.05690.000130.0Ductile Iron24.85J-28J-27P-36 True0910.05690.000130.0Ductile Iron24.85J-29J-28P-37 True0280.0002.700130.0Ductile Iron6.21H-18J-28P-38 True03660.35-1310.000130.0Ductile Iron12.39J-30J-29P-39 True01630.47-1760.000130.0Ductile Iron12.39J-31J-30P-40 True01820.47-1760.000130.0Ductile Iron12.39J-32J-31P-41 True0120.0002.700130.0Ductile Iron6.21H-19J-31P-42 True01292.941,1040.000130.0Ductile Iron12.39J-34J-33P-43 True02952.228360.000130.0Ductile Iron12.39J-500J-34P-44 True01,3220.642410.000130.0Ductile Iron12.39J-32J-1P-45 True04344.01-1,5080.000130.0Ductile Iron12.39J-13J-10P-46 True01774.011,5080.000130.0Ductile Iron12.39J-2J-10P-47 True0670.62-1050.000130.0Ductile Iron8.32J-100J-9P-100 True0630.36600.000130.0Ductile Iron8.32J-101J-17P-101 True0140.0002.700130.0Ductile Iron6.21H-102J-101P-102 True0630.43-1630.000130.0Ductile Iron12.39J-18J-103P-103 True0160.0002.700130.0Ductile Iron6.21H-104J-103P-104 True04240.43-1630.000130.0Ductile Iron12.39J-103J-105P-105 True0390.77-1300.000130.0Ductile Iron8.32J-105J-106P-106 True0110.0002.700130.0Ductile Iron6.21H-107J-106P-107 True01560.62-1050.000130.0Ductile Iron8.32J-200J-100P-200 True02130.37-630.000130.0Ductile Iron8.32J-201J-200P-201 True0140.0002.700130.0Ductile Iron6.21H-202J-201P-202 True02480.48820.000130.0Ductile Iron8.32J-201J-203P-203 True0880.36600.000130.0Ductile Iron8.32J-203J-101P-204 True02680.13210.000130.0Ductile Iron8.32J-203J-205P-205 Page 2 of 727 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 9/14/2022 WaterCAD [10.03.02.75]Bentley Systems, Inc. Haestad Methods Solution CenterSUD PHASE 3 WATERCAD.wtg FlexTable: Pipe Table Is Active?Length (User Defined) (ft) Length (Scaled) (ft) Velocity (ft/s) Flow (gpm) Minor Loss Coefficient (Local) Hazen- Williams C MaterialDiameter (in) Stop NodeStart NodeLabel True0140.0002.700130.0Ductile Iron6.21H-206J-205P-206 True02130.24400.000130.0Ductile Iron8.32J-205J-207P-207 True01510.77-1300.000130.0Ductile Iron8.32J-106J-207P-208 True01460.53-910.000130.0Ductile Iron8.32J-207J-209P-209 True0140.0002.700130.0Ductile Iron6.21H-210J-209P-210 True01210.43-720.000130.0Ductile Iron8.32J-209J-211P-211 True02640.25-420.000130.0Ductile Iron8.32J-211J-212P-212 True01210.36-600.000130.0Ductile Iron8.32J-212J-213P-213 True0140.0002.700130.0Ductile Iron6.21H-214J-213P-214 True01460.25-420.000130.0Ductile Iron8.32J-213J-200P-215 True02780.451700.000130.0Ductile Iron12.39J-300J-105P-300 True0390.0000.000130.0Ductile Iron8.32J-301J-300P-301 True0110.0002.700130.0Ductile Iron6.21H-302J-301P-302 True02740.782940.000130.0Ductile Iron12.39J-303J-300P-303 True070.0002.700130.0Ductile Iron6.21H-304J-303P-304 True0970.782940.000130.0Ductile Iron12.39J-305J-303P-305 True03270.11180.000130.0Ductile Iron8.32J-306J-305P-306 True0460.11180.000130.0Ductile Iron8.32J-307J-306P-307 True0110.0002.700130.0Ductile Iron6.21H-308J-307P-308 True01560.0000.000130.0Ductile Iron8.32J-309J-212P-309 True01720.11-190.000130.0Ductile Iron8.32J-310J-212P-310 True0120.0002.700130.0Ductile Iron6.21H-311J-310P-311 True0210.20-340.000130.0Ductile Iron8.32J-312J-310P-312 True01260.20-340.000130.0Ductile Iron8.32J-313J-312P-313 True01430.11180.000130.0Ductile Iron8.32J-313J-307P-314 True01370.09-160.000130.0Ductile Iron8.32J-315J-313P-315 True0210.09-160.000130.0Ductile Iron8.32J-316J-315P-316 True0110.0002.700130.0Ductile Iron6.21H-317J-316P-317 True01710.18-310.000130.0Ductile Iron8.32J-211J-316P-318 True0110.0002.700130.0Ductile Iron6.21H-319J-309P-319 True03561.776640.000130.0Ductile Iron12.39J-19J-500P-500 True0480.68-1140.000130.0Ductile Iron8.32J-19J-501P-501 Page 3 of 727 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 9/14/2022 WaterCAD [10.03.02.75]Bentley Systems, Inc. Haestad Methods Solution CenterSUD PHASE 3 WATERCAD.wtg FlexTable: Pipe Table Is Active?Length (User Defined) (ft) Length (Scaled) (ft) Velocity (ft/s) Flow (gpm) Minor Loss Coefficient (Local) Hazen- Williams C MaterialDiameter (in) Stop NodeStart NodeLabel True0160.0002.700130.0Ductile Iron6.21H-502J-501P-502 True0431.01-1720.000130.0Ductile Iron8.32J-500J-503P-503 True060.0002.700130.0Ductile Iron6.21H-504J-503P-504 True03331.01-1720.000130.0Ductile Iron8.32J-503J-505P-505 True0320.88-1480.000130.0Ductile Iron8.32J-505J-506P-506 True060.0002.700130.0Ductile Iron6.21H-507J-506P-507 True03320.88-1480.000130.0Ductile Iron8.32J-506J-508P-508 True0320.55-930.000130.0Ductile Iron8.32J-508J-509P-509 True060.0002.700130.0Ductile Iron6.21H-510J-509P-510 True03470.55-930.000130.0Ductile Iron8.32J-509J-511P-511 True070.72-1220.000130.0Ductile Iron8.32J-511J-512P-512 True080.0002.700130.0Ductile Iron6.21H-513J-512P-513 True03350.72-1220.000130.0Ductile Iron8.32J-512J-514P-514 True0120.93-1570.000130.0Ductile Iron8.32J-514J-515P-515 True080.0002.700130.0Ductile Iron6.21H-516J-515P-516 True02650.93-1570.000130.0Ductile Iron8.32J-515J-517P-517 True0100.0002.700130.0Ductile Iron6.21H-518J-517P-518 True01320.93-1570.000130.0Ductile Iron8.32J-517J-305P-519 True04330.68-1140.000130.0Ductile Iron8.32J-501J-600P-600 True0610.81-1370.000130.0Ductile Iron8.32J-601J-105P-601 True0110.0002.700130.0Ductile Iron6.21H-602J-601P-602 True03470.81-1370.000130.0Ductile Iron8.32J-600J-601P-603 True03521.19-2020.000130.0Ductile Iron8.32J-505J-600P-604 True0230.54-910.000130.0Ductile Iron8.32J-600J-605P-605 True0120.0002.700130.0Ductile Iron6.21H-606J-605P-606 True02600.54-910.000130.0Ductile Iron8.32J-605J-607P-607 True0610.73-1240.000130.0Ductile Iron8.32J-608J-300P-608 True0110.0002.700130.0Ductile Iron6.21H-609J-608P-609 True03470.73-1240.000130.0Ductile Iron8.32J-607J-608P-610 True03420.92-1560.000130.0Ductile Iron8.32J-508J-607P-611 True0230.21-350.000130.0Ductile Iron8.32J-607J-612P-612 True0120.0002.700130.0Ductile Iron6.21H-613J-612P-613 Page 4 of 727 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 9/14/2022 WaterCAD [10.03.02.75]Bentley Systems, Inc. Haestad Methods Solution CenterSUD PHASE 3 WATERCAD.wtg FlexTable: Pipe Table Is Active?Length (User Defined) (ft) Length (Scaled) (ft) Velocity (ft/s) Flow (gpm) Minor Loss Coefficient (Local) Hazen- Williams C MaterialDiameter (in) Stop NodeStart NodeLabel True03550.21-350.000130.0Ductile Iron8.32J-612J-514P-614 True07291.154320.000130.0Ductile Iron12.39J-700J-305P-700 True01571.013800.000130.0Ductile Iron12.39J-701J-700P-701 True01100.621050.000130.0Ductile Iron8.32J-702J-701P-702 True0150.0002.700130.0Ductile Iron6.21H-700J-702P-703 True0150.0002.700130.0Ductile Iron6.21H-701J-703P-705 True01920.22370.000130.0Ductile Iron8.32J2001J-703P-706(1) True01150.0240.000130.0Ductile Iron8.32J-704J2001P-706(2) True0270.18300.000130.0Ductile Iron8.32J-705J-704P-707 True060.0002.700130.0Ductile Iron6.21H-702J-705P-708 True0150.0002.700130.0Ductile Iron6.21H-704J-707P-712 True02620.39-660.000130.0Ductile Iron8.32J-708J-707P-713 True0130.0002.700130.0Ductile Iron6.21H-705J-708P-714 True0860.552070.000130.0Ductile Iron12.39J-709J-701P-715 True0120.0002.700130.0Ductile Iron6.21H-706J-709P-716 True0960.552070.000130.0Ductile Iron12.39J2011J-709P-717(1) True01660.471780.000130.0Ductile Iron12.39J-710J2011P-717(2) True0380.43720.000130.0Ductile Iron8.32J-711J-710P-718 True0180.0002.700130.0Ductile Iron6.21H-707J-711P-719 True03160.20760.000130.0Ductile Iron12.39J-712J-710P-720 True0160.0002.700130.0Ductile Iron6.21H-708J-712P-721 True0100.0002.700130.0Ductile Iron6.21H-709J-21P-722 True0100.0002.700130.0Ductile Iron6.21H-710J-22P-723 True0330.20-760.000130.0Ductile Iron12.39J-712J-23P-724 True0100.0002.700130.0Ductile Iron6.21H-712J-24P-725 True03300.09-150.000130.0Ductile Iron8.32J-706J-26P-727 True090.0002.700130.0Ductile Iron6.21H-714J-706P-728 True080.0002.700130.0Ductile Iron6.21H-713J-27P-729 True0240.26440.000130.0Ductile Iron8.32J-713J-30P-730 True070.0002.700130.0Ductile Iron6.21H-711J-713P-731 True0570.39660.000130.0Ductile Iron8.32J-708J-32P-732 True0130.22370.000130.0Ductile Iron8.32J-703J-714P-733 Page 5 of 727 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 9/14/2022 WaterCAD [10.03.02.75]Bentley Systems, Inc. Haestad Methods Solution CenterSUD PHASE 3 WATERCAD.wtg FlexTable: Pipe Table Is Active?Length (User Defined) (ft) Length (Scaled) (ft) Velocity (ft/s) Flow (gpm) Minor Loss Coefficient (Local) Hazen- Williams C MaterialDiameter (in) Stop NodeStart NodeLabel True02040.40680.000130.0Ductile Iron8.32J2007J-701P-735(1) True01320.22370.000130.0Ductile Iron8.32J-714J2007P-735(2) True03060.15-260.000130.0Ductile Iron8.32J-715J-704P-736 True0140.39-660.000130.0Ductile Iron8.32J-707J-715P-737 True0100.09150.000130.0Ductile Iron8.32J-706J-716P-738 True03270.18300.000130.0Ductile Iron8.32J-716J-705P-739 True02800.28-470.000130.0Ductile Iron8.32J-807J-801P-800 True02920.17290.000130.0Ductile Iron8.32J-511J-807P-801 True08741.192020.000130.0Ductile Iron8.32J-802J-801P-802 True03732.384040.000130.0Ductile Iron8.32J-805J-2P-805 True03631.412380.000130.0Ductile Iron8.32J-806J-805P-806 True03810.921560.000130.0Ductile Iron8.32J-801J-806P-807 True03800.751280.000130.0Ductile Iron8.32J-807J-803P-808 True03631.182010.000130.0Ductile Iron8.32J-803J-804P-809 True02760.49830.000130.0Ductile Iron8.32J-803J-806P-810 True02930.591010.000130.0Ductile Iron8.32J-508J-803P-812 True02941.051780.000130.0Ductile Iron8.32J-505J-804P-813 True02720.981650.000130.0Ductile Iron8.32J-804J-805P-814 True03741.58-2690.000130.0Ductile Iron8.32J-34J-804P-815 True02470.43720.000130.0Ductile Iron8.32J-811J-711P-816 True03460.10-170.000130.0Ductile Iron8.32J-812J-811P-817 True03810.19330.000130.0Ductile Iron8.32J-810J-811P-818 True03440.07-110.000130.0Ductile Iron8.32J-813J-810P-819 True03300.08-130.000130.0Ductile Iron8.32J-809J-810P-820 True03420.15-260.000130.0Ductile Iron8.32J-814J-809P-821 True03310.26-440.000130.0Ductile Iron8.32J-808J-809P-822 True03400.57970.000130.0Ductile Iron8.32J-808J-802P-823 True03560.28-480.000130.0Ductile Iron8.32J-8J-808P-824 True03290.621060.000130.0Ductile Iron8.32J-814J-802P-825 True03300.16280.000130.0Ductile Iron8.32J-813J-814P-826 True03810.21-350.000130.0Ductile Iron8.32J-812J-813P-827 True01760.62-1050.000130.0Ductile Iron8.32J-702J-812P-828 Page 6 of 727 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 9/14/2022 WaterCAD [10.03.02.75]Bentley Systems, Inc. Haestad Methods Solution CenterSUD PHASE 3 WATERCAD.wtg FlexTable: Pipe Table Is Active?Length (User Defined) (ft) Length (Scaled) (ft) Velocity (ft/s) Flow (gpm) Minor Loss Coefficient (Local) Hazen- Williams C MaterialDiameter (in) Stop NodeStart NodeLabel True03080.04-70.000130.0Ductile Iron8.32J-816J-716P-832 True03070.26-440.000130.0Ductile Iron8.32J-713J-816P-833 True03460.23390.000130.0Ductile Iron8.32J-816J-715P-834 True01140.13220.000130.0Ductile Iron8.32J2000J-716P2000 True03530.19-330.000130.0Ductile Iron8.32J2001J2000P2001 True0610.03-60.000130.0Ductile Iron8.32J2002J2000P2002 True03420.0590.000130.0Ductile Iron8.32J2003J2002P2003 True0220.08-140.000130.0Ductile Iron8.32J2004J2002P2004 True02540.08-140.000130.0Ductile Iron8.32J2005J2004P2005 True01720.36-610.000130.0Ductile Iron8.32J2006J2005P2006 True01820.19-320.000130.0Ductile Iron8.32J2007J2006P2007 True0360.08-140.000130.0Ductile Iron8.32J2008J2005P2008 True03430.10160.000130.0Ductile Iron8.32J2009J2008P2009 True01700.18-300.000130.0Ductile Iron8.32J-710J2008P2010 True02050.17-290.000130.0Ductile Iron8.32J2011J2006P2011 Page 7 of 727 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 9/14/2022 WaterCAD [10.03.02.75]Bentley Systems, Inc. Haestad Methods Solution CenterSUD PHASE 3 WATERCAD.wtg UGEUGEUGEUGEUGESSSSWWWWWWWWWWWWWWSDSDSDSDSDSDSDSDSDSDSDSDSDSDOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHESDUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGESD STUCKY RD(48' WIDTH - 90' ROW)WWWWWWWWWWWWWWWWWWWWWWSSSSSSSSSSOHEOHEOHEOHEOHEOHEOHEOHEFOPT FOPTCOMMCOMMCOMMCOMMWWWWW W W W W W W W W W W W WSSSSSSUGE UGEUGEGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASUGEUGESSSSCOMMCOMMCOMMCOMMCOMMCOMMCOMMUGEFOPTFOPTFOPTFOPTFOPTFOPTFOPTFOPTFOPTFOPTFOPTFOPTFOPTFOPTFOPTFOPTFOPTEEEEECCC SSW W W W W SS SS SS SS SS SSSTATE ST(35' WIDTH - 60' ROW)SDSDSDSDSDSS SS SS SS SS SD SD STUCKY RD(48' WIDTH - 90' ROW)SDSDSDSOUTH 17TH AVES 19TH AVE(ROW WIDTH VARIES)S 19TH AVE(ROW WIDTH VARIES)SSSSSSSSW W W W W W W W SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SDSDSDSDWWWWWWWWWWWWWWSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSWWWWW SSSSSSSSWWWWWSSSSSSSSSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDW WUGEUGEUGEWWWWWWUGEUGE SOUTH 17TH AVE(47' WIDTH - 70' ROW)SDSDSDSDSD SD SD SD SD SD SD SD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SDSD SDSDSDSDSDSDSDSDSDSD SD SD SD SDSDSDSDSD SD SD SD SDSDSDSDSD SD SD SD SDSDSDSDSDSDSDSDSD SD SD SD SD SDSDSD SDSDCOVERED PARKING STRUCTUREAISLE "5"AISLE "4"AISLE "2"AISLE "3"AISLE "1"SOUTH 18TH AVE.AISLE "A"AISLE "B"AISLE "C"AISLE "D"AISLE "E"BLDG. - ABLDG. - BBLDG. - CBLDG. - DBLDG. - EBLDG. - FBLDG. - GBLDG. - HBLDG. - PBLDG. -OBLDG. - NBLDG. - MBLDG. - LBLDG. - KBLDG. - JBLDG. - IBLDG. - QBLDG. - RBLDG. - TBLDG. - SBLDG. - UAPARTMENTBLDG.C2.0WATER PLAN1 3/9/2022 CONCEPT SUBMITTAL ZWL CDP 2 7/1/2022 SITE PLAN SUBMITTAL ZWL CDP 3 9/23/2022 SITE PLAN RESUBMITTAL ZWL CDP PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESSUD PH3 BLOCK 2 WENTWORTH PROPERTY COMPANY