Loading...
HomeMy WebLinkAbout006.01 Appendix E - Stucky & S 19th Intersection Analysis MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 Mailing Address: P.O. Box 80785 Billings, MT 59108-0785 Phone: 406-655-4550 FAX: 406-655-4991 Email: bobm@marvinassociates.com Zach Lowe, P.E. Stahly Engineering 851 Bridger Drive, Suite 1 Bozeman, MT 59715 October 26, 2022 Re: SUD Phase 3 Block 2 TIS This letter and attachments are in response to the City of Bozeman’s review comment on the TIS, dated 10/11/2022. The review comment indicted that the TIS requires supplemental information for the intersection of Stucky Road and S 19th Avenue. Specifically, timing of future improvements at the intersection and the type of improvements that would mitigate traffic increases in the future, are needed. Future Traffic Volumes In order to determine the timing and type of improvements that may be needed additional traffic projection were required for future conditions in 5 year increments, based on proposed developments and the 2% annual growth rate in background traffic, as noted in the TIS Report. An incremental traffic volume figure is attached, which shows the AM and PM peak hour volumes for five different time periods. The first projection is for year 2022 traffic which includes SUD Phase 3 Blocks 1 thru 4 developments. These volumes are also shown in Figure 7 of the SUD Phase 3 Block 4 Report. Traffic projections for future years 2027, 2032, and 2037 are also shown in that figure. Future Traffic Operations Capacity calculations (attached) were completed based on volumes shown in the incremental traffic projections figure based on the existing roadway controls and recently constructed improvements at the intersection. The table below is a summary of the measures of efficiency at the intersection that would exist if no other improvements were made at the intersection. PEAK AM HOUR PEAK PM HOUR Intersection Int/App Delay LOS Max Q Int/App Delay LOS Max Q Overall 24.0 C 10 Overall 24.9 C 12 EB- Worst 30.3 C 8 WB- Worst 26.9 C 3 Overall 27.9 C 11 Overall 28.1 C 14 EB- Worst 35.1 D 9 SB- Worst 31.4 C 14 Overall 31.9 C 12 Overall 33.4 C 15 EB- Worst 46.7 D 11 SB- Worst 41.3 D 15 Overall 33.6 C 11 Overall 36.2 D 21 WB- Worst 44.6 D 4 SB- Worst 44.9 D 21 YEAR 2037 YEAR 2032 Stucky Road & S 19th Avenue Capacity With Block 1-4 Traffic Future Years YEAR 2023 YEAR 2027 MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 Mailing Address: P.O. Box 80785 Billings, MT 59108-0785 Phone: 406-655-4550 FAX: 406-655-4991 Email: bobm@marvinassociates.com In the year 2023, assuming an unlikely scenario where all of SUD Phase Blocks are developed, all of the intersection approaches would operate at a level of service (LOS) “C” or better. However, the maximum queue on the eastbound left turn lane would need to store 8 vehicles in the peak AM hour and the left turn bay is only long enough to store 6 vehicles. That means there could be some additional delay for a few signal cycles in the AM hour, but this a condition that currently exists and additional SUD Phase 3 traffic would not substantially impact that condition. In the year 2027, additional background traffic growth on Stucky Road and on S 19th Avenue would increase to the point where the eastbound approach would operate at LOS “D” with potential to increase the left-turn queues and temporarily block or delay eastbound through movements. Traffic growth into year 2032 would create 11 seconds additional delay on the eastbound approach while the southbound approach on S 19th Avenue would operate at LOS “D” in the peak PM hour period. The year 2037 operations would require changes to signal timing to minimize overall delay at the intersection but would still operate at an overall LOS “D”. Future Intersection Improvements Attached is a figure illustrating recommended future improvements at the intersection of Stucky Road and S 19th Avenue along with the approximate timing of when those improvements would be needed. The first improvement that would be needed in the year 2027 would be the addition of a separate right turn lane for eastbound traffic on Stucky Road. That improvement would extend desirable operations on the eastbound approach for an additional 5 years. In the year 2032, an additional traffic lane should be constructed on the west side of S 19th Avenue south of Stucky Road and the southbound right turn lane could be redesignated as a thru/right lane north of Stucky Lane. Those two improvements would allow an overall LOS “C” to the year 2037. At some time between 2032 and 2037, Stucky Road west of S 19th would need to be improved along its length, since the projected traffic would greatly exceed the practical capacity of a two lane roadway. Some considerations should be made to include a three-lane roadway, with a TWLTL, when the additional right turn lane is constructed on the eastbound approach, as illustrated in the attached figure. MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 Mailing Address: P.O. Box 80785 Billings, MT 59108-0785 Phone: 406-655-4550 FAX: 406-655-4991 Email: bobm@marvinassociates.com Future Capacity of Mitigating Measures Capacity calculations (attached) were completed based on the recommended improvements in each of the future years. The table below summarizes the measures of efficiency associated with those improvements. The overall operation of the intersection be LOS “C” in each of the future years. The only individual approach that would not operate at LOS “C” would be the eastbound approach on Stucky Road which would operate at LOS “D.” However the delay on that approach would only be 3 seconds per vehicle more than the LOS “C” criteria. It should be noted that the projected left-turn volume on the eastbound approach exceeds 400 vehicles in the peak AM hour. Typically, when a left turn lane exceeds 300 vph, dual left turns should be considered. An alternative improvement for year 2037 traffic and beyond was analyzed and it was determined that the increased capacity would be minimal while the required geometric improvements would be extensive. The level of confidence in traffic projections for the eastbound left turn movement is questionable because it is dependent upon developments that could occur in the northwest corner of the intersection and whether the intersection of Stucky and S 11th would be signalized. At least 25% of the projected eastbound left turn movements would become thru movements onto Stucky east of S 19th Avenue with the S 11th signal. More definitive project planning efforts can be set forth once in-fill of vacant land has begun and recently constructed roads and intersections have operated for a year or longer. If additional information is desired, feel free to contact me. . Respectfully Submitted Robert R, Marvin, PE,PTOE PEAK AM HOUR PEAK PM HOUR Intersection Int/App Delay LOS Max Q Int/App Delay LOS Max Q Overall 28.1 C 9 Overall 25.7 C 13 WB- Worst 28.9 C 5 SB- Worst 33.5 C 13 Overall 31.9 C 11 Overall 27.1 C 17 EB- Worst 34.7 C 9 SB- Worst 29.5 C 17 Overall 32.7 C 11 Overall 28.1 C 15 EB- Worst 38.1 D 11 SB- Worst 31.2 C 15 Stucky Road & S 19th Avenue Capacity With Future Mitigation Recommendations YEAR 2027 YEAR 2032 YEAR 2037 SUPPLEMETAL FIGURES 98 29046 64970 AM 8975 PM 50 38593 53621524 152273649274 53 2822927349 110 Existing Plus SUD Phase 3 Blocks 1 -4 108 31946 71477 AM 9883 PM 55 424102 59023726 1673039010175 58 3325230384 110 Year 2027 Projections with Blocks 1 -4 120 35355 79285 AM 10892 PM 58 470101 65326229 1853342011076 64 3527932425 110 Year 2032 Projections with Blocks 1 -4 Year 2037 Projections with Blocks 1 -4 38660 861AM290 32 2053632430 111 131 92 PM 58 533111 70743377 72 50309 120101 119STUCKY RD & S 19TH AVE TRAFFIC PROJECTIONS IN 5 YEAR INCREMENTS MARVIN & ASSOCIATES N Year 2027 - Add Right Turn Lane Year 2032 - Add Southbound Lane on S 19th Year 2032 - Add Southbound Right-turn Lane on S 19th Year 2022 - Recently Constructed Improvements Year 2032 - 2037 Reconstruct Stucky Road with TWLTL Recommended Future Improvements at Stucky Road and S 19th Avenue IntersectionS 19th AvenueStucky Road MARVIN & ASSOCIATES N CAPACITY CALCULATIONS Incremental Years 2022 to 2037 HCM Analysis Summary Year 2027 Plus Phase 1-4 R Marvin Peak AM Hour Analysis Duration: 15 mins. Stucky Road/S 19th Avenue 10/24/2022 Case: STUCKY & 19TH AM YEAR 2027 PLUS Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 2 1 2 1 3 2 3 1 L 12.0 L 12.0 L 12.0 L 12.0 TR 12.0 TR 12.0 T 12.0 T 12.0 TR 12.0 R 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 TR 3 L 3 TR 3 L 3 TR 3 L 3 T 3 R 3 384 0.92 2 77 0.90 2 108 0.92 2 26 0.90 2 49 0.90 2 110 0.90 2 167 0.92 2 714 0.92 5 30 0.90 2 30 0.90 2 319 0.92 5 237 0.92 2 45 0 0 0 --- --- 35 0 0 0 --- --- 5 5 0 0 --- --- 105 5 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only L L R LTP LTP L L LTP LTP 0 13.0 4.0 0.0 23.0 3.5 1.5 8.0 4.0 0.0 37.0 4.0 2.0 Actuated 100.0 Sec 14.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB * Lper 270 0.194 0.280 35.1 D * Lpro 230 0.130 0.130 L 0.834 35.9 D TR 400 0.089 0.230 TR 0.385 32.8 C WB Lper 255 0.000 0.280 29.9 C Lpro 230 0.016 0.130 L 0.060 18.0 B TR 389 0.081 0.230 TR 0.352 32.5 C NB Lper 288 0.060 0.430 26.4 C * Lpro 142 0.080 0.080 L 0.423 17.8 B * TR 1265 0.235 0.370 TR 0.636 28.4 C SB Lper 153 0.000 0.430 22.4 C Lpro 142 0.019 0.080 L 0.112 15.0 B T 670 0.192 0.370 T 0.518 27.4 C R 851 0.091 0.540 R 0.168 12.1 B Intersection: Delay = 27.9sec/veh Int. LOS=C Xc= 0.74 * Critical Lane Group (v/s)Crit= 0.64 SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Year 2027 Plus Phase 1-4 R Marvin Peak AM Hour Stucky Road/S 19th Avenue 10/24/2022 Case: STUCKY & 19TH AM YEAR 2027 PLUS App Group Lane (veh) Avg/MaxPer LaneQueues (mph) SpeedAverage Period) (% of PeakWorst LaneSpillback in EB L 8 / 9 10.6 0.0 TR 3 / 4 13.3 0.0 All 11.2 0.0 WB L 0 / 1 10.0 0.0 TR 3 / 5 13.0 0.0 All 12.8 0.0 NB L 2 / 5 9.3 0.0 TR 7 / 9 10.5 0.0 All 10.4 0.0 SB L 1 / 2 9.8 0.0 T 6 / 11 13.1 0.0 R 2 / 3 20.5 0.0 All 14.1 0.0 Intersect. 11.6 SIG/Cinema v3.08 Marvin & Associates Page 2 384 77 108 26 49 110 167 714 30 30 319 237 1 13 04 1 13 04 1 13 04 2 22 24 2 22 24 3 8 04 3 8 04 4 37 24 4 37 24 HCM Analysis Summary Year 2027 Plus Phase 1-4 R Marvin Peak PM Hour Analysis Duration: 15 mins. Stucky Road/S 19th Avenue 10/24/2022 Case: STUCKY & 19TH PM YEAR 2027 PLUS Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 2 1 2 1 3 2 3 1 L 12.0 L 12.0 L 12.0 L 12.0 TR 12.0 TR 12.0 T 12.0 T 12.0 TR 12.0 R 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 TR 3 L 3 TR 3 L 3 TR 3 L 3 T 3 R 3 252 0.92 2 102 0.90 2 83 0.92 2 58 0.90 2 55 0.90 2 75 0.90 2 98 0.92 2 424 0.92 5 33 0.90 2 101 0.90 2 590 0.92 5 390 0.92 2 20 0 0 0 --- --- 20 0 0 0 --- --- 5 5 0 0 --- --- 110 5 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only L L R LTP LTP L L LTP LTP 0 10.0 4.0 0.0 23.0 3.5 1.5 8.0 4.0 0.0 40.0 4.0 2.0 Actuated 100.0 Sec 19.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB Lper 283 0.096 0.280 28.3 C * Lpro 177 0.100 0.100 L 0.596 25.0 C * TR 404 0.103 0.230 TR 0.448 33.3 C WB Lper 232 0.000 0.280 28.1 C Lpro 177 0.036 0.100 L 0.156 20.4 C TR 396 0.071 0.230 TR 0.308 32.1 C NB Lper 101 0.000 0.460 22.1 C Lpro 142 0.060 0.080 L 0.440 23.3 C TR 1362 0.145 0.400 TR 0.361 21.8 C SB Lper 316 0.000 0.460 31.4 C * Lpro 142 0.063 0.080 L 0.245 13.1 B * T 724 0.354 0.400 T 0.885 42.8 D R 851 0.193 0.540 R 0.357 14.3 B Intersection: Delay = 28.1sec/veh Int. LOS=C Xc= 0.77 * Critical Lane Group (v/s)Crit= 0.62 SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Year 2027 Plus Phase 1-4 R Marvin Peak PM Hour Stucky Road/S 19th Avenue 10/24/2022 Case: STUCKY & 19TH PM YEAR 2027 PLUS App Group Lane (veh) Avg/MaxPer LaneQueues (mph) SpeedAverage Period) (% of PeakWorst LaneSpillback in EB L 6 / 8 9.4 0.0 TR 4 / 6 10.4 0.0 All 9.7 0.0 WB L 1 / 2 10.3 0.0 TR 3 / 4 10.5 0.0 All 10.5 0.0 NB L 2 / 3 10.0 0.0 TR 4 / 6 12.2 0.0 All 11.9 0.0 SB L 2 / 4 8.0 0.0 T 10 / 14 11.8 0.0 R 2 / 3 19.4 0.0 All 12.3 0.0 Intersect. 11.5 SIG/Cinema v3.08 Marvin & Associates Page 2 252 102 83 58 55 75 98 424 33 101 590 390 1 10 04 1 10 04 1 10 04 2 22 24 2 22 24 3 8 04 3 8 04 4 40 24 4 40 24 HCM Analysis Summary Year 2032 Plus Phase 1-4 R Marvin Peak AM Hour Analysis Duration: 15 mins. Stucky Road/S 19th Avenue 10/24/2022 Case: STUCKY & 19TH AM YEAR 2032 PLUS Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 2 1 2 1 3 2 3 1 L 12.0 L 12.0 L 12.0 L 12.0 TR 12.0 TR 12.0 T 12.0 T 12.0 TR 12.0 R 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 TR 3 L 3 TR 3 L 3 TR 3 L 3 T 3 R 3 425 0.92 2 85 0.90 2 120 0.92 2 29 0.90 2 55 0.90 2 110 0.90 2 185 0.92 2 792 0.92 5 33 0.90 2 32 0.90 2 353 0.92 5 262 0.92 2 45 0 0 0 --- --- 35 0 0 0 --- --- 5 5 0 0 --- --- 105 5 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only L L R LTP LTP L L LTP LTP 0 13.0 4.0 0.0 23.0 3.5 1.5 8.0 4.0 0.0 37.0 4.0 2.0 Actuated 100.0 Sec 14.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB * Lper 264 0.246 0.280 46.7 D * Lpro 230 0.130 0.130 L 0.935 51.8 D TR 399 0.102 0.230 TR 0.441 33.3 C WB Lper 237 0.000 0.280 30.0 C Lpro 230 0.018 0.130 L 0.069 18.1 B TR 391 0.085 0.230 TR 0.368 32.6 C NB Lper 258 0.098 0.430 28.3 C * Lpro 142 0.080 0.080 L 0.502 19.8 B * TR 1265 0.261 0.370 TR 0.705 30.2 C SB Lper 123 0.000 0.430 23.2 C Lpro 142 0.020 0.080 L 0.136 15.9 B T 670 0.212 0.370 T 0.573 28.7 C R 851 0.109 0.540 R 0.201 12.4 B Intersection: Delay = 31.9sec/veh Int. LOS=C Xc= 0.83 * Critical Lane Group (v/s)Crit= 0.72 SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Year 2032 Plus Phase 1-4 R Marvin Peak AM Hour Stucky Road/S 19th Avenue 10/24/2022 Case: STUCKY & 19TH AM YEAR 2032 PLUS App Group Lane (veh) Avg/MaxPer LaneQueues (mph) SpeedAverage Period) (% of PeakWorst LaneSpillback in EB L 9 / 11 9.8 0.0 TR 3 / 5 13.5 0.0 All 10.7 0.0 WB L 0 / 1 12.5 0.0 TR 3 / 5 12.3 0.0 All 12.3 0.0 NB L 4 / 7 6.7 0.0 TR 8 / 12 10.7 0.0 All 10.0 0.0 SB L 1 / 2 9.8 0.0 T 6 / 11 12.8 0.0 R 2 / 2 19.9 0.0 All 13.8 0.0 Intersect. 11.2 SIG/Cinema v3.08 Marvin & Associates Page 2 425 85 120 29 55 110 185 792 33 32 353 262 1 13 04 1 13 04 1 13 04 2 22 24 2 22 24 3 8 04 3 8 04 4 37 24 4 37 24 HCM Analysis Summary Year 2032 Plus Phase 1-4 R Marvin Peak PM Hour Analysis Duration: 15 mins. Stucky Road/S 19th Avenue 10/24/2022 Case: STUCKY & 19TH PM YEAR 2032 PLUS Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 2 1 2 1 3 2 3 1 L 12.0 L 12.0 L 12.0 L 12.0 TR 12.0 TR 12.0 T 12.0 T 12.0 TR 12.0 R 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 TR 3 L 3 TR 3 L 3 TR 3 L 3 T 3 R 3 279 0.92 2 101 0.90 2 92 0.92 2 64 0.90 2 58 0.90 2 76 0.90 2 108 0.92 2 470 0.92 5 35 0.90 2 110 0.90 2 653 0.92 5 420 0.92 2 20 0 0 0 --- --- 20 0 0 0 --- --- 5 5 0 0 --- --- 110 5 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only L L R LTP LTP L L LTP LTP 0 10.0 4.0 0.0 23.0 3.5 1.5 8.0 4.0 0.0 40.0 4.0 2.0 Actuated 100.0 Sec 14.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB * Lper 280 0.126 0.280 29.8 C * Lpro 177 0.100 0.100 L 0.663 27.4 C TR 402 0.109 0.230 TR 0.473 33.6 C WB Lper 225 0.000 0.280 28.0 C Lpro 177 0.040 0.100 L 0.177 20.5 C TR 397 0.073 0.230 TR 0.317 32.1 C NB Lper 75 0.000 0.460 23.5 C Lpro 142 0.066 0.080 L 0.539 29.2 C TR 1362 0.160 0.400 TR 0.399 22.3 C SB Lper 290 0.000 0.460 41.3 D * Lpro 142 0.069 0.080 L 0.282 13.7 B * T 724 0.392 0.400 T 0.981 58.7 E R 851 0.214 0.540 R 0.396 14.8 B Intersection: Delay = 33.4sec/veh Int. LOS=C Xc= 0.80 * Critical Lane Group (v/s)Crit= 0.69 SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Year 2032 Plus Phase 1-4 R Marvin Peak PM Hour Stucky Road/S 19th Avenue 10/24/2022 Case: STUCKY & 19TH PM YEAR 2032 PLUS App Group Lane (veh) Avg/MaxPer LaneQueues (mph) SpeedAverage Period) (% of PeakWorst LaneSpillback in EB L 6 / 7 10.2 0.0 TR 4 / 6 10.5 0.0 All 10.3 0.0 WB L 1 / 1 14.4 0.0 TR 4 / 5 10.0 0.0 All 10.7 0.0 NB L 3 / 7 5.5 0.0 TR 5 / 6 12.7 0.0 All 11.2 0.0 SB L 3 / 7 6.4 0.0 T 12 / 15 11.0 0.0 R 3 / 5 17.0 0.0 All 11.2 0.0 Intersect. 11.0 SIG/Cinema v3.08 Marvin & Associates Page 2 279 101 92 64 58 76 108 470 35 110 653 420 1 10 04 1 10 04 1 10 04 2 22 24 2 22 24 3 8 04 3 8 04 4 40 24 4 40 24 HCM Analysis Summary Future Traffic R Marvin Peak AM Hour Analysis Duration: 15 mins. Stucky Road/S 19th Avenue 8/24/22 Case: STUCKY & 19TH AM FUTURE Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 2 1 2 1 3 2 3 2 L 12.0 L 12.0 L 12.0 L 12.0 TR 12.0 TR 12.0 T 12.0 T 12.0 TR 12.0 TR 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 TR 3 L 3 TR 3 L 3 TR 3 L 3 TR 3 471 0.92 1 92 0.90 1 131 0.92 1 32 0.90 1 49 0.90 1 111 0.90 1 205 0.92 1 861 0.92 5 36 0.90 1 30 0.90 1 386 0.92 5 290 0.92 1 45 0 0 0 --- --- 25 0 0 0 --- --- 5 5 0 0 --- --- 110 5 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only LTR LTP LTP L L LTP LTP 0 24.0 4.0 0.0 15.0 3.5 1.5 8.0 4.0 0.0 39.0 4.0 2.0 Actuated 105.0 Sec 14.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB * Lper 140 0.141 0.190 40.9 D * Lpro 408 0.228 0.229 L 0.934 48.6 D TR 715 0.112 0.410 TR 0.273 20.7 C WB L 171 0.030 0.143 L 0.211 40.0 D 44.6 D TR 243 0.088 0.143 TR 0.617 45.8 D NB Lper 228 0.163 0.429 31.5 C * Lpro 136 0.076 0.076 L 0.613 23.6 C * TR 1270 0.284 0.371 TR 0.764 33.4 C SB Lper 100 0.000 0.429 26.4 C Lpro 136 0.018 0.076 L 0.140 17.8 B TR 1237 0.185 0.371 TR 0.498 26.9 C Intersection: Delay = 33.6sec/veh Int. LOS=C Xc= 0.84 * Critical Lane Group (v/s)Crit= 0.73 SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Future Traffic R Marvin Peak AM Hour Stucky Road/S 19th Avenue 8/24/22 Case: STUCKY & 19TH AM FUTURE App Group Lane (veh) Avg/MaxPer LaneQueues (mph) SpeedAverage Period) (% of PeakWorst LaneSpillback in EB L 10 / 12 10.2 0.0 TR 3 / 6 14.3 0.0 All 11.3 0.0 WB L 1 / 1 11.5 0.0 TR 3 / 4 11.5 0.0 All 11.5 0.0 NB L 6 / 11 3.5 0.0 TR 9 / 11 10.5 0.0 All 8.7 0.0 SB L 1 / 2 7.4 0.0 TR 5 / 8 12.3 0.0 All 12.0 0.0 Intersect. 10.2 SIG/Cinema v3.08 Marvin & Associates Page 2 471 92 131 32 49 111 205 861 36 30 386 290 1 24 04 2 14 24 2 14 24 3 8 04 3 8 04 4 39 24 4 39 24 HCM Analysis Summary Year 2037 Plus Phase 1-4 R Marvin Peak PM Hour Analysis Duration: 15 mins. Stucky Road/S 19th Avenue 10/24/2022 Case: STUCKY & 19TH PM YEAR 2037 PLUS Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 2 1 2 1 3 2 3 1 L 12.0 L 12.0 L 12.0 L 12.0 TR 12.0 TR 12.0 T 12.0 T 12.0 TR 12.0 R 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 TR 3 L 3 TR 3 L 3 TR 3 L 3 T 3 R 3 309 0.92 2 111 0.90 2 101 0.92 2 72 0.90 2 58 0.90 2 77 0.90 2 120 0.92 2 533 0.92 5 50 0.90 2 119 0.90 2 707 0.92 5 433 0.92 2 20 0 0 0 --- --- 20 0 0 0 --- --- 5 5 0 0 --- --- 110 5 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only L L R LTP LTP L L LTP LTP 0 9.0 4.0 0.0 22.0 3.5 1.5 8.0 4.0 0.0 42.0 4.0 2.0 Actuated 100.0 Sec 14.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB * Lper 265 0.180 0.270 36.5 D * Lpro 159 0.090 0.090 L 0.792 37.1 D TR 384 0.121 0.220 TR 0.549 35.6 D WB Lper 194 0.000 0.270 28.8 C Lpro 159 0.045 0.090 L 0.227 22.1 C TR 379 0.074 0.220 TR 0.335 33.0 C NB Lper 74 0.000 0.480 23.5 C Lpro 142 0.073 0.080 L 0.602 32.4 C TR 1426 0.185 0.420 TR 0.441 21.6 C SB Lper 269 0.000 0.480 44.9 D * Lpro 142 0.075 0.080 L 0.321 13.5 B * T 760 0.424 0.420 T 1.011 64.3 E R 867 0.223 0.550 R 0.405 14.4 B Intersection: Delay = 36.2sec/veh Int. LOS=D Xc= 0.89 * Critical Lane Group (v/s)Crit= 0.77 SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Year 2037 Plus Phase 1-4 R Marvin Peak PM Hour Stucky Road/S 19th Avenue 10/24/2022 Case: STUCKY & 19TH PM YEAR 2037 PLUS App Group Lane (veh) Avg/MaxPer LaneQueues (mph) SpeedAverage Period) (% of PeakWorst LaneSpillback in EB L 7 / 9 8.9 0.0 TR 5 / 6 8.6 0.0 All 8.8 0.0 WB L 1 / 2 13.6 0.0 TR 4 / 5 10.2 0.0 All 10.8 0.0 NB L 3 / 6 4.4 0.0 TR 5 / 7 12.5 0.0 All 10.6 0.0 SB L 3 / 4 9.9 0.0 T 13 / 21 10.5 2.0 R 5 / 11 13.1 0.0 All 10.8 2.0 Intersect. 10.3 SIG/Cinema v3.08 Marvin & Associates Page 2 309 111 101 72 58 77 120 533 50 119 707 433 1 9 04 1 9 04 1 9 04 2 21 24 2 21 24 3 8 04 3 8 04 4 42 24 4 42 24 CAPACITY CALCULATIONS Mitigating Measures HCM Analysis Summary Year 2027 with EB RT Lane R Marvin Peak AM Hour Analysis Duration: 15 mins. Stucky Road/S 19th Avenue 10/24/2022 Case: STUCKY & 19TH AM YEAR 2027 EB RT Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 3 1 2 1 3 2 3 1 L 12.0 L 12.0 L 12.0 L 12.0 T 12.0 TR 12.0 T 12.0 T 12.0 R 12.0 TR 12.0 R 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 T 3 R 3 L 3 TR 3 L 3 TR 3 L 3 T 3 R 3 384 0.92 2 77 0.90 2 108 0.92 2 26 0.90 2 49 0.90 2 110 0.90 2 167 0.92 2 714 0.92 5 30 0.90 2 30 0.90 2 319 0.92 5 237 0.92 2 55 0 0 0 --- --- 35 0 0 0 --- --- 5 5 0 0 --- --- 105 5 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only L L R LTP LTP R L L LTP LTP 0 14.0 4.0 0.0 26.0 3.5 1.5 8.0 4.0 0.0 36.0 4.0 2.0 Actuated 103.0 Sec 14.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB * Lper 299 0.177 0.301 28.5 C * Lpro 241 0.136 0.136 L 0.772 29.2 C T 470 0.046 0.252 T 0.183 30.2 C R 584 0.037 0.369 R 0.099 21.3 C WB Lper 344 0.000 0.301 28.9 C Lpro 241 0.016 0.136 L 0.050 16.7 B TR 427 0.081 0.252 TR 0.321 31.5 C NB Lper 260 0.071 0.408 29.5 C * Lpro 137 0.077 0.078 L 0.458 20.5 C * TR 1195 0.235 0.350 TR 0.673 31.5 C SB Lper 135 0.000 0.408 24.8 C Lpro 137 0.019 0.078 L 0.121 17.0 B T 633 0.192 0.350 T 0.548 30.3 C R 826 0.091 0.524 R 0.173 13.3 B Intersection: Delay = 28.1sec/veh Int. LOS=C Xc= 0.72 * Critical Lane Group (v/s)Crit= 0.63 SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Year 2027 with EB RT Lane R Marvin Peak AM Hour Stucky Road/S 19th Avenue 10/24/2022 Case: STUCKY & 19TH AM YEAR 2027 EB RT App Group Lane (veh) Avg/MaxPer LaneQueues (mph) SpeedAverage Period) (% of PeakWorst LaneSpillback in EB L 8 / 9 7.6 0.0 T 2 / 4 18.9 0.0 R 1 / 2 15.2 0.0 All 11.9 0.0 WB L 0 / 1 12.0 0.0 TR 3 / 5 12.9 0.0 All 12.8 0.0 NB L 4 / 6 7.3 0.0 TR 8 / 9 10.1 0.0 All 9.7 0.0 SB L 1 / 3 6.5 0.0 T 6 / 8 13.2 0.0 R 2 / 4 19.3 0.0 All 13.6 0.0 Intersect. 11.3 SIG/Cinema v3.08 Marvin & Associates Page 2 384 77 108 26 49 110 167 714 30 30 319 237 1 14 04 1 14 04 1 14 04 2 25 24 2 25 24 3 8 04 3 8 04 3 8 04 4 36 24 4 36 24 HCM Analysis Summary Year 2027 with EB Right R Marvin Peak PM Hour Analysis Duration: 15 mins. Stucky Road/S 19th Avenue 10/24/2022 Case: STUCKY & 19TH PM YEAR 2027 EB RT Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 3 1 2 1 3 2 3 1 L 12.0 L 12.0 L 12.0 L 12.0 T 12.0 TR 12.0 T 12.0 T 12.0 R 12.0 TR 12.0 R 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 T 3 R 3 L 3 TR 3 L 3 TR 3 L 3 T 3 R 3 252 0.92 2 102 0.90 2 83 0.92 2 58 0.90 2 55 0.90 2 75 0.90 2 98 0.92 2 424 0.92 5 33 0.90 2 101 0.90 2 590 0.92 5 390 0.92 2 20 0 0 0 --- --- 20 0 0 0 --- --- 5 5 0 0 --- --- 110 5 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only L L R LTP LTP R L L LTP LTP 0 12.0 4.0 0.0 23.0 3.5 1.5 8.0 4.0 0.0 40.0 4.0 2.0 Actuated 102.0 Sec 19.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB Lper 276 0.066 0.275 25.7 C * Lpro 208 0.118 0.118 L 0.566 23.5 C T 420 0.061 0.225 T 0.269 32.7 C R 543 0.043 0.343 R 0.125 23.0 C WB Lper 284 0.000 0.275 28.5 C Lpro 208 0.036 0.118 L 0.130 19.7 B * TR 389 0.071 0.225 TR 0.314 33.1 C NB Lper 90 0.000 0.451 23.3 C Lpro 139 0.060 0.078 L 0.467 25.4 C TR 1335 0.145 0.392 TR 0.369 22.8 C SB Lper 307 0.000 0.451 33.5 C * Lpro 139 0.063 0.078 L 0.251 14.0 B * T 710 0.354 0.392 T 0.903 46.1 D R 865 0.193 0.549 R 0.351 14.0 B Intersection: Delay = 28.9sec/veh Int. LOS=C Xc= 0.74 * Critical Lane Group (v/s)Crit= 0.61 SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Year 2027 with EB Right R Marvin Peak PM Hour Stucky Road/S 19th Avenue 10/24/2022 Case: STUCKY & 19TH PM YEAR 2027 EB RT App Group Lane (veh) Avg/MaxPer LaneQueues (mph) SpeedAverage Period) (% of PeakWorst LaneSpillback in EB L 6 / 7 6.9 0.0 T 3 / 5 15.6 0.0 R 1 / 2 10.6 0.0 All 10.9 0.0 WB L 1 / 2 11.8 0.0 TR 4 / 5 10.4 0.0 All 10.6 0.0 NB L 2 / 5 6.5 0.0 TR 4 / 6 12.5 0.0 All 11.4 0.0 SB L 2 / 4 8.5 0.0 T 11 / 13 11.1 0.0 R 3 / 5 16.9 0.0 All 11.6 0.0 Intersect. 11.3 SIG/Cinema v3.08 Marvin & Associates Page 2 252 102 83 58 55 75 98 424 33 101 590 390 1 12 04 1 12 04 1 12 04 2 22 24 2 22 24 3 8 04 3 8 04 3 8 04 4 40 24 4 40 24 HCM Analysis Summary Year 2032 EB RT & Add SB Lane R Marvin Peak AM Hour Analysis Duration: 15 mins. Stucky Road/S 19th Avenue 10/24/2022 Case: STUCKY & 19TH AM YEAR 2027 EB RT Add SB Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 3 1 2 1 3 2 3 2 L 12.0 L 12.0 L 12.0 L 12.0 T 12.0 TR 12.0 T 12.0 T 12.0 R 12.0 TR 12.0 TR 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 T 3 R 3 L 3 TR 3 L 3 TR 3 L 3 TR 3 425 0.92 2 85 0.90 2 120 0.92 2 29 0.90 2 55 0.90 2 110 0.90 2 185 0.92 2 792 0.92 5 33 0.90 2 32 0.90 2 353 0.92 5 262 0.92 2 60 0 0 0 --- --- 20 0 0 0 --- --- 5 5 0 0 --- --- 110 5 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only L L LTP LTP R L L LTP LTP 0 17.0 4.0 0.0 25.0 3.5 1.5 8.0 4.0 0.0 37.0 4.0 2.0 Actuated 106.0 Sec 14.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB * Lper 254 0.198 0.283 34.7 C * Lpro 284 0.160 0.160 L 0.859 36.7 D T 439 0.050 0.236 T 0.214 32.7 C R 553 0.041 0.349 R 0.118 23.5 C WB Lper 312 0.000 0.283 31.5 C Lpro 284 0.018 0.160 L 0.054 16.8 B TR 398 0.095 0.236 TR 0.405 34.5 C NB Lper 234 0.116 0.406 32.5 C * Lpro 134 0.076 0.075 L 0.546 22.9 C * TR 1193 0.261 0.349 TR 0.748 34.7 C SB Lper 105 0.000 0.406 27.7 C Lpro 134 0.020 0.075 L 0.151 18.9 B TR 1155 0.166 0.349 TR 0.475 28.3 C Intersection: Delay = 31.9sec/veh Int. LOS=C Xc= 0.80 * Critical Lane Group (v/s)Crit= 0.70 SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Year 2032 EB RT & Add SB Lane R Marvin Peak AM Hour Stucky Road/S 19th Avenue 10/24/2022 Case: STUCKY & 19TH AM YEAR 2027 EB RT Add SB App Group Lane (veh) Avg/MaxPer LaneQueues (mph) SpeedAverage Period) (% of PeakWorst LaneSpillback in EB L 9 / 10 7.3 0.0 T 3 / 4 17.3 0.0 R 1 / 1 20.3 0.0 All 11.5 0.0 WB L 0 / 1 13.8 0.0 TR 2 / 4 15.0 0.0 All 15.0 0.0 NB L 4 / 6 6.7 0.0 TR 9 / 11 10.2 0.0 All 9.7 0.0 SB L 1 / 3 7.4 0.0 TR 6 / 9 11.0 0.0 All 10.8 0.0 Intersect. 10.7 SIG/Cinema v3.08 Marvin & Associates Page 2 425 85 120 29 55 110 185 792 33 32 353 262 1 17 04 1 17 04 2 24 24 2 24 24 3 8 04 3 8 04 3 8 04 4 37 24 4 37 24 HCM Analysis Summary Year 2032 Plus Phase 1-4 R Marvin Peak PM Hour Analysis Duration: 15 mins. Stucky Road/S 19th Avenue 10/24/2022 Case: STUCKY & 19TH PM YEAR 2032 PLUS Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 3 1 2 1 3 2 3 2 L 12.0 L 12.0 L 12.0 L 12.0 T 12.0 TR 12.0 T 12.0 T 12.0 R 12.0 TR 12.0 TR 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 T 3 R 3 L 3 TR 3 L 3 TR 3 L 3 TR 3 279 0.92 2 101 0.90 2 92 0.92 2 64 0.90 2 58 0.90 2 76 0.90 2 108 0.92 2 470 0.92 5 35 0.90 2 110 0.90 2 653 0.92 5 420 0.92 2 20 0 0 0 --- --- 20 0 0 0 --- --- 5 5 0 0 --- --- 110 5 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only L L LTP LTP R L L LTP LTP 0 10.0 4.0 0.0 23.0 3.5 1.5 8.0 4.0 0.0 40.0 4.0 2.0 Actuated 100.0 Sec 14.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB * Lper 280 0.126 0.280 27.6 C * Lpro 177 0.100 0.100 L 0.663 27.4 C T 428 0.060 0.230 T 0.262 31.7 C R 554 0.049 0.350 R 0.141 22.3 C WB Lper 292 0.000 0.280 27.8 C Lpro 177 0.040 0.100 L 0.151 20.2 C TR 397 0.073 0.230 TR 0.317 32.1 C NB Lper 99 0.000 0.460 22.4 C Lpro 142 0.066 0.080 L 0.485 22.7 C TR 1362 0.160 0.400 TR 0.399 22.3 C SB Lper 290 0.000 0.460 29.5 C * Lpro 142 0.069 0.080 L 0.282 13.7 B * TR 1319 0.318 0.400 TR 0.794 31.4 C Intersection: Delay = 27.1sec/veh Int. LOS=C Xc= 0.71 * Critical Lane Group (v/s)Crit= 0.61 SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Year 2032 Plus Phase 1-4 R Marvin Peak PM Hour Stucky Road/S 19th Avenue 10/24/2022 Case: STUCKY & 19TH PM YEAR 2032 PLUS App Group Lane (veh) Avg/MaxPer LaneQueues (mph) SpeedAverage Period) (% of PeakWorst LaneSpillback in EB L 6 / 7 6.9 0.0 T 3 / 5 15.8 0.0 R 1 / 2 21.8 0.0 All 11.3 0.0 WB L 0 / 1 14.4 0.0 TR 4 / 5 10.0 0.0 All 10.7 0.0 NB L 2 / 5 7.8 0.0 TR 5 / 6 12.8 0.0 All 12.1 0.0 SB L 3 / 7 6.6 0.0 TR 10 / 17 10.1 0.0 All 9.7 0.0 Intersect. 10.6 SIG/Cinema v3.08 Marvin & Associates Page 2 279 101 92 64 58 76 108 470 35 110 653 420 1 10 04 1 10 04 2 22 24 2 22 24 3 8 04 3 8 04 3 8 04 4 40 24 4 40 24 HCM Analysis Summary Year 2037 Plus EB RT & SB Add R Marvin Peak AM Hour Analysis Duration: 15 mins. Stucky Road/S 19th Avenue 10/24/2022 Case: STUCKY & 19TH AM YEAR 2037 ADD SB TH Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 3 1 2 1 3 2 3 2 L 12.0 L 12.0 L 12.0 L 12.0 T 12.0 TR 12.0 T 12.0 T 12.0 R 12.0 TR 12.0 TR 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 T 3 R 3 L 3 TR 3 L 3 TR 3 L 3 TR 3 430 0.92 2 92 0.90 2 131 0.92 2 32 0.90 2 60 0.90 2 111 0.90 2 205 0.92 2 861 0.92 5 36 0.90 2 32 0.90 2 386 0.92 5 290 0.92 2 45 0 0 0 --- --- 35 0 0 0 --- --- 5 5 0 0 --- --- 125 5 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only L L LTP LTP R L L LTP LTP 0 14.0 4.0 0.0 24.0 3.5 1.5 8.0 4.0 0.0 35.0 4.0 2.0 Actuated 100.0 Sec 14.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB * Lper 271 0.234 0.290 38.1 D * Lpro 248 0.140 0.140 L 0.900 43.0 D T 447 0.055 0.240 T 0.228 30.6 C R 570 0.059 0.360 R 0.163 21.8 C WB Lper 315 0.000 0.290 29.0 C Lpro 248 0.020 0.140 L 0.064 16.7 B TR 410 0.088 0.240 TR 0.368 31.9 C NB Lper 216 0.154 0.410 33.4 C * Lpro 142 0.080 0.080 L 0.623 24.1 C * TR 1197 0.284 0.350 TR 0.810 35.5 D SB Lper 84 0.000 0.410 26.9 C Lpro 142 0.020 0.080 L 0.159 18.3 B TR 1158 0.181 0.350 TR 0.517 27.4 C Intersection: Delay = 32.7sec/veh Int. LOS=C Xc= 0.86 * Critical Lane Group (v/s)Crit= 0.74 SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Year 2037 Plus EB RT & SB Add R Marvin Peak AM Hour Stucky Road/S 19th Avenue 10/24/2022 Case: STUCKY & 19TH AM YEAR 2037 ADD SB TH App Group Lane (veh) Avg/MaxPer LaneQueues (mph) SpeedAverage Period) (% of PeakWorst LaneSpillback in EB L 10 / 11 5.8 0.0 T 2 / 4 18.7 0.0 R 1 / 2 21.0 0.0 All 10.4 0.0 WB L 0 / 1 17.0 0.0 TR 3 / 5 12.6 0.0 All 12.8 0.0 NB L 5 / 7 4.9 0.0 TR 9 / 11 10.4 0.0 All 9.4 0.0 SB L 1 / 2 8.9 0.0 TR 6 / 9 11.8 0.0 All 11.6 0.0 Intersect. 10.4 SIG/Cinema v3.08 Marvin & Associates Page 2 430 92 131 32 60 111 205 861 36 32 386 290 1 14 04 1 14 04 2 23 24 2 23 24 3 8 04 3 8 04 3 8 04 4 35 24 4 35 24 HCM Analysis Summary Year 2032 EB RT & Add SB Lane R Marvin Peak PM Hour Analysis Duration: 15 mins. Stucky Road/S 19th Avenue 10/24/2022 Case: STUCKY & 19TH PM YEAR 2037 EB RT ADD SB Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 3 1 2 1 3 2 3 2 L 12.0 L 12.0 L 12.0 L 12.0 T 12.0 TR 12.0 T 12.0 T 12.0 R 12.0 TR 12.0 TR 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 T 3 R 3 L 3 TR 3 L 3 TR 3 L 3 TR 3 279 0.92 2 101 0.90 2 92 0.92 2 64 0.90 2 58 0.90 2 76 0.90 2 108 0.92 2 470 0.92 5 35 0.90 2 110 0.90 2 653 0.92 5 420 0.92 2 40 0 0 0 --- --- 20 0 0 0 --- --- 5 5 0 0 --- --- 110 5 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only L L LTP LTP R L L LTP LTP 0 12.0 4.0 0.0 23.0 3.5 1.5 8.0 4.0 0.0 40.0 4.0 2.0 Actuated 102.0 Sec 14.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB * Lper 272 0.096 0.275 26.8 C * Lpro 208 0.118 0.118 L 0.631 25.3 C T 420 0.060 0.225 T 0.267 32.7 C R 543 0.036 0.343 R 0.105 22.9 C WB Lper 285 0.000 0.275 28.4 C Lpro 208 0.040 0.118 L 0.144 19.8 B TR 389 0.073 0.225 TR 0.324 33.2 C NB Lper 93 0.000 0.451 23.6 C Lpro 139 0.066 0.078 L 0.504 24.5 C TR 1335 0.160 0.392 TR 0.407 23.4 C SB Lper 281 0.000 0.451 31.2 C * Lpro 139 0.069 0.078 L 0.290 14.7 B * TR 1293 0.318 0.392 TR 0.810 33.2 C Intersection: Delay = 28.1sec/veh Int. LOS=C Xc= 0.70 * Critical Lane Group (v/s)Crit= 0.60 SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Year 2032 EB RT & Add SB Lane R Marvin Peak PM Hour Stucky Road/S 19th Avenue 10/24/2022 Case: STUCKY & 19TH PM YEAR 2037 EB RT ADD SB App Group Lane (veh) Avg/MaxPer LaneQueues (mph) SpeedAverage Period) (% of PeakWorst LaneSpillback in EB L 6 / 7 7.0 0.0 T 3 / 5 15.3 0.0 R 1 / 1 22.0 0.0 All 11.3 0.0 WB L 1 / 1 20.2 0.0 TR 3 / 5 12.1 0.0 All 13.3 0.0 NB L 3 / 6 5.4 0.0 TR 5 / 6 11.9 0.0 All 10.6 0.0 SB L 2 / 6 7.1 0.0 TR 11 / 15 9.8 0.0 All 9.6 0.0 Intersect. 10.4 SIG/Cinema v3.08 Marvin & Associates Page 2 279 101 92 64 58 76 108 470 35 110 653 420 1 12 04 1 12 04 2 22 24 2 22 24 3 8 04 3 8 04 3 8 04 4 40 24 4 40 24