HomeMy WebLinkAbout22- Task Order MID22-001 - Sanderson Stewart - 5th Avenue Trail Final Design, Bidding and Construction Administration Services for the MURDCity of Bozeman Urban Renewal District Term Contract Task Order Number #MID22-001 PROJECT: 5th Avenue Trail – Final Design, Bidding, and Construction Administration Services for the Midtown Urban Renewal District Issued under the authority of Urban Renewal District Term Contract Professional Services Agreement with Sanderson Stewart for Architectural and Engineering Services. This Task Order is dated September 29, 2022 between the City of Bozeman Economic Development Department and Sanderson Stewart (Contractor). The following representatives have been designated for the work performed under this Task Order: City: David Fine, Urban Renewal Program Manager Contractor: Danielle Scharf, Sanderson Stewart SCOPE OF WORK: The scope for this task order is detailed in the attached City of Bozeman Urban Renewal District Scope of Work – Task Order Number MID22-001. COMPENSATION: Sanderson Stewart will bill for its services on a lump sum basis with a project total of $52,335.00. Sanderson Stewart shall submit invoices to the City of Bozeman for work accomplished during each calendar month. The amount of each monthly invoice shall be determined on the “percentage of completion method” whereby Sanderson Stewart will estimate the percentage of the total work (provided on a lump sum basis) accomplished during the invoicing period. The provisions of the Professional Services Agreement shall govern the Work. IN WITNESS WHEREOF, the parties authorized to commit resources of the parties have executed this Task Order: City of Bozeman Sanderson Stewart Jeff Mihelich, City Manager Danielle Scharf, Principal DocuSign Envelope ID: 757A5C91-6985-49B8-8160-46A246A38FD7 Midtown Urban Renewal District Scope of Work – Task Order No. MID22-001 5th Avenue Trail – Final Design, Bidding, and Construction Administration Services 9/29/22 Sanderson Stewart is pleased to provide this scope of work for final design, bidding and construction administration services for the 5th Avenue Trail project. This work is to be done as a part of the Urban Renewal District term contract for architectural and engineering services. The 5th Avenue Trail was previously designed under a separate task order in 2016. Final design services will be completed under this task order and will include minor modifications to the design in order to coordinate with adjacent projects, finalize the plans for City review and revisions to address City review comments. The scope of work for this task order also includes bidding and construction administration services for the 5th Avenue Trail. A detailed list of assumptions and scope of services for the project are outlined below. Scope of Work: Phase 1 – Project Initiation This phase of the project will include project initiation and planning tasks, including scoping and preparation of the task order. Phase 2 – Final Trail Design This phase of the project will include final design of the 5th Avenue Trail that will address adjustments needed to coordinate with the recently constructed 5th Avenue Sewer project. The segment of trail from Hemlock Street to Oak Street was originally designed along the east side of the right-of-way but will now be redesigned to the west side to overlap with the recently constructed sewer access road. This phase includes an as-built survey of the sewer access road, design revisions for the alignment shift, an Infrastructure Plan submittal to the City of Bozeman Engineering Division, and final revisions to be completed upon receipt of review comments. This phase of the project will also include preparation of the project manual and an updated engineer’s opinion of probable cost. Phase 3 – Construction Bidding This phase of the project will consist of construction bidding services, including the following: DocuSign Envelope ID: 757A5C91-6985-49B8-8160-46A246A38FD7 Page 2 of 3 • Prepare bid advertisement • Contractor coordination throughout bidding, prepare up to two addenda • Facilitate pre-bid meeting, prepare agenda, and distribute minutes • Attend bid opening, prepare bid tabulation and recommendation of award letter • Process contract documents for a single contract (electronic copies) Phase 4 – Construction Administration and Inspection This phase of the project will consist of construction contract administration and construction observation tasks, including the following: • Facilitate pre-construction meeting, prepare agenda, and distribute minutes • Shop drawing review • Construction observation and documentation based on assumed part-time observation for 4 hours each day and a 45-calendar day construction contract. • Respond to Contractor RFI’s • Construction materials testing coordination and review • Process pay applications submitted by Contractor and any necessary work change directives, verify material quantities on all contractor pay requests • Process the Certificate of Substantial Completion, coordinate final inspection, prepare punch lists and verify completion • Prepare as-built (record) drawings • Prepare City of Bozeman close-out submittal • Conduct two-year warranty walkthrough, prepare punch list and verify completion Phase 5 – Construction Staking This phase of the project consists of the construction layout, anticipated to include the following: • Stake demolition limits • Stake subgrade cuts for the trail one time; 25-foot spacing; 2 to 3-foot offset from edge of path • Stake horizontal layout of curb ramps with vertical benchmark for grade one time • Stake culvert locations one time • Stake signs one time • Layout striping one time The following items are specifically excluded from this scope of work: • Material testing (through City term contract) • SWPPP permitting and operation (by contractor) DocuSign Envelope ID: 757A5C91-6985-49B8-8160-46A246A38FD7 Page 3 of 3 Fees and Billing Arrangements: Phase Fee 1. Project Initiation $940 2. Final Trail Design $12,370 3. Construction Bidding $5,730 4. Construction Administration and Inspection $29,555 5. Construction Staking $3,740 Total $52,335 Sanderson Stewart will bill for its services on a lump sum basis with a project total of $52,335. Sanderson Stewart shall submit invoices to the Client for work accomplished during each calendar month. The amount of each monthly invoice shall be determined on the “percentage of completion method” whereby Sanderson Stewart will estimate the percentage of the total work (provided on a lump sum basis) accomplished during the invoicing period. Project Schedule: The anticipated schedule for this project will consist of an infrastructure plan submittal within six weeks of notice to proceed. The remaining schedule will be based on the timing of City review comments, the timeframe required for a public bidding process and the anticipated 45- calendar day construction contract. The final plan set for bidding will be completed within two weeks of receiving City review comments. DocuSign Envelope ID: 757A5C91-6985-49B8-8160-46A246A38FD7