HomeMy WebLinkAbout010_City conversation about Durston ROW Tim Staub From: Taylor Lonsdale <tlonsdale@BOZEMAN.NET> Sent: Thursday, December 2, 2021 10:48 AM To: M Nahorniak; Ross Knapper; Nakeisha Lyon; Lance Lehigh Cc: Tim Staub Subject: RE: Nahorniak Commons - 21034 Attachments: ATT00001.txt;ATT00002.htm Good morning. Lance and I discussed this and have determined that we need 45' of right of way for Durston Rd. We apologize for the delay and appreciate that you understand our situation of being completely overstretched. T2 3/lo� : o°�,s�d�31�, PE I Transportation Engineer City of Bozeman 0: 406.582.2286 pronouns: he\him\his From: M Nahorniak<mnahorniak@chengineers.com> Sent:Thursday, December 2, 20219:37 AM To: Ross Knapper<rknapper@BOZEMAN.NET>;Taylor Lonsdale <tlonsdale@BOZEMAN.NET>; Nakeisha Lyon <nlyon@BOZEMAN.NET>; Lance Lehigh <Ilehigh@BOZEMAN.NET> Cc:Tim Staub<tstaub@chengineers.com> Subject: RE: Nahorniak Commons- 21034 CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good morning all, As the property owner, I just wanted to reach out and hopefully get some direction on this ROW issue so we can finish up the full city site plan submittal and hopefully still be able to start construction this spring/early summer. I completely understand that delays are expected, but we have been at a standstill for 5 weeks as we have waited direction on this single issue. Please advise so we can continue moving forward as efficiently as possible. Thanks, Mark Nahorniak, E.I. www.chengineers.com Uncommon Dedication o Est.2994 I W--LMWII o Civil Engineering o Geotechnical Engineering o Structural Engineering o Floodplain Delineation o Land Surveying o Soil&Concrete Testing Engineering and Surveying Inc. o Subdivision Design o Environmental Site Assessments lost Suxw dge Drre•8ore.nan,MT 59718 o Water System Design o Site Grading&Drainage Plans Phone(406) 1 as•Fat dwesra sws co corn e +atirw t�:r�r ,s,com�infoQ� o Septic System Design o Storm Water Plans(SWPPP) "This message and/or attachment contains confidential information. Distribution of this information must be only to those of C&H Engineering and Surveying, Inc employees or 1 individuals contractually approved to receive this information. If you are not the addressee and/or are not authorized to receive this for the addressee, you must not use, copy, disclose, forward, print or take any action based on this message or any information herein. If you have received this message in error, please advise the sender immediately by reply e-mail and delete this message. " From:Tim Staub<tstaub@chengineers.com> Sent:Wednesday, December 1, 2021 10:04 AM To: Lance Lehigh<Ilehigh@BOZEMAN.NET>; Ross Knapper<rknapper(c@BOZEMAN.NET> Cc: Nakeisha Lyon <nlvon@BOZEMAN.NET>;Taylor Lonsdale<tlonsdale@BOZEMAN.NET>; M Nahorniak <mnahorniak@chengineers.com> Subject: RE: Nahorniak Commons-21034 Hi Lance and Taylor, I am just curious if a determination regarding 45'vs 50' ROW dedication has been made on this Nahorniak Commons Master Site Plan. Thank you, Tim From: Lance Lehigh <Ilehigh@BOZEMAN.NET> Sent:Tuesday, November 16, 2021 9:03 AM To:Tim Staub<tstaub@chengineers.com>; Ross Knapper<rknapper@BOZEMAN.NET> Cc: Nakeisha Lyon <nlvon@BOZEMAN.NET>;Taylor Lonsdale<tlonsdale@BOZEMAN.NET> Subject: RE: Nahorniak Commons-21034 Tim we have looked into this. I want to touch base with Taylor. My biggest issues is the other properties should have dedicated 50 feet vs the 45 feet. I want to confirm with Taylor that we are ok with the 45 for the future road cross section. Sorry, we are trying to fit this in with all of the other reviews in the queue. Lance City of Bozeman 11d1T Lance Lehigh, PE, CFM I Interim City Engineer From:Tim Staub<tstaub@chengineers.com> Sent:Tuesday, November 16, 2021 8:59 AM To: Ross Knapper<rknapper@BOZEMAN.NET>; Lance Lehigh<Ilehigh@BOZEMAN.NET> Cc: Nakeisha Lyon <nlyon@BOZEMAN.NET> Subject: RE: Nahorniak Commons-21034 CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hi Ross, Do you know whether Chris Saunders has had a chance to review the information regarding the additional 5' of ROW requirement at Nahorniak Commons on Durston Road? 2 Thanks, Tim From: Ross Knapper<rl<napper@BOZEMAN.NET> Sent: Monday, November 8, 2021 10:42 AM To:Tim Staub<tstaub(@chengineers.com>; Lance Lehigh <1lehigh@BOZEMAN.NET> Cc: Nakeisha Lyon <nlyon@BOZEMAN.NET> Subject: RE: Nahorniak Commons-21034 Hi Tim, We have forwarded your question about the easement width to Chris Saunders for some additional input. I'm waiting to hear what Chris's comments are before I schedule a meeting. I'll keep you posted. ao p ; Development Review Coordinator, Community Development City of Bozeman 120 East Olive St. I P.O. Box 1230 1 Bozeman, MT 59771 406.582.2968 1 (C) 406.451.6803 1 rknapper(c loozeman.net I www.bozeman.net The City has enhanced our project intake process and will now be receiving all project submittals-New and Revisions, through ProjectDox. As a result of this transition in process, response times to inquiries may be delayed. We understand the impacts any delay may create for your site development and we will make every effort to provide you with the highest level of customer service in a timely manner. We encourage you to review our Development Center webpage and become familiar with the new intake process. Your patience during this transition is greatly appreciated. From:Tim Staub<tstaub@chengineers.com> Sent:Wednesday, November 3, 2021 2:18 PM To: Lance Lehigh<Ilehigh@BOZEMAN.NET> Cc: Nakeisha Lyon <nlyon@BOZEMAN.NET>; Ross Knapper<rknapper@BOZEMAN.NET> Subject: RE: Nahorniak Commons-21034 CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hi Lance, Just following up on this question regarding the Nahorniak Commons project below. Ross,would you be able to help set up a meeting for Lance and I to discuss this? Thank you, Tim Staub From:Tim Staub Sent:Wednesday, October 27, 2021 5:32 PM To: 'Lance Lehigh (Ilehigh(@BOZEMAN.NET)' <Ilehigh@BOZEMAN.NET> Cc: Nakeisha Lyon<nlyon@BOZEMAN.NET> Subject: Nahorniak Commons-21034 3 Hi Lance, I am getting back into the Nahorniak Commons site plan that you reviewed last winter. In your review letter from March 26, 2021 you had a comment on the required width of ROW dedication for Durston as being 50' (item 5 under easements). I am wondering if that can remain 45' as it was dedicated on the attached document number 2226667. For some reason when this property was annexed in 2019, that extra 5' didn't come up and the lot was annexed without it. Also, I have attached the plats of numerous neighboring subdivisions that only dedicated 45'.So if we give 50' we will be an island of 50' ROW in the sea of 45'. So at that point,what is the purpose of the extra 5'? In this particular instance can we keep it 45 feet? Thank you, Tim Staub, P.E. Project Engineer www.chengineers.com Uncommon Dedication o Est.1994 o Civil Engineering o Geotechnical Engineering o Structural Engineering o Floodplain Delineation FCO&- M o Land Surveying o Soil&Concrete Testing Engineering and Surveying Inc. o Subdivision Design o Environmental Site Assessments 1091 Swendgt Onw•Bwef zvu.MT 59718 o Water System Design o Site Grading&Drainage Plans Pbone(406)587-1115•Fax[4061 587.9768 o Septic System Design o Storm Water Plans(SWPPP) •.,eAwcbenPnoer%com•tn1oWcherg,n0frt•cC*11 "This message and/or attachment contains confidential information. Distribution of this information must be only to those of C&H Engineering and Surveying, Inc employees or individuals contractually approved to receive this information. If you are not the addressee and/or are not authorized to receive this for the addressee, you must not use, copy, disclose, forward, print or take any action based on this message or any information herein. If you have received this message in error, please advise the sender immediately by reply e-mail and delete this message. " 4