Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
015 A2.1.3 LEVEL 1 FINISH PLAN
TT T S T TACACAC AC ACACACCR CRCR CRCRCRCR CRCR CRCRCRCR CR CRCR CRESESESES ESESESESESESESES ESESESESESESES ESESESES ESFFFACP FD D D D D D D PB ESDCVBVB VB CCTV 96"LVFWPESES 96" LV ESCR FS FS TS TS TS 5 64 C.1 C B 3 NOT IN SCOPE WAITING 101 STAFF BREAK 124CONSULT 123 CONSULT 122 CORRIDOR 132 PUBLIC TOILET 125 IT 121 MECH 120B LAB 126 STAFF TOILET 119 LAUNDRY 117 CONSULT 102 COMFORT SAFE ROOM 103 PATIENT 104 PATIENT 105 PATIENT 106 PATIENT 107 STORAGE 108 SALLY PORT 109 RESTRAINT ROOM 110 TOILET 111 TOILET 112 VESTIBULE 116 INVOL. PATIENT 113 INVOL. PATIENT 114 CATERING/FOOD PREP 115 CLEAN LINEN 118 DAY ROOM / DINING 129 CORRIDOR 130CORRIDOR 131 A D 7 E MEDS 127 CLINIC STATION 128 ENV 120A SOIL HOLD 117A CNTR-1 CNTR-1 CNTR-1 CNTR-1 CNTR-1 09-0209-02 09-02 A9.3.2 2 A9.3.2 2 A9.3.2 2A9.3.2 2 A9.3.2 2 A9.3.2 2 CNTR-1 09-05 A9.3.2 2 RSF-1 A9.3.2 2 A9.3.2 2 A9.3.2 2 09-05 09-05 09-07 SCALE: 1/4" = 1'-0" 4'3'2'1'4'8'0' NORTH 06-05 09-09 12' - 10 3/4"2' - 7"2' - 6"4' - 2" 09-10 09-11 06-05 09-09 09-10 09-12 09-15 09-14 09-15 06-05 09-05 09-16 09-16 09-16 09-16 9 ' - 0 "10' - 0"10' - 0"6' - 10"8' - 0" 6' - 0" PT-X 09-13 09-14 06-05 09-14 06-05 09-14 06-05 3' - 1 1/2"3' - 6"09-13 09-13 09-18 8' - 10"5' - 0"5 ' - 0 "17' - 0" 11' - 6"30' - 0"4' - 0" 2' - 0" 3' - 0" 2 ' - 6 "1' - 6"1' - 0"1' - 0"09-16 09-1609-16 PT-XPT-X09-1609-16 PT-XPT-X2' - 7" 4' - 6" 09-16 09-16 09-16 09-16 09-16 09-16 09-16 09-16 09-16 09-16 09-16 09-16 09-21TOILET 112A TOILET 112B A5.2.1 15 A5.2.1 13 WORK AREA 128A 12' - 10 3/4" 1' - 4" 4' - 4"2 ' - 6 " 09-13 09-16 09-16 09-16 09-13 09-16 12' - 10 3/4" CNTR-1 CNTR-1 RSF-4 RSF-1 RSF-1RSF-4RSF-1RSF-2 RSF-1RSF-1 RTF-1 RSF-1RSF-1 RSF-1 RSF-1RSF-1 RSF-1 TCPT-5 RSF-1 RSF-1 RSF-1 RSF-1 RSF-1 RSF-1 WOM-1 RSF-3 RSF-1 RSF-2 RSF-1 RSF-2 RSF-1 RSF-2 CT-1 CT-1 CT-1 CT-1 WOM-1 RSF-1 RSF-1 RSF-2 RSF-1CNTR-1 FILM-3 FILM-3 FILM-3 FILM-3 FILM-3 FILM-3 FILM-3 2' - 4"2' - 7"2' - 1"2' - 1" CNTR-1 FILM-3 FILM-3 A9.3.2 2 RSF-1 RSF-2 RSF-1RSF-4 RSF-23' - 6"5' - 3"2' - 6" 1' - 4"1' - 9"4' - 4" RSF-2RSF-4 RSF-4 5' - 3" 2' - 6"3' - 6"1' - 4"1' - 9"1' - 9"4' - 4" 12' - 8 11/16" A9.3.2 9 A9.3.2 9 CT-6 CT-6 RSF-4 HRB-1 TCPT-5 TCPT-2 TCPT-4 TCPT-3 TCPT-2 TCPT-1 A9.3.2 6 A9.3.2 6 4' - 0"1' - 8"1' - 8"1' - 3 3/4"13' - 0" ALIGN ALIGN 1. REFERENCE THE FINISH MATERIAL LEGEND ON SHEET A9.2.1 FOR FINISH SPECIFICATIONS AND ADDITIONAL INFORMATION. 2. REFERENCE THE ROOM FINISH SCHEDULE ON SHEET A9.2.1 FOR ADDITIONAL INFORMATION. 3. REFERENCE THE FLOOR TRANSITION DETAILS ON SHEET A9.3.1 FOR ADDITIONAL INFORMATION. 4. TYPICAL FLOOR COVERING TRANSITION IS AT THE CENTERLINE OF THE DOOR OR AT THE CENTERLINE OF THE OPENING WHERE NO DOOR IS PRESENT, U.N.O. 5. AT ALL CASEWORK NOTED AS "MOBILE" OR "MOVABLE" OR THAT IS NOT ATTACHED TO THE WALL, RUN FLOOR FINISH BELOW, TYP. 6. EXTEND FINISHES BENEATH CASEWORK, TYP. 7. FOR ALL FLOOR TILE, STARTING POINT OF FULL TILE TO OCCUR AT CENTER OF DOOR OPENING, U.N.O. 8. PROVIDE WALK OFF MAT SEAMING DIAGRAM FOR APPROVAL PRIOR TO ORDER. (IF APPLICABLE) FLOOR FINISH PLAN NOTES RSF-1 RSF-2 WOM-1 RESF-1 RTF-1 RSF-4 RESILIENT SHEET FLOORING RESILIENT SHEET FLOORING WALK OFF MAT EPOXY FLOORING RESILIENT TILE FLOORING RESILIENT SHEET FLOORING RESILIENT SHEET FLOORINGRSF-3 FLOOR FINISH LEGEND TANGENT POINT OF CURVE CARPET TILE TCPT-1 CARPET TILE TCPT-2 PADDED FLOORING XX-X CARPET TILE TCPT-4 CARPET TILE TCPT-5 CARPET TILE TCPT-3 issue date project # phasesheet projectownerrevision dateaddress PERMIT SET8/29/2022 5:31:37 PMA2.1.3 08/29/2022LEVEL 1 FINISH PLAN22006.00 PERMIT SETSPANISH PEAKSCONNECTIONS HEALTH SOLUTIONS120 19TH AVE. SUITE HBOZEMAN, MONTANA 597181/4" = 1'-0"13 LEVEL 1 - FINISH KEYNOTES 06-05 PROVIDE MDF OR PLYWOOD TEMPLATE TO LAYOUT CURVED GYPSUM BOARD CEILING AND FLOORING IN ROOM; NOTE WORK POINT OF TEMPLATE SPECIFIED; BEGIN ALL CURVED SEGMENTS AT TANGENT POINTS OF ADJACENT CURB. CONTACT ARCHITECT FOR .DXF FILE REQUEST IF NEEDED. 09-02 18"D HEAVY DUTY STAINLESS STEEL WIRE ADJUSTABLE SHELVING WITH 1" STAINLESS STEEL LIP. PROVIDE HEAVY DUTY STAINLESS STEEL STANDARDS AT 32" O.C. MAX. LOCATE AT STUD OR ADD BLOCKING AS NEEDED PRIOR TO SHELF INSTALLATION. 09-05 EXTEND FLOORING MATERIAL AND PATTERN UNDER TOE KICK PRIOR TO CABINET INSTALLATION, TYPICAL. 09-07 INSTALL 3/8" OSB SUBFLOORING OVER EXISTING PLYWOOD. PREP TO RECEIVE PADDED VENDOR INSTALL FLOORING, OFOI 09-09 INSTALL GBI-1 ENTIRE PERIMETER OF ROOM 09-10 EXTENT OF TEMPLATE IN PATIENT ROOM 105 SHOWN DASHED 09-11 PROVIDE ADDITIONAL TEMPLATE FOR CONTINUATION OF FLOORING PATTERN EXTENSION 09-12 EXTEND FLOORING WITH TANGENT LINE TO WALL PAST TEMPLATE. FLOOR WORK POINT BASED ON END OF TEMPLATE SHOWN WITH DASHED LINE 09-13 FLOOR LAYOUT WORK POINT 09-14 FLOOR LAYOUT AND WORK POINT MIRROR IMAGE OF PATIENT 105 LAYOUT 09-15 FLOOR LAYOUT AND WORK POINT TO MATCH PATIENT 105 LAYOUT; CUT LAYOUT AS NEEDED FOR NARROWER ROOM 09-16 WALL PAINT COLOR TRANSITON LOCATION TO ALIGN WITH FLOOR PATTERN TERMINATION. EXTEND PAINT TRANSITION LINE TO CEILING'S COVE LIGHT, SEE RCP FOR EXACT LOCATION. 09-18 FLOOR LAYOUT AND WORK POINT TO MATCH PATIENT 114 LAYOUT 09-21 1" PROTECTIVE PADDING MATERIAL TO BE APPLIED ON ALL WALLS AND CEILING IN RESTRAINT ROOM, 3/8" OSB SUBSTRATE AS REQ. BY VENDOR, OFOI