Loading...
HomeMy WebLinkAbout011 D4.1.1 EXTERIOR ELEVATION DEMOLITIONLEVEL 1 100' -0" ROOF 111' -1" 5 643 7 02-21 02-2102-2102-21 DEMO EXISTING SIGN, PATCH ALL OPENINGS AND PREPARE TO RECEIVE NEW E.I.F.S FINISH TO BLEND PATCHED SURFACES WITH EXISTING SURFACE 02-21 02-18 LEVEL 1 100' -0" ROOF 111' -1" 56 4 37 02-20 02-19 26-01 02-07 02-0402-04 02-1802-25 EXISTING RTU TO BE RELOCATED SHOWN DASHED EXISTING RTU TO BE RELOCATED SHOWN DASHED LEVEL 1 100' -0" ROOF 111' -1" C.1 C B ADE 5' - 0"6' - 0"02-18 02-19 02-20 DEMO EXISTING SIGN, PATCH ALL OPENINGS AND PREPARE TO RECEIVE NEW E.I.F.S FINISH TO BLEND PATCHED SURFACES WITH EXISTING SURFACE 02-10 02-10 02-10 02-23 02-24 02-24 02-23 EXISTING RTU TO BE RELOCATED SHOWN DASHED issue date project # phasesheet projectownerrevision dateaddress PERMIT SET8/29/2022 5:33:36 PMD4.1.1 08/29/2022EXTERIOR ELEVATION DEMOLITION22006.00 PERMIT SETSPANISH PEAKSCONNECTIONS HEALTH SOLUTIONS120 19TH AVE. SUITE HBOZEMAN, MONTANA 597181/4" = 1'-0"9 PARTIAL WEST ELEVATION - DEMOLITION 1/4" = 1'-0"1 PARTIAL EAST ELEVATION - DEMOLITION 1/4" = 1'-0"13 SOUTH ELEVATION DEMOLITION 02-04 CAREFULLY REMOVE DOOR AND HARDWARE, STORE IN NON-TRAFFICKED AREA, AND HOLD FOR OWNER'S COORDINATED REMOVAL 02-07 EXISTING ROOF ACCESS, EXTERIOR LADDER; CONTRACTOR TO MAINTAIN LOCKED AND SECURED ACCESS AT ALL TIMES; COORDINATE WITH BOZEMAN HEALTH FOR MAINTENANCE OF UNITS DURING CONSTRUCTION WORK. 02-10 LOCATION OF NEW STOREFRONT WINDOWS TO BE INSTALLED, DEMO PORTION OF WALL AS REQUIRED FOR INSTALLATION; SEE NEW ELEVATIONS, SECTIONS, AND DETAILS. 02-18 DEMO EXISTING EXTERIOR STOREFRONT WINDOW AND / OR DOOR IN ITS ENTIRETY; PREPARE TO RECEIVE NEW EXTERIOR ENVELOPE CONSTRUCTION 02-19 DEMO PORTION OF EXISTING WALL, BRACE AND SUPPORT AS REQUIRED TO INSTALL STRUCTURAL REINFORCEMENT TO SUPPORT NEW WINDOW CONFIGURATION; EXTENT OF DEMOLITION WORK SHOWN DASHED. 02-20 EXISTING WALL TO INFRASTRUCTURE TO REMAIN. CONTRACTOR TO PATCH DAMAGED E.I.F.S. AS REQUIRED TO MATCH EXISTING TEXTURE, PREPARE TO RE-APPLY E.I.F.S. SURFACE TO MATCH EXISTING COLORS. 02-21 REMOVE EXISTING INSULATING GLAZING, REPLACE WITH NEW INSULATED SPANDREL PANEL, SEE PROPOSED ELEVATIONS 02-23 REMOVE E.I.F.S. PILASTER FROM COPING TO BASE; PATCH ABOVE AND BELOW WALL RECESS TO BE FLUSH WITH ADJACENT SURFACES; BLEND NEW NEXTURE TO MATCH EXISTING 02-24 PAINT E.I.F.S. BETWEEN PILASTERS CORNERS BELOW AND ABOVE RECESSED WALL; MATCH EXISTING COLORS AT WEST ELEVATION 02-25 DEMO EXISTING STOREFRONT WINDOW AND PREPARE TO RECEIVE NEW MATERIAL TO MATCH EXISTING 26-01 EXTERIOR LIGHT PACK, CENTER ABOVE DOOR, SEE ELCTRICAL DRAWINGS KEY NOTES