HomeMy WebLinkAbout011 D4.1.1 EXTERIOR ELEVATION DEMOLITIONLEVEL 1
100' -0"
ROOF
111' -1"
5 643 7
02-21 02-2102-2102-21
DEMO EXISTING SIGN, PATCH ALL
OPENINGS AND PREPARE TO RECEIVE
NEW E.I.F.S FINISH TO BLEND PATCHED
SURFACES WITH EXISTING SURFACE
02-21 02-18
LEVEL 1
100' -0"
ROOF
111' -1"
56 4 37
02-20
02-19
26-01
02-07
02-0402-04 02-1802-25
EXISTING RTU TO BE RELOCATED
SHOWN DASHED
EXISTING RTU TO BE RELOCATED
SHOWN DASHED
LEVEL 1
100' -0"
ROOF
111' -1"
C.1 C B ADE
5' - 0"6' - 0"02-18
02-19
02-20
DEMO EXISTING SIGN, PATCH ALL
OPENINGS AND PREPARE TO RECEIVE
NEW E.I.F.S FINISH TO BLEND PATCHED
SURFACES WITH EXISTING SURFACE
02-10 02-10
02-10
02-23
02-24
02-24
02-23
EXISTING RTU TO BE
RELOCATED SHOWN DASHED
issue date
project #
phasesheet projectownerrevision dateaddress
PERMIT SET8/29/2022 5:33:36 PMD4.1.1
08/29/2022EXTERIOR ELEVATION DEMOLITION22006.00
PERMIT SETSPANISH PEAKSCONNECTIONS HEALTH SOLUTIONS120 19TH AVE. SUITE HBOZEMAN, MONTANA 597181/4" = 1'-0"9 PARTIAL WEST ELEVATION - DEMOLITION
1/4" = 1'-0"1 PARTIAL EAST ELEVATION - DEMOLITION
1/4" = 1'-0"13 SOUTH ELEVATION DEMOLITION
02-04 CAREFULLY REMOVE DOOR AND HARDWARE, STORE IN NON-TRAFFICKED AREA, AND HOLD
FOR OWNER'S COORDINATED REMOVAL
02-07 EXISTING ROOF ACCESS, EXTERIOR LADDER; CONTRACTOR TO MAINTAIN LOCKED AND
SECURED ACCESS AT ALL TIMES; COORDINATE WITH BOZEMAN HEALTH FOR MAINTENANCE
OF UNITS DURING CONSTRUCTION WORK.
02-10 LOCATION OF NEW STOREFRONT WINDOWS TO BE INSTALLED, DEMO PORTION OF WALL AS
REQUIRED FOR INSTALLATION; SEE NEW ELEVATIONS, SECTIONS, AND DETAILS.
02-18 DEMO EXISTING EXTERIOR STOREFRONT WINDOW AND / OR DOOR IN ITS ENTIRETY;
PREPARE TO RECEIVE NEW EXTERIOR ENVELOPE CONSTRUCTION
02-19 DEMO PORTION OF EXISTING WALL, BRACE AND SUPPORT AS REQUIRED TO INSTALL
STRUCTURAL REINFORCEMENT TO SUPPORT NEW WINDOW CONFIGURATION; EXTENT OF
DEMOLITION WORK SHOWN DASHED.
02-20 EXISTING WALL TO INFRASTRUCTURE TO REMAIN. CONTRACTOR TO PATCH DAMAGED
E.I.F.S. AS REQUIRED TO MATCH EXISTING TEXTURE, PREPARE TO RE-APPLY E.I.F.S.
SURFACE TO MATCH EXISTING COLORS.
02-21 REMOVE EXISTING INSULATING GLAZING, REPLACE WITH NEW INSULATED SPANDREL
PANEL, SEE PROPOSED ELEVATIONS
02-23 REMOVE E.I.F.S. PILASTER FROM COPING TO BASE; PATCH ABOVE AND BELOW WALL
RECESS TO BE FLUSH WITH ADJACENT SURFACES; BLEND NEW NEXTURE TO MATCH
EXISTING
02-24 PAINT E.I.F.S. BETWEEN PILASTERS CORNERS BELOW AND ABOVE RECESSED WALL; MATCH
EXISTING COLORS AT WEST ELEVATION
02-25 DEMO EXISTING STOREFRONT WINDOW AND PREPARE TO RECEIVE NEW MATERIAL TO
MATCH EXISTING
26-01 EXTERIOR LIGHT PACK, CENTER ABOVE DOOR, SEE ELCTRICAL DRAWINGS
KEY NOTES