HomeMy WebLinkAbout010 D2.1.1 LEVEL 1 DEMOLITION PLANAC ACACACAC ACACFACJ JJ F J NCMN AC N44"ACACN44"FAC ACAC ACAC NN44" DFACP FFF1. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FAMILIARIZE HIMSELF/ HERSELF WITH THE SCOPE OF WORK. 2. THE DEMOLITION NOTES PROVIDE A GENERAL DESCRIPTION OF THE ITEMS AND AREAS REQUIRING REMOVAL. THE CONTRACTOR SHALL FIELD VERIFY ACTUAL QUANTITIES AND LOCATIONS OF ALL INDICATED ITEMS AS NECESSARY TO COMPLETE THE SCOPE OF WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. 3. COORDINATE WITH OWNER FOR ANY EQUIPMENT TO BE SALVAGED. UNLESS SPECIFICALLY SCHEDULED FOR REUSE, DEMOLISHED MATERIALS SHALL BECOME THE POSSESSION OF THE CONTRACTOR AND SHALL BE IMMEDIATELY REMOVED FROM THE SITE. 4. REMOVE MATERIALS FROM SITE AND DISPOSE OF IN A LEGAL MANNER AT NO ADDITIONAL EXPENSE TO OWNER 5. DEBRIS FROM THE DEMOLITION SHALL NOT BE ALLOWED TO ACCUMULATE WITHIN THE BUILDING OR ON THE SITE. 6. REMOVE FROM SITE ANY CONTAMINATED, VERMIN INFESTED, OR DANGEROUS MATERIALS ENCOUNTERED AND DISPOSE OF BY SAFE MEANS SO AS NOT TO ENDANGER HEALTH OF WORKERS AND PUBLIC. 7. BURNING OF MATERIALS ON SITE IS NOT PERMITTED. 8. CLEAN-UP: MUST MEET GOVERNING DUST CONTROL CODES. 9. NOTIFY AFFECTED UTILITY COMPANIES BEFORE STARTING WORK AND COMPLY WITH THEIR REQUIREMENTS. 10. PREVENT MOVEMENT OR SETTLEMENT OF ADJACENT STRUCTURES. PROVIDE BRACING AND SHORING. 11. CARRY OUT DEMOLITION WORK TO CAUSE AS LITTLE INCONVENIENCE TO ANY ADJACENT OCCUPIED BUILDING OR SITE AS POSSIBLE AND WITH MINIMUM INTERFERENCE TO PUBLIC OR PRIVATE ACCESSES. MAINTAIN PROTECTED EGRESS AND ACCESS AT ALL TIMES. 12. CONTRACTOR SHALL PROVIDE TEMPORARY DUST AND CONSTRUCTION SEPARATION WALLS AS REQUIRED TO SHIELD THE PUBLIC FROM NOISE, DUST, WEATHER, AND OTHER HAZARDS THAT MAY BE EXPOSED AS A RESULT OF THE DEMOLITION WORK. 13. PERFORM CUTTING OF EXISTING CONCRETE AND MASONRY WITH SAWS AND CORE DRILLS. DO NOT USE JACK-HAMMERS EXCEPT WHERE PERMITTED BY OWNER. 14. BREAK CONCRETE AND MASONRY INTO SECTIONS LESS THAN 3 FEET IN ANY DIMENSION. 15. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO INSURE EXISTING STRUCTURAL ELEMENTS REMAIN UNDAMAGED THROUGHOUT CONSTRUCTION, UNLESS SPECIFICALLY NOTED ON DEMOLITION PLAN. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO IDENTIFY AND PROVIDE ANY SHORING, BRACING, OR TEMPORARY STRUCTURE, AND TO COORDINATE WITH STRUCTURAL ENGINEER AS REQUIRED. 16. ALL PUBLIC UTILITIES TO REMAIN IN OPERATION THROUGHOUT CONSTRUCTION. CONTRACTOR TO COORDINATE ANY TEMPORARY SERVICES REQUIRED TO MAINTAIN BUSINESS OPERATIONS. 17. SEE ENGINEERING DRAWINGS FOR DUCTWORK, DIFFUSER, PLENUM BOX, ETC. DEMOLITION AND/OR PROTECTION. COORDINATE WITH MECHANICAL ENGINEER. 18. FIRE SAFETY MUST BE MAINTAINED FOR ALL PERSONNEL WORKING ON THE FLOOR. ALL FIRE STAIRS, ALARMS, SPEAKERS, ETC. MUST REMAIN ACCESSIBLE AND OPERABLE AT ALL TIMES. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO PROTECT THIS EQUIPMENT. IMMEDIATELY NOTIFY BUILDING SECURITY AND BUILDING MANAGER OF DAMAGED OR DISABLED SYSTEMS AND REPAIR OR REPLACE DAMAGED SYSTEMS IMMEDIATELY. RELOCATION OF SMOKE DETECTORS, PUBLIC ADDRESS SPEAKERS AND FIRE ALARM EQUIPMENT, NECESSITATED BY NEW CONSTRUCTION, SHALL BE ACCOMPLISHED AS A FIRST PRIORITY, AND PER THE PLANS. 19. IF ANY QUESTIONS ARISE AS TO THE REMOVAL OF ANY MATERIAL, CLARIFY THE POINT IN QUESTION WITH THE OWNER BEFORE PROCEEDING. IMMEDIATELY STOP WORK IF HAZARDOUS MATERIALS ARE FOUND AND CONTACT THE OWNER'S REPRESENTATIVE. 20. REMOVAL OF ANY EQUIPMENT, CABLING SWITCHES, AND CONDUIT PERTAINING TO DATA/COMMUNICATIONS AND TELEPHONE SHALL BE VERIFIED WITH TELEPHONE COMPANIES, SERVICE OWNER OR TENANT DATA/COMMUNICATIONS REPRESENTATIVE AS REQUIRED TO PREVENT NEW CONSTRUCTION DELAYS. 21. PROVIDE FOR FIRE PROOFING REPAIR AS REQUIRED AT STRUCTURAL STEEL, TO THE ORIGINAL RATING WHERE CONSTRUCTION TRADES REMOVE EXISTING FIRE PROOFING. REPAIR ANY DAMAGE OR PENETRATIONS IN RATED ASSEMBLIES TO CONFORM TO THEIR ORIGINAL LISTING REQUIREMENTS AND TO MAINTAIN FIRE PROTECTION AND SEPARATION AS ORIGINALLY DESIGNED. 22. AT COMPLETION OF DEMOLITION WORK, THE CONSTRUCTION AREA(S) SHALL BE LEFT IN "BROOM CLEAN" CONDITION. ALL DEBRIS AND MISCELLANEOUS MATERIAL SHALL BE REMOVED. 23. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND/OR REPAIRING ANY DAMAGE CAUSED BY HIM OR HIS SUBCONTRACTORS. REFINISH TO MATCH EXISTING ADJACENT FINISH, OR AS NOTED HEREIN. 24. FOR AREAS NOT IN DEMOLITION SCOPE OF WORK, PROTECT AS REQUIRED, ALL SURFACES, EQUIPMENT, FIXTURES AND HARDWARE DURING DEMOLITION AND/OR CONSTRUCTION. 25. PRIOR TO DEMOLITION, INVESTIGATE WALLS FOR CONCEALED PIPING AND INFORM OWNER/ARCHITECT OF ANY CONDITION NOT DOCUMENTED IN CONTRACT DRAWINGS. DEMO DESIGNATED WALL BASES, WALL FRAMING, BATT INSULATION AND GYPSUM BOARD. DEMO CONDUITS AND RECEPTACLES, REFERENCE ELECTRICAL DEMO PLAN FOR ADDITIONAL INFORMATION. 26. ALL EXISTING DIRECTIONAL SIGNAGE TO BE REMOVED UNLESS NOTED OTHERWISE. 27. WHERE NOTED, REMOVE FLOORING DOWN TO TOP OF CONC. SLAB, INCLUDING ADHESIVES, TRANSITION STRIPS, AND OTHER ASSOCIATED ELEMENTS, TYP., UNLESS NOTED OTHERWISE. PREPARE REMAINING SURFACES TO RECEIVE NEW FINISHES. DEMOLITION NOTES SHADED INDICATES AREA NOT IN SCOPE OF WORK, UNLESS KEY NOTED OTHERWISE DEMOLITION WORK PACKAGE 2 SHOWN HATCHED INDICATES BUILT ITEM TO BE REMOVED DEMOLITION LEGEND 5 64 C.1 C B 3 A D 7 E 02-01 02-04 02-04 02-04 02-04 02-04 02-04 02-04 02-04 02-04 02-04 02-04 02-04 02-01 02-06 02-02 02-04 02-0402-0702-18 02-18 02-04 02-0402-04 02-04 02-04 02-04 02-02 02-09 02-09 13-02 13-02 09-01 09-01 1A-3 1A-3 02-02 EXISTING TENANT SPACE SHOWN GRAY, NO WORK, OTHER THAN INFECTION PREVENTION NOTED AND INSTALLATION OF FIRE SUPPRESSION SYSTEM 3' - 11"02-12 02-12 02-13 02-13 02-13 02-13 02-13 02-13 02-14 02-173' - 6"SCALE: 1/4" = 1'-0" 4'3'2'1'4'8'0' NORTH 02-22 02-22 02-22 02-1802-16 02-09 09-22 09-2213-03 13-03 RESTRAINT ROOM AREA SHOWN IN GRAY; CONTRACTOR TO DEMOLISH ALL ITEMS FROM FLOOR TO CEILING TO PREPARE AREA TO RECEIVE NEW WORK A3.3.1 1 02-03 02-03 02-03 PREPARE FOR INSTALLATION OF CARD READER, REPAIR AFTER WORK IS COMPLETED PREPARE FOR INSTALLATION OF CARD READER, REPAIR AFTER WORK IS COMPLETED 02-18 issue date project # phasesheet projectownerrevision dateaddress PERMIT SET8/29/2022 5:33:33 PMD2.1.1 08/29/2022LEVEL 1 DEMOLITION PLAN22006.00 PERMIT SETSPANISH PEAKSCONNECTIONS HEALTH SOLUTIONS120 19TH AVE. SUITE HBOZEMAN, MONTANA 5971802-01 ELECTRICAL PANELS TO REMAIN OPERATIONAL THROUGHOUT DEMOLITION WORK; CONTRACTOR TO PROVIDE TEMPORARY SUPPORT BY TO PANELS AND FEEDING CONDUIT BY BRACING PORTION OF NOTED DEMO WALL TO REMAIN IN PLACE. CONTACT ARCHITECT IF UNFORSEEN CIRCUMSTANCES ARE ENCOUNTERED. 02-02 DEMO ALL PLUMBING WASTE LINES TO UNDERSIDE OF FLOOR. CAP AND SEAL IN EXISTING CRAWL SPACE 02-03 DEMO EXISTING GYPSUM BOARD AS REQUIRED FOR INSTALLATION OF STRUCTURAL ELEMENTS AND STOREFRONT INSTALLATION, REPAIR WALL AND PREPARE INSTALL OF NEW MATERIAL OVER EXISTING. 02-04 CAREFULLY REMOVE DOOR AND HARDWARE, STORE IN NON-TRAFFICKED AREA, AND HOLD FOR OWNER'S COORDINATED REMOVAL 02-06 EXISTING CRAWL SPACE ACCESS. PROTECT HATCH STRUCTURE DURING THIS WORK. PREPARE HATCH TO RECEIVE NEW SCHEDULED FINISHES. 02-07 EXISTING ROOF ACCESS, EXTERIOR LADDER; CONTRACTOR TO MAINTAIN LOCKED AND SECURED ACCESS AT ALL TIMES; COORDINATE WITH BOZEMAN HEALTH FOR MAINTENANCE OF UNITS DURING CONSTRUCTION WORK. 02-09 CAREFULLY REMOVE INTERIOR WINDOW, STORE IN NON-TRAFFICKED AREA, AND HOLD FOR OWNER'S COORDINATED REMOVAL 02-12 DEMO EXISTING WALL SUPPORTING ELECTRICAL PANEL, SEE ELECTRICAL DRAWINGS FOR BALANCE OF WORK. 02-13 DEMO EXISTING WALL IN ITS ENTIRETY, INCLUDING ALL WALL MOUNTED DEVICES, CONDUITS, AND PIPES TO NEAREST TERMINATION POINT; COORDINATE WITH MEP DRAWINGS 02-14 DEMO EXISTING BASE AND WALL CABINETS, AND COUNTERTOPS IN THEIR ENTIRETY 02-16 DEMO EXISTING WALL FOR OPENING INSTALLATION; PREPARE TO RECEIVE NEW FINISHES 02-17 DEMO EXTERIOR CONCRETE SLAB, EXCAVATE TO EXISTING TOP OF FOOTING; PREPARE TO RECEIVE NEW CONCRETE FOUNDATION TO BELOW FROST LINE; COORDINATE EXTENT OF DEMO AND NEW WORK WITH CIVIL DRAWINGS 02-18 DEMO EXISTING EXTERIOR STOREFRONT WINDOW AND / OR DOOR IN ITS ENTIRETY; PREPARE TO RECEIVE NEW EXTERIOR ENVELOPE CONSTRUCTION 02-22 DEMO EXISTING GYPSUM BOARD FROM EXISTING WALL; SEAL GYPSUM BOARD OPENINGS THROUGHOUT WITH FIRE RATED SYSTEM BASED ON OPENING ENCOUNTERED TO CONVERT EXISTING WALL TO UL DES U465, INCLUDING ADDING FIRE PROTECTION AT EXITING OUTLETS. EXTEND WALL TO UNDERSIDE OF STRUCTURE WHERE NEEDED AND SEAL. INSTALL NEW GYPSUM BOARD AND PREPARE FOR NEW FINISHES. 09-01 PAINT AND FINISH, INCLUDING BASE TO MATCH EXISTING ADJACENT WALLS, AT COMPLETION OF PERMANENT WALL. 09-22 INSTALL 1-HOUR FIRE RATED WALL PRIOR TO COMMENCEMENT OF DEMOLITION WORK, SEALED FROM FLOOR TO UNDERSIDE OF EXISTING ROOF; SEE WALL ASSEMBLY TYPES; CONNECT AND CONTINUE RATED WALLS BETWEEN EXISTING WALLS AND NEW WALLS TO MAINTAIN A CONTINUOUS RATED ASSEMBLY FOR EAST TO WEST OF BUILDING. 13-02 PROVIDE TWO STACKS OF TACK MATTS AT ACCESS POINT TO INFECTION PREVENTION BARRIER; COORDINATE WITH BOZEMAN HEALTH'S PROTOCOLS 13-03 TEMPORARILY EXTEND TOP OF EXISTING WALL TO UNDERSIDE OF EXISTING STRUCTURE WITH 6MM FIRE RATED PLASTIC BARRIER, SEAL AS REQUIRED TO MAINTAIN NEGATIVE PRESSURE WITHIN CONSTRUCTION ZONE. PROVIDE ZIPPED OPENING IN PLASTIC. KEYNOTES 1/4" = 1'-0"13 LEVEL 1 DEMOLITION PLAN