FFF1. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FAMILIARIZE HIMSELF/ HERSELF WITH THE SCOPE OF WORK.
2. THE DEMOLITION NOTES PROVIDE A GENERAL DESCRIPTION OF THE ITEMS AND AREAS REQUIRING
REMOVAL. THE CONTRACTOR SHALL FIELD VERIFY ACTUAL QUANTITIES AND LOCATIONS OF ALL INDICATED
ITEMS AS NECESSARY TO COMPLETE THE SCOPE OF WORK IN ACCORDANCE WITH THE CONTRACT
DOCUMENTS.
3. COORDINATE WITH OWNER FOR ANY EQUIPMENT TO BE SALVAGED. UNLESS SPECIFICALLY SCHEDULED
FOR REUSE, DEMOLISHED MATERIALS SHALL BECOME THE POSSESSION OF THE CONTRACTOR AND SHALL
BE IMMEDIATELY REMOVED FROM THE SITE.
4. REMOVE MATERIALS FROM SITE AND DISPOSE OF IN A LEGAL MANNER AT NO ADDITIONAL EXPENSE TO
OWNER
5. DEBRIS FROM THE DEMOLITION SHALL NOT BE ALLOWED TO ACCUMULATE WITHIN THE BUILDING OR ON THE
SITE.
6. REMOVE FROM SITE ANY CONTAMINATED, VERMIN INFESTED, OR DANGEROUS MATERIALS ENCOUNTERED
AND DISPOSE OF BY SAFE MEANS SO AS NOT TO ENDANGER HEALTH OF WORKERS AND PUBLIC.
7. BURNING OF MATERIALS ON SITE IS NOT PERMITTED.
8. CLEAN-UP: MUST MEET GOVERNING DUST CONTROL CODES.
9. NOTIFY AFFECTED UTILITY COMPANIES BEFORE STARTING WORK AND COMPLY WITH THEIR
REQUIREMENTS.
10. PREVENT MOVEMENT OR SETTLEMENT OF ADJACENT STRUCTURES. PROVIDE BRACING AND SHORING.
11. CARRY OUT DEMOLITION WORK TO CAUSE AS LITTLE INCONVENIENCE TO ANY ADJACENT OCCUPIED
BUILDING OR SITE AS POSSIBLE AND WITH MINIMUM INTERFERENCE TO PUBLIC OR PRIVATE ACCESSES.
MAINTAIN PROTECTED EGRESS AND ACCESS AT ALL TIMES.
12. CONTRACTOR SHALL PROVIDE TEMPORARY DUST AND CONSTRUCTION SEPARATION WALLS AS REQUIRED
TO SHIELD THE PUBLIC FROM NOISE, DUST, WEATHER, AND OTHER HAZARDS THAT MAY BE EXPOSED AS A
RESULT OF THE DEMOLITION WORK.
13. PERFORM CUTTING OF EXISTING CONCRETE AND MASONRY WITH SAWS AND CORE DRILLS. DO NOT USE
JACK-HAMMERS EXCEPT WHERE PERMITTED BY OWNER.
14. BREAK CONCRETE AND MASONRY INTO SECTIONS LESS THAN 3 FEET IN ANY DIMENSION.
15. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO INSURE EXISTING STRUCTURAL ELEMENTS
REMAIN UNDAMAGED THROUGHOUT CONSTRUCTION, UNLESS SPECIFICALLY NOTED ON DEMOLITION PLAN.
IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO IDENTIFY AND PROVIDE ANY SHORING, BRACING,
OR TEMPORARY STRUCTURE, AND TO COORDINATE WITH STRUCTURAL ENGINEER AS REQUIRED.
16. ALL PUBLIC UTILITIES TO REMAIN IN OPERATION THROUGHOUT CONSTRUCTION. CONTRACTOR TO
COORDINATE ANY TEMPORARY SERVICES REQUIRED TO MAINTAIN BUSINESS OPERATIONS.
17. SEE ENGINEERING DRAWINGS FOR DUCTWORK, DIFFUSER, PLENUM BOX, ETC. DEMOLITION AND/OR
PROTECTION. COORDINATE WITH MECHANICAL ENGINEER.
18. FIRE SAFETY MUST BE MAINTAINED FOR ALL PERSONNEL WORKING ON THE FLOOR. ALL FIRE STAIRS,
ALARMS, SPEAKERS, ETC. MUST REMAIN ACCESSIBLE AND OPERABLE AT ALL TIMES. CONTRACTOR SHALL
MAKE NECESSARY PROVISIONS TO PROTECT THIS EQUIPMENT. IMMEDIATELY NOTIFY BUILDING SECURITY
AND BUILDING MANAGER OF DAMAGED OR DISABLED SYSTEMS AND REPAIR OR REPLACE DAMAGED
SYSTEMS IMMEDIATELY. RELOCATION OF SMOKE DETECTORS, PUBLIC ADDRESS SPEAKERS AND FIRE
ALARM EQUIPMENT, NECESSITATED BY NEW CONSTRUCTION, SHALL BE ACCOMPLISHED AS A FIRST
PRIORITY, AND PER THE PLANS.
19. IF ANY QUESTIONS ARISE AS TO THE REMOVAL OF ANY MATERIAL, CLARIFY THE POINT IN QUESTION WITH
THE OWNER BEFORE PROCEEDING. IMMEDIATELY STOP WORK IF HAZARDOUS MATERIALS ARE FOUND AND
CONTACT THE OWNER'S REPRESENTATIVE.
20. REMOVAL OF ANY EQUIPMENT, CABLING SWITCHES, AND CONDUIT PERTAINING TO
DATA/COMMUNICATIONS AND TELEPHONE SHALL BE VERIFIED WITH TELEPHONE COMPANIES, SERVICE
OWNER OR TENANT DATA/COMMUNICATIONS REPRESENTATIVE AS REQUIRED TO PREVENT NEW
CONSTRUCTION DELAYS.
21. PROVIDE FOR FIRE PROOFING REPAIR AS REQUIRED AT STRUCTURAL STEEL, TO THE ORIGINAL RATING
WHERE CONSTRUCTION TRADES REMOVE EXISTING FIRE PROOFING. REPAIR ANY DAMAGE OR
PENETRATIONS IN RATED ASSEMBLIES TO CONFORM TO THEIR ORIGINAL LISTING REQUIREMENTS AND
TO MAINTAIN FIRE PROTECTION AND SEPARATION AS ORIGINALLY DESIGNED.
22. AT COMPLETION OF DEMOLITION WORK, THE CONSTRUCTION AREA(S) SHALL BE LEFT IN "BROOM CLEAN"
CONDITION. ALL DEBRIS AND MISCELLANEOUS MATERIAL SHALL BE REMOVED.
23. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND/OR REPAIRING ANY DAMAGE CAUSED BY HIM
OR HIS SUBCONTRACTORS. REFINISH TO MATCH EXISTING ADJACENT FINISH, OR AS NOTED HEREIN.
24. FOR AREAS NOT IN DEMOLITION SCOPE OF WORK, PROTECT AS REQUIRED, ALL SURFACES, EQUIPMENT,
FIXTURES AND HARDWARE DURING DEMOLITION AND/OR CONSTRUCTION.
25. PRIOR TO DEMOLITION, INVESTIGATE WALLS FOR CONCEALED PIPING AND INFORM OWNER/ARCHITECT
OF ANY CONDITION NOT DOCUMENTED IN CONTRACT DRAWINGS. DEMO DESIGNATED WALL BASES, WALL
FRAMING, BATT INSULATION AND GYPSUM BOARD. DEMO CONDUITS AND RECEPTACLES, REFERENCE
ELECTRICAL DEMO PLAN FOR ADDITIONAL INFORMATION.
26. ALL EXISTING DIRECTIONAL SIGNAGE TO BE REMOVED UNLESS NOTED OTHERWISE.
27. WHERE NOTED, REMOVE FLOORING DOWN TO TOP OF CONC. SLAB, INCLUDING ADHESIVES, TRANSITION
STRIPS, AND OTHER ASSOCIATED ELEMENTS, TYP., UNLESS NOTED OTHERWISE. PREPARE REMAINING
SURFACES TO RECEIVE NEW FINISHES.
DEMOLITION NOTES
SHADED INDICATES AREA NOT IN SCOPE OF
WORK, UNLESS KEY NOTED OTHERWISE
DEMOLITION WORK PACKAGE 2 SHOWN HATCHED
INDICATES BUILT ITEM TO BE REMOVED
DEMOLITION LEGEND
5 64
C.1
C
B
3
A
D
7
E
02-01
02-04 02-04
02-04
02-04
02-04
02-04
02-04
02-04
02-04
02-04
02-04
02-04
02-01
02-06
02-02
02-04
02-0402-0702-18
02-18
02-04
02-0402-04
02-04
02-04
02-04
02-02
02-09
02-09
13-02
13-02
09-01
09-01
1A-3
1A-3
02-02
EXISTING TENANT SPACE
SHOWN GRAY, NO WORK,
OTHER THAN INFECTION
PREVENTION NOTED AND
INSTALLATION OF FIRE
SUPPRESSION SYSTEM
3' - 11"02-12
02-12
02-13
02-13
02-13
02-13
02-13
02-13
02-14
02-173' - 6"SCALE: 1/4" = 1'-0"
4'3'2'1'4'8'0'
NORTH
02-22
02-22
02-22
02-1802-16
02-09
09-22
09-2213-03
13-03
RESTRAINT ROOM AREA SHOWN IN
GRAY; CONTRACTOR TO DEMOLISH
ALL ITEMS FROM FLOOR TO CEILING
TO PREPARE AREA TO RECEIVE
NEW WORK
A3.3.1
1
02-03
02-03
02-03
PREPARE FOR INSTALLATION OF CARD
READER, REPAIR AFTER WORK IS COMPLETED
PREPARE FOR INSTALLATION OF CARD
READER, REPAIR AFTER WORK IS COMPLETED
02-18
issue date
project #
phasesheet projectownerrevision dateaddress
PERMIT SET8/29/2022 5:33:33 PMD2.1.1
08/29/2022LEVEL 1 DEMOLITION PLAN22006.00
PERMIT SETSPANISH PEAKSCONNECTIONS HEALTH SOLUTIONS120 19TH AVE. SUITE HBOZEMAN, MONTANA 5971802-01 ELECTRICAL PANELS TO REMAIN OPERATIONAL THROUGHOUT DEMOLITION WORK; CONTRACTOR TO PROVIDE TEMPORARY SUPPORT BY TO PANELS
AND FEEDING CONDUIT BY BRACING PORTION OF NOTED DEMO WALL TO REMAIN IN PLACE. CONTACT ARCHITECT IF UNFORSEEN CIRCUMSTANCES
ARE ENCOUNTERED.
02-02 DEMO ALL PLUMBING WASTE LINES TO UNDERSIDE OF FLOOR. CAP AND SEAL IN EXISTING CRAWL SPACE
02-03 DEMO EXISTING GYPSUM BOARD AS REQUIRED FOR INSTALLATION OF STRUCTURAL ELEMENTS AND STOREFRONT INSTALLATION, REPAIR WALL AND
PREPARE INSTALL OF NEW MATERIAL OVER EXISTING.
02-04 CAREFULLY REMOVE DOOR AND HARDWARE, STORE IN NON-TRAFFICKED AREA, AND HOLD FOR OWNER'S COORDINATED REMOVAL
02-06 EXISTING CRAWL SPACE ACCESS. PROTECT HATCH STRUCTURE DURING THIS WORK. PREPARE HATCH TO RECEIVE NEW SCHEDULED FINISHES.
02-07 EXISTING ROOF ACCESS, EXTERIOR LADDER; CONTRACTOR TO MAINTAIN LOCKED AND SECURED ACCESS AT ALL TIMES; COORDINATE WITH BOZEMAN
HEALTH FOR MAINTENANCE OF UNITS DURING CONSTRUCTION WORK.
02-09 CAREFULLY REMOVE INTERIOR WINDOW, STORE IN NON-TRAFFICKED AREA, AND HOLD FOR OWNER'S COORDINATED REMOVAL
02-12 DEMO EXISTING WALL SUPPORTING ELECTRICAL PANEL, SEE ELECTRICAL DRAWINGS FOR BALANCE OF WORK.
02-13 DEMO EXISTING WALL IN ITS ENTIRETY, INCLUDING ALL WALL MOUNTED DEVICES, CONDUITS, AND PIPES TO NEAREST TERMINATION POINT;
COORDINATE WITH MEP DRAWINGS
02-14 DEMO EXISTING BASE AND WALL CABINETS, AND COUNTERTOPS IN THEIR ENTIRETY
02-16 DEMO EXISTING WALL FOR OPENING INSTALLATION; PREPARE TO RECEIVE NEW FINISHES
02-17 DEMO EXTERIOR CONCRETE SLAB, EXCAVATE TO EXISTING TOP OF FOOTING; PREPARE TO RECEIVE NEW CONCRETE FOUNDATION TO BELOW FROST
LINE; COORDINATE EXTENT OF DEMO AND NEW WORK WITH CIVIL DRAWINGS
02-18 DEMO EXISTING EXTERIOR STOREFRONT WINDOW AND / OR DOOR IN ITS ENTIRETY; PREPARE TO RECEIVE NEW EXTERIOR ENVELOPE CONSTRUCTION
02-22 DEMO EXISTING GYPSUM BOARD FROM EXISTING WALL; SEAL GYPSUM BOARD OPENINGS THROUGHOUT WITH FIRE RATED SYSTEM BASED ON
OPENING ENCOUNTERED TO CONVERT EXISTING WALL TO UL DES U465, INCLUDING ADDING FIRE PROTECTION AT EXITING OUTLETS. EXTEND WALL TO
UNDERSIDE OF STRUCTURE WHERE NEEDED AND SEAL. INSTALL NEW GYPSUM BOARD AND PREPARE FOR NEW FINISHES.
09-01 PAINT AND FINISH, INCLUDING BASE TO MATCH EXISTING ADJACENT WALLS, AT COMPLETION OF PERMANENT WALL.
09-22 INSTALL 1-HOUR FIRE RATED WALL PRIOR TO COMMENCEMENT OF DEMOLITION WORK, SEALED FROM FLOOR TO UNDERSIDE OF EXISTING ROOF; SEE
WALL ASSEMBLY TYPES; CONNECT AND CONTINUE RATED WALLS BETWEEN EXISTING WALLS AND NEW WALLS TO MAINTAIN A CONTINUOUS RATED
ASSEMBLY FOR EAST TO WEST OF BUILDING.
13-02 PROVIDE TWO STACKS OF TACK MATTS AT ACCESS POINT TO INFECTION PREVENTION BARRIER; COORDINATE WITH BOZEMAN HEALTH'S PROTOCOLS
13-03 TEMPORARILY EXTEND TOP OF EXISTING WALL TO UNDERSIDE OF EXISTING STRUCTURE WITH 6MM FIRE RATED PLASTIC BARRIER, SEAL AS REQUIRED
TO MAINTAIN NEGATIVE PRESSURE WITHIN CONSTRUCTION ZONE. PROVIDE ZIPPED OPENING IN PLASTIC.
KEYNOTES
1/4" = 1'-0"13 LEVEL 1 DEMOLITION PLAN