Oak and Cottonwood Apartments Phase 1 Site Plan
Application No. 21379
November 18, 2022
Page 1 of 14
Application No. 21379 Type Site Plan
Project Name Oak and Cottonwood Apartments Phase 1 Site Plan (SP)
Summary A site plan application to construct 36 two-bedroom apartments in three 12-unit buildings as a
part of phase 1 of the Oak and Cottonwood Apartments Master Site Plan. The development
includes parking, sidewalks, landscaping, open space, and other associated site
improvements.
Zoning R-O Growth Policy Urban Neighborhood Parcel Size 3.1292 Acres
Overlay District(s) None
Street Address Addresses TBD
Legal Description Flanders Creek Sub, S04, T02 S, R05 E, Block 5, Lot 5, Acres 1.611, Plat J-434 Plus Open
Space, City of Bozeman, Gallatin County, Montana.
Owner L&S Properties, 2013 E. Silver Circle, Belgrade, MT 59714
Applicant Same as Owner
Representative JDS Architects, 719 W. Mendenhall, Bozeman, MT 59715
Staff Planner Danielle Garber Engineer Mikaela Schultz
Noticing Public Comment Period Site Posted Adjacent Owners
Mailed
Newspaper Legal Ad
8/09/22 – 8/24/22
8/9/22 8/9/22 N/A
Advisory Boards Board Date Recommendation
Development Review
Committee
8/5/22 The application is adequate, conforms to
standards, and is sufficient for approval with
conditions and code provisions
Design Review Board NA NA
Recommendation The application is adequate, conforms to standards, and is sufficient for approval with conditions and
code provisions as noted below.
Decision Authority Director of Community Development Date 11/21/22
Full application and file of record: Community Development Department, 20 E. Olive St., Bozeman, MT 59715
Staff Report
Oak and Cottonwood Apartments Phase 1 Site Plan
Application No. 21379
November 18, 2022
Page 2 of 14
FINDINGS OF FACT AND APPEAL PROVISIONS CERTIFICATE
A) PURSUANT to Chapter 38, Article 2, Bozeman Municipal Code (BMC), and other applicable sections of Ch.38, BMC, public
notice was given, opportunity to submit comment was provided to affected parties, and a review of the Site Plan described in
this report was conducted. The applicant proposed to the City a Site Plan (SP) to permit 36 two-bedroom apartments in three
12-unit buildings as a part of phase 1 of the Oak and Cottonwood Apartments Master Site Plan. The purposes of the Site Plan
review were to consider all relevant evidence relating to public health, safety, welfare, and the other purposes of Ch. 38, BMC;
to evaluate the proposal against the criteria of Sec. 38.230.100 BMC, and the standards of Ch. 38, BMC; and to determine
whether the application should be approved, conditionally approved, or denied.
B) It appeared to the Director that all parties and the public wishing to examine the proposed Site Plan and offer comment were
provided the opportunity to do so. After receiving the recommendation of the relevant advisory bodies established by Ch. 38,
Art. 210, BMC, and considering all matters of record presented with the application and during the public comment period
defined by Ch. 38, BMC, the Director has found that the proposed Site Plan would comply with the requirements of the BMC if
certain conditions were imposed. Therefore, being fully advised of all matters having come before them regarding this
application, the Director makes the following decision.
C) The Site Plan has been found to meet the criteria of Ch. 38, BMC, and is therefore approved, subject to the conditions listed
in this report and the correction of any elements not in conformance with the standards of the Title. The evidence contained in
the submittal materials, advisory body review, public testimony, and this report, justifies the conditions imposed on this
development to ensure that the Site Plan complies with all applicable regulations, and all applicable criteria of Ch. 38, BMC.
On this ______ day of ________________, 2022, Anna Bentley, Director of Community Development, approved with
conditions this Site Plan for and on behalf of the City of Bozeman as authorized by Sec. 38.200.010, BMC.
D) This Director of Community Development’s project decision may be appealed by filing a documented appeal with and paying
an appeal fee to the Clerk of the Commission for the City of Bozeman within 10 working days after the date of the final decision
as evidenced by the Director’s signature, following the procedures of Sec. 38.250.030, BMC.
DIRECTOR OF COMMUNITY DEVELOPMENT
Staff Report
Oak and Cottonwood Apartments Phase 1 Site Plan
Application No. 21379
November 18, 2022
Page 3 of 14
CONDITIONS OF APPROVAL
1. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions
of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman
Municipal Code or state law.
2. Provide executed hard copies of the required public utility easements and the sewer pipeline and access easement
agreement meeting the city approved easement language to the review engineer prior to final site plan approval.
3. Master Site Plan and Site Plan approval are pending receipt of the executed hard copy of the Sewer and Water
Pipeline Access Easement, final review, commission approval, and filing with the county clerk. Please submit the
hard copy to the review engineers – Mikaela Schultz, and Simon Lindley.
4. City of Bozeman Resolution 5076, Policy 1- Please execute and provide a copy of the recorded SID Waiver to the
review engineer prior to final site plan approval.
CODE PROVISIONS
1. BMC 38.420.030 - Cash donation in-lieu of land dedication. Provide proof of payment and approval for CILP from
the Parks Department prior to final site plan approval. Contact Matthew Lee, mjlee@bozeman.net with any
questions.
2. BMC 38.410.030 - Water adequacy. Provide proof of payment for cash-in-lieu of water rights prior to final site plan
approval. Contact Griffin Nielsen, gnielsen@bozeman.net with any questions or your reviewing engineer for the final
total based on estimated annual municipal water demand.
3. BMC 38.270.030.D - Exception for concurrent construction. In certain circumstances, the issuance of a building
permit may be allowed prior to completion of the public infrastructure, if the criteria listed in this section are met.
Provide concurrent construction approval prior to building permit approval.
Staff Report
Oak and Cottonwood Apartments Phase 1 Site Plan
Application No. 21379
November 18, 2022
Page 4 of 14
Figure 1: Current Zoning Map
Staff Report
Oak and Cottonwood Apartments Phase 1 Site Plan
Application No. 21379
November 18, 2022
Page 5 of 14
Figure 2: Site Plan
Staff Report
Oak and Cottonwood Apartments Phase 1 Site Plan
Application No. 21379
November 18, 2022
Page 6 of 14
Figure 3: Landscape Plan
Staff Report
Oak and Cottonwood Apartments Phase 1 Site Plan
Application No. 21379
November 18, 2022
Page 7 of 14
Figure 4: Phasing Plan
Staff Report
Oak and Cottonwood Apartments Phase 1 Site Plan
Application No. 21379
September 7, 2022
Page 8 of 14
Figure 5: Perspective Views
Staff Report
Oak and Cottonwood Apartments Phase 1 Site Plan
Application No. 21379
September 7, 2022
Page 9 of 14
ANALYSIS AND FINDINGS
Analysis and resulting recommendations based on the entirety of the application materials, municipal codes, standards,
plans, public comment, and all other materials available during the review period. Collectively this information is the record
of the review. The analysis in this report is a summary of the completed review.
Plan Review, Section 38.230.100, BMC
In considering applications for plan approval under this title, the Director of Community Development shall consider the
following:
1. Conformance with Article 1 - Consistency with the City’s adopted Growth
Policy 38.100.040.D
Meets Code?
Growth Policy
Land Use
Urban Neighborhood Yes
Zoning R-O, Residential-Office District Yes
Comments: The project conforms to the requirements of the R-O zoning district. The 2020 Community Plan
designation of Urban Neighborhood correlates with the R-O zoning district. The proposed project conforms
to this designation by providing urban density homes in proximity to commercial mixed-use districts.
2. Conformance with Article 1 - All other applicable laws, ordinances, and
regulations (38.100.080)
Condominium ownership No
Comments: Additional steps will be required including but not limited to review of building permits and
infrastructure plans. The Building Division of the Department of Community Development will review the
requirements of the International Building Code for compliance at the time of building permit application.
3. Conformance with Article 2, including the cessation of any current violations
(38.200.160)
Meets Code?
Current Violations None Yes
Comments: There are no current violations on the property.
4. Conformance with Article 2 - Submittal material (38.220) requirements and
plan review for applicable permit types (38.230)
Meets Code?
Site Plan Yes
Submittal requirements 38.220.100 Yes
Phasing of development
38.230.020.B
No. of phases: 1 Yes
Comments: The master site plan includes work in two phases across two lots. No sub-phasing plan was
provided for phase 1.
Any additional use permit (Conditional Use Permit) 38.230.120 or (Special use
Permit) 38.230.120
NA
Comments: No conditional or special uses are proposed.
5. Conformance with Article 3 - Zoning Provisions (38.300) Meets Code?
Permitted uses 38.310 Apartments Yes
Form and intensity standards 38.320
Zoning: R-O Setbacks
(feet)
Structures Parking /
Loading
Yes
Front Landscape Frontage NA
Rear NA NA
Staff Report
Oak and Cottonwood Apartments Phase 1 Site Plan
Application No. 21379
September 7, 2022
Page 10 of 14
Side 5 NA
Alley NA NA
Comments: The primary use of a lot, as measured by building area, permitted in the R-O district is
determined by the underlying growth policy land use designation. Where the district lies over a residential
growth policy designation the primary use shall be non-office uses. Primary use shall be measured by
percentage of building floor area. The proposed uses of 100% residential apartments by building floor
area is consistent with the underlying growth policy designation of urban neighborhood. The proposed
project fronts Twin Lakes Avenue and Flanders Way, but is separated from the West Oak Street frontage
by a subdivision stormwater tract. The application provides a 10-foot front setback meeting the
landscaped block frontage standard for Flanders Way and Twin Lakes Avenue on the west and south
property lines. The interior east lot line is shared with phase 2 for access.
Lot
coverage
24.3% Allowed No Max Yes
Building
height
40’4” Allowed 60’ Yes
Comments: Lot coverage and building height form and intensity standards are met with the proposed design.
Applicable zone specific or overlay standards 38.330-40 NA
Comments: The project is not within an overlay district, or zoning district with specific standards
General land use standards and requirements 38.350 Yes
Comments: There are no proposed encroachments. Upper level balconies do not encroach into setbacks.
Applicable supplemental use criteria 38.360 Yes
Supplemental
uses/type
None NA
Comments: NA
Wireless facilities 38.370 NA
Affordable Housing 38.380.010 NA
Affordable housing plan NA
Comments: No wireless facilities are proposed. No affordable housing requirements are triggered with
the proposed uses.
6a. Conformance with Article 4 - Community Design Provisions: Transportation
Facilities and Access (38.400)
Meets Code?
Streets 38.400.010 Yes
Street and road dedication 38.400.020 NA
Access easements NA
Level of Service
38.400.060
Yes Transportation grid adequate to serve site Yes
Comments: Adjacent streets exist to serve the site, no additional dedication is needed. No new traffic
impact study was required by the Engineering Division however, a peak-hour trip generation letter was
provided by the Applicant to ensure that the proposed project would not exceed the original assumed trip
estimates reviewed with the subdivision. Level of service standards for arterial and collector streets
serving the site was evaluated by engineering. A Waiver of Right to Protest Creation of Special
Improvement Districts (SID’s) for future transportation improvements was provided by the applicant
ensuring participation in funding of future infrastructure improvements that may be required to offset
impacts created by development of the property.
Sidewalks 38.400.080 Yes
Staff Report
Oak and Cottonwood Apartments Phase 1 Site Plan
Application No. 21379
September 7, 2022
Page 11 of 14
Comments: Sidewalks will be constructed Along Flanders Way and Twin Lakes Avenue. Sidewalks exist
along Oak Street. A secondary sidewalk will front the north side of the property for access, and will
connect directly to the public sidewalk system around the platted stormwater ponds along Oak.
Drive access 38.400.090 Access to site: 2 Yes
Fire lanes, curbs, signage and striping Yes
Comments: The project proposes a shared access from Flanders Way with Phase 2, as well as an
access from Twin Lakes, consistent with the master site plan approval.
Street vision triangle 38.400.100 Yes
Transportation pathways 38.400.110 NA
Pedestrian access easements for shared use pathways and similar transportation
facilities
NA
Public transportation 38.400.120 NA
Comments: No transportation pathways or public transportation facilities are proposed with this
application.
6b. Conformance with Article 4 – Community Design Provisions: Community
Design and Elements (38.410)
Meets Code?
Neighborhood centers 38.410.020 NA
Comments: This project does not trigger neighborhood center requirements.
Lot and block standards 38.410.030-040 Yes
Midblock crossing: rights of way for pedestrians alternative block delineation NA
Comments: This project does not trigger lot and block standards.
If the development is adjacent to an existing or approved public park or public open
space area, have provisions been made in the plan to avoid interfering with public
access to and use of that area
NA
Provisions for utilities including efficient public services and utilities 38.410.050-060 Yes
Easements (City and public utility rights-of-way etc.) Yes
Water, sewer, and stormwater Yes
Other utilities (electric, natural gas, communications) Yes
CIL of water Yes
Comments: Requirements were reviewed by engineering. Payment of CIL of water rights is a required
condition of approval.
Municipal infrastructure requirements 38.410.070 Yes
Comments: Municipal water, sanitary sewer, and storm sewer systems proposed with this project have
been reviewed by engineering.
Grading & drainage 38.410.080 Yes
Location, design and capacity of stormwater facilities Yes
Stormwater maintenance plan Yes
Landscaping: native species, curvilinear, 75% live vegetation 38.410.080.H NA
Comments: Location, design and capacity of stormwater facilities was reviewed by engineering. Phase 1
proposes an underground stormwater chamber below the open space.
Watercourse setback 38.410.100 NA
Watercourse setback planting plan 38.410.100.2.f NA
6c. Conformance with Article 4 – Community Design Provisions: Park and
Recreation Requirements (38.420)
Meets Code?
Parkland requirements 38.420.020.A 0.172 ac. CIL required Yes
Staff Report
Oak and Cottonwood Apartments Phase 1 Site Plan
Application No. 21379
September 7, 2022
Page 12 of 14
Cash donation in lieu (CIL) 38.420.030 Yes
Improvements in-lieu NA
Comments: Coordinate final dollar amount calculation and payment with Matthew Lee with the Parks
Department. This amount must be verified by parks and paid by the applicant prior to final site plan
approval.
Park Frontage 38.420.060 NA
Park development 38.420.080 NA
Recreation pathways 38.420.110 NA
Park/Recreational area design NA
Comments: No parks are proposed with this application. A developed public park exists approximately a
quarter mile to the southwest and can be accessed via a public sidewalks crossing local streets. Two yet
undeveloped City parks also are located less than a quarter mile to the northeast and northwest across
Oak Street.
7a. Conformance with Article 5 – Project Design: Block Frontage Standards
(38.510)
Meets Code?
Block frontage classification Landscaped, Special Residential Yes
Departure criteria None requested Yes
Comments: Flanders Way and Twin Lakes Avenue are both Landscaped Frontages. The applicant is
proposing a 10-foot setback along those frontages and is meeting the residential transparency requirements.
The project meets the building placement, façade transparency, parking location, and sidewalk width
requirements. The primary entrances are open air through the buildings providing the adequate weather
protection. Individual sidewalk connections to front facing patios are also provided with covered concrete
patios. The applicant is providing a 10-foot setback between living areas that face internal circulation,
meeting the special residential separation requirements.
7b. Conformance with Article 5 – Project Design: Site Planning and Design
Elements (38.520)
Meets Code?
Design and arrangement of the elements of the plan (e.g., buildings, circulation, open
space and landscaping, etc.) so that activities are integrated with the organizational
scheme of the community, neighborhood, and other approved development and produce
an efficient, functionally organized and cohesive development
Yes
Relationship to adjacent properties 38.520.030 NA
Non-motorized circulation and design systems to enhance convenience and safety
across parking lots and streets, including, but not limited to paving patterns, pathway
design, landscaping and lighting 38.420.040
Yes
Comments: Pedestrian paths through the site and to the open space and service areas meet the
standards in this section for location, connections, and widths. The application proposes stamped
concrete crosswalks. Landscaping is provided as required between buildings and walkways.
Design of vehicular circulation systems to assure that vehicles can move safely and
easily both within the site and between properties and activities within the general
community 38.420.050
Yes
Internal roadway design 38.520.050.D NA
Comments: NA
On-site open space 38.520.060
Total required 5,400 square feet Yes
Total provided 5,655 square feet Yes
Comments: 1,551 square feet provided in one common open space areas in phase 1. Upper level
balconies meeting the area and dimensional requirements total 2,700 square feet (50% of the required
Staff Report
Oak and Cottonwood Apartments Phase 1 Site Plan
Application No. 21379
September 7, 2022
Page 13 of 14
7d. Conformance with Article 5 – Parking (38.540) Meets Code?
Parking requirements 38.540.050 Yes Yes
Parking requirements residential 38.540.050.A.1 72 spaces
Reductions residential 38.540.050.A.1.b 10% Transit
Parking requirements nonresidential
38.540.050.A.2
NA
Reductions nonresidential 38.540.050.A.2.c NA
Provided off-street 78 spaces
Provided on-street 0
Bicycle parking 38.540.050.A.4 20
Comments: Parking is proposed to be provided for the 36 2 two-bedroom units in the off-street parking
lot, with a 7 space reduction for proximity to a covered transit stop at Gallatin High School. A total of 65
stalls is required with 78 provided off-street. Phase 1 does not exceed the 125% maximum. Each stall
provided off-street meets the stall, aisle, and driveway design requirements of Section 38.540.020. 6
bicycle parking spaces are required at 20 are provided. Bike parking will be provided central to the site,
adjacent to the open space area and each building with compliant U-style bike racks and within buildings
in common hallways.
Loading and uploading area requirements 38.540.080 NA
First berth – minimum 70 feet length, 12 feet in width, 14 feet in height NA
Additional berth – minimum 45 feet length NA
Comments: NA
7e. Conformance with Article 5 – Landscaping (38.550) Meets Code?
Mandatory landscaping requirements 38.550.050 Yes
Drought tolerant species 75% required Yes
Parking lot landscaping Yes
Additional screening NA
total). First floor private open space areas make up 1,404 square feet will be screened with landscaping
as required. The common open space is a grassy area with seating and bike racks. It is proposed to be
screened from adjacent residential windows with landscaping beds, and from the parking lot and an
electrical transformer with a split rail fence. Stormwater retention was moved underground to maximize
usability of the area. When phase two is built, landscape screening from the adjacent building to the east
will be added shrinking this area in size, but phase 2 will also add additional larger open space
opportunities for residents. Total open space provided in phase 1 is 5,655 square feet.
Location and design of service areas and mechanical equipment 38.520.070 Yes
Comments: Solid waste will be collected via two enclosures in the parking lot. The enclosures meet the
screening standards in this section and adequate adjacent landscaping is provided. Power and gas
meters will be screened with landscaping.
7c. Conformance with Article 5 – Project Design: Building Design (38.530) Meets Code?
Compatibility with, and sensitivity to, the immediate environment of the site and the
adjacent neighborhoods and other approved development 38.530.030
Yes
Building massing and articulation 38.530.040 Yes
Building details, materials, and blank wall treatments 38.530.050-070 Yes
Comments: The three buildings are meeting the building design standards of this section. Entries,
building materials, and vertical articulation serve to break up the elevations. Building materials consist of
fir rainscreen with natural wood stain, corrugated metal, fiber cement siding, and board formed concrete
and meet standards for durability and variety.
Staff Report
Oak and Cottonwood Apartments Phase 1 Site Plan
Application No. 21379
September 7, 2022
Page 14 of 14
Street frontage Yes
Street median island NA
Acceptable landscape materials Yes
Protection of landscape areas NA
Irrigation: plan, water source, system type Yes
Residential adjacency NA
Comments: The provided landscaping plan conforms to standards.
Landscaping of public lands 38.550.070 Yes
Comments: Street trees will be provided along Flanders Way and Twin Lakes Avenue. Species and
placement was reviewed by Forestry.
7f. Conformance with Article 5 – Signs (38.560) Meets Code?
Allowed SF/building 38.560.060 NA NA
Proposed SF/building NA NA
Comments: No signage is proposed with this application. A sign permit application is required prior to the
installation of any signs.
7g. Conformance with Article 5 – Lighting (38.560) Meets Code?
Site lighting (supports, cutoff, footcandles, temperature) 38.570.040 NA
Building-mounted lighting (supports, cutoff, footcandles, temperature) 38.570.040.B Yes
Comments: The proposed building mounted wall packs and parking lot lighting meet the required cutoff
and intensity requirements.
8. Conformance with Article 6 – Natural Resource Protection Meets Code?
Floodplain regulations 38.600 NA
Wetland regulations 38.610 NA
Comments: NA
9. Relevant Comment from Affected Parties (38.220) Meets Code?
Public Comment Yes
Comments: A public notice period was conducted meeting the requirements of this section and detailed on
page 1 of this report. No public comment was provided.
10. Division of Land Pertaining to Subdivisions (38.240-Part 4) Meets Code?
Subdivision exemptions NA
Required easements Yes
Comments: No subdivision exemptions were required with this application. Access & Utility easements
are required and must be executed and provided to engineering prior to final site plan approval.