HomeMy WebLinkAbout21435 Staff Report Staff Report
Icon at Northwest Crossing Phase 2 Site Plan
Application No. 21435
November 9, 2022
Page 1 of 17
Application No. 21435
Type Site Plan
Project Name Icon at Northwest Crossing Phase 2 Site Plan
Summary 134 apartment homes in phase 1 of the Northwest Crossing Subdivision NW of the corner of
West Oak St. and North Cottonwood Rd. This application is Phase 2 of the Icon at Northwest
Crossing Master Site Plan application no. 21433. All phases in the site development include
off-street parking, access, sidewalks, landscaping, open space, and other associated site
improvements. This development is responsible for a portion of the Northwest Crossing park
development, known as P3 East within the Northwest Crossing Master Park Plan.
Zoning REMU &
B-2M
Growth Policy Community Commercial
Mixed Use and Residential
Mixed Use
Parcel Size 5.26 Acres
Overlay District(s) None
Street Address TBD
Legal Description Lot 14 Of The Preliminary Plat Of Northwest Crossing Phase 1, Situated In The NE 1/4 Of
Section 4, Township 2 South, Range 5 East, Principal Meridian, City Of Bozeman, Gallatin
County, Montana.
Owner NWX Apartments LLC, 1735 South 19th Ave Suite B, Bozeman, MT 59718
Applicant Same as Owner
Representative Norris Design, 244 North College Ave #130, Fort Collins, CO 80524
Staff Planner Danielle Garber Engineer Griffin Nielsen
Noticing Public Comment Period Site Posted Adjacent Owners
Mailed
Newspaper Legal Ad
10/13/22 – 10/28/22
10/13/22 10/13/22 N/A
Advisory Boards Board Date Recommendation
Development Review
Committee
10/7/22 The application is adequate, conforms to
standards, and is sufficient for approval with
conditions and code provisions
Design Review Board 11/7/22 Approval
Recommendation The application is adequate, conforms to standards, and is sufficient for approval with conditions and
code provisions as noted below.
Decision Authority Director of Community Development Date 11/17/22
Full application and file of record: Community Development Department, 20 E. Olive St., Bozeman, MT 59715
Staff Report
Icon at Northwest Crossing Phase 2 Site Plan
Application No. 21435
November 9, 2022
Page 2 of 17
FINDINGS OF FACT AND APPEAL PROVISIONS CERTIFICATE
A) PURSUANT to Chapter 38, Article 2, Bozeman Municipal Code (BMC), and other applicable sections of Ch.38, BMC, public
notice was given, opportunity to submit comment was provided to affected parties, and a review of the Site Plan described in
this report was conducted. The applicant proposed to the City a Site Plan (SP) to permit 134 apartment homes in phase 1 of
the Northwest Crossing Subdivision and associated site improvements. The purposes of the Site Plan review were to consider
all relevant evidence relating to public health, safety, welfare, and the other purposes of Ch. 38, BMC; to evaluate the proposal
against the criteria of Sec. 38.230.100 BMC, and the standards of Ch. 38, BMC; and to determine whether the application
should be approved, conditionally approved, or denied.
B) It appeared to the Director that all parties and the public wishing to examine the proposed Site Plan and offer comment were
provided the opportunity to do so. After receiving the recommendation of the relevant advisory bodies established by Ch. 38,
Art. 210, BMC, and considering all matters of record presented with the application and during the public comment period
defined by Ch. 38, BMC, the Director has found that the proposed Site Plan would comply with the requirements of the BMC if
certain conditions were imposed. Therefore, being fully advised of all matters having come before them regarding this
application, the Director makes the following decision.
C) The Site Plan has been found to meet the criteria of Ch. 38, BMC, and is therefore approved, subject to the conditions listed
in this report and the correction of any elements not in conformance with the standards of the Title. The evidence contained in
the submittal materials, advisory body review, public testimony, and this report, justifies the conditions imposed on this
development to ensure that the Site Plan complies with all applicable regulations, and all applicable criteria of Ch. 38, BMC.
On this 17th day of November 2022, Anna Bentley, Director of Community Development, approved with conditions this Site
Plan for and on behalf of the City of Bozeman as authorized by Sec. 38.200.010, BMC.
D) This Director of Community Development’s project decision may be appealed by filing a documented appeal with and paying
an appeal fee to the Clerk of the Commission for the City of Bozeman within 10 working days after the date of the final decision
as evidenced by the Director’s signature, following the procedures of Sec. 38.250.030, BMC.
DIRECTOR OF COMMUNITY DEVELOPMENT
Staff Report
Icon at Northwest Crossing Phase 2 Site Plan
Application No. 21435
November 9, 2022
Page 3 of 17
DRAFT CONDITIONS OF APPROVAL
1. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions
of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman
Municipal Code or state law.
2. Phasing as noted on the concurrent construction plan represents the order of construction for the buildings and site.
All phased site improvements including access, parking, open space, parkland, bicycle parking, walkways, and
stormwater must be installed with the first phased building prior to occupancy of any structures in each phase.
The park improvements must be completed or financially guaranteed with Phase 1. Phased landscaping may be
financially guaranteed to accommodate construction and seasonality.
DRAFT CODE PROVISIONS
1. BMC 38.270.030.D - Exception for concurrent construction. In certain circumstances, the issuance of a building
permit may be allowed prior to completion of the public infrastructure, provided that the criteria listed in this section
are met. Provide concurrent construction approval prior to final building permit approval.
2. BMC 38.420 – Park development and the cash-in-lieu/improvements-in-lieu proposal must be approved by the Parks
Department prior to final site plan approval. Contact Matthew Lee, mjlee@bozeman.net with any questions.
3. BMC 38.410.030 - Water adequacy. Provide proof of payment for cash-in-lieu of water rights prior to final site plan
approval. Contact Griffin Nielsen, gnielsen@bozeman.net with any questions or your reviewing engineer for the final
total based on estimated annual municipal water demand.
4. BMC 38.410.060 – Easements. Executed public easements must be provided to the Engineering Division prior to
final site plan approval. Easements must be stamped by a licensed professional surveyor..
5. BMC 38.530.070.C – Blank walls. The application proposes landscaping to treat blank walls present on the left and
right elevations for Building Type A. The planting plans adjacent to these buildings must be updated to show
planting beds directly in front of each treated blank wall with plant species selected to meet the height and width
requirements of this section prior to building permit approval.
6. BMC 38.520.070 – Mechanical equipment and utility meter screening. Sheet LS508 shows arborvitae shrubs to
screen utility meters (all building types) and ground mounted mechanical equipment for (Building Type A). The
planting plan sheets must be updated to reflect these plant materials and locations prior to building permit
approval.
7. BMC 38.570.040 – The proposed string lights, labeled F1 on the lighting drawings, must include the light shades
shown on sheet E1.11 to meet full cutoff compliance. Revise this drawing sheet prior to building permit approval.
Staff Report
Icon at Northwest Crossing Phase 2 Site Plan
Application No. 21435
November 9, 2022
Page 4 of 17
Figure 1: Current Zoning Map
Staff Report
Icon at Northwest Crossing Phase 2 Site Plan
Application No. 21435
November 9, 2022
Page 5 of 17
Figure 2: Proposed Site Plan North
Staff Report
Icon at Northwest Crossing Phase 2 Site Plan
Application No. 21435
November 9, 2022
Page 6 of 17
Figure 3: Overall Landscaping Plan, Detailed Sheets in Application
Staff Report
Icon at Northwest Crossing Phase 2 Site Plan
Application No. 21435
November 9, 2022
Page 7 of 17
Figure 4: Open Space
Staff Report
Icon at Northwest Crossing Phase 2 Site Plan
Application No. 21435
November 9, 2022
Page 8 of 17
Figure 5: Site Rendering, Looking SE
Figure 6: Clubhouse Rendering
Staff Report
Icon at Northwest Crossing Phase 2 Site Plan
Application No. 21435
November 9, 2022
Page 9 of 17
Figure 7: Apartment Building B-Alt Rendering
Figure 8: Apartment Building C Rendering
Staff Report
Icon at Northwest Crossing Phase 2 Site Plan
Application No. 21435
November 9, 2022
Page 10 of 17
ANALYSIS AND FINDINGS
Analysis and resulting recommendations based on the entirety of the application materials, municipal codes, standards,
plans, public comment, and all other materials available during the review period. Collectively this information is the record
of the review. The analysis in this report is a summary of the completed review.
Plan Review, Section 38.230.100, BMC
In considering applications for plan approval under this title, the Director of Community Development shall consider the
following:
1. Conformance with Article 1 - Consistency with the City’s adopted Growth
Policy 38.100.040.D
Meets Code?
Growth Policy
Land Use
Community Commercial Mixed Use & Residential Mixed
Use
Yes
Zoning REMU, Residential Emphasis Mixed Use Yes
Comments: The project conforms to the requirements of the REMU zoning district. The 2020 Community
Plan designation of Residential Mixed Use correlates with the REMU zoning district. The project conforms to
this designation by providing housing at density in accordance with the REMU zoning provisions.
2. Conformance with Article 1 - All other applicable laws, ordinances, and
regulations (38.100.080)
Condominium ownership No
Comments: Additional steps will be required including but not limited to review of building permits and
infrastructure plans. The Building Division of the Department of Community Development will review the
requirements of the International Building Code for compliance at the time of building permit application.
Concurrent construction and infrastructure review will take place with the Engineering Division.
3. Conformance with Article 2, including the cessation of any current violations
(38.200.160)
Meets Code?
Current Violations None Yes
Comments: There are no current violations on the property.
4. Conformance with Article 2 - Submittal material (38.220) requirements and
plan review for applicable permit types (38.230)
Meets Code?
Site Plan Yes
Submittal requirements 38.220.100 Yes
Phasing of development
38.230.020.B
No. of phases: 6 Yes
Comments: The site plan criteria are met with this project with conditions of approval and code
provisions. The proposal is compatible and sensitive to the immediate environment of the site and
adjacent neighborhoods. The overall master site plan details improvements in two phases. Phase 1
includes the south lot, Lot 13, and the northeast lot, Lot 1. Phase 2 includes the north lot, Lot 15. Phase 2
includes 6 sub-phases for occupancy.
Design review was conducted by the Community Development Board (CDB) acting as the Design Review
Board (DRB) consistent with BMC 38.230.040. A video of the meeting may be found here:
https://bozeman.granicus.com/player/clip/1903 and may be accessed via the Commission Meeting Video
page at Bozeman.net. No public comment was received at the meeting. Questions to the applicant and
staff included snow storage, block frontage, commercial proximity, the decision not to build commercial
Staff Report
Icon at Northwest Crossing Phase 2 Site Plan
Application No. 21435
November 9, 2022
Page 11 of 17
spaces and design questions. The board’s motion to recommend approval passed 5-2. Some comments
from board members listed below and are paraphrased:
Parking should be in a parking structure, not in surface lots.
The density should make the commercial node next door more viable.
Houses and apartments should be combined with a variety of types, not segregated.
The design does not differentiate from any other buildings that exist in Bozeman.
Any additional use permit (Conditional Use Permit) 38.230.120 or (Special use
Permit) 38.230.120
NA
Comments: No conditional or special uses are proposed.
5. Conformance with Article 3 - Zoning Provisions (38.300) Meets Code?
Permitted uses 38.310 Apartment Building Yes
Form and intensity standards 38.320
Zoning: REMU Setbacks
(feet)
Structures Parking / Loading Yes
Front 10-15 10-15
Rear 10 5
Side 5 5
Alley NA NA
Comments: Apartment buildings are a primary use within the REMU zoning district. The proposed project
fronts onto 4-streets and meets the front setback of a minimum of 10-feet, actual measurements vary by
building, some sit at 10-feet others are further setback. No rear setbacks are present as the subject lot
has 4 street frontages.
Lot
coverage
26.6% Allowed 75% Yes
Building
height
2-3-stories Allowed 5-Stories Max. Yes
Comments: Lot coverage and building height form and intensity standards are met with the proposed design.
Applicable zone specific or overlay standards 38.330-40 Yes
Comments: The project is partially within the REMU district special standards. The project is meeting the
following applicable standards:
Street and circulation standards. The buildings are oriented with front facades facing the street
as specified in the applicable block frontages. Shared drive accesses are utilized. No parking is
proposed within front setbacks.
Site planning and design element standards. The project is meeting the site planning design
requirements. See Section 7b below.
Open space standards. The applicant is proposing 4 shared open space areas that meet the
requirements of this section that the private residential open space be urban in nature with
plazas, hardscaping, planters, and furniture. The largest open space area (B) proposes a pool,
outdoor kitchen, various types of seating, hammocks, a fire pit, and a bike repair station. Open
space areas A, C, and D propose two dog park areas, and outdoor kitchen, shade shelters, and
associated walkways, lighting, and landscaping.
Building standards. The application is meeting requirements for building design, see section 7c
below.
Landscaping and lighting, see 7e and 7f below.
General land use standards and requirements 38.350 Yes
Comments: Applicable standards in this section are met.
Applicable supplemental use criteria 38.360 NA
Staff Report
Icon at Northwest Crossing Phase 2 Site Plan
Application No. 21435
November 9, 2022
Page 12 of 17
Supplemental
uses/type
None NA
Comments: No supplemental uses are applicable at this time.
Wireless facilities 38.370 NA
Affordable Housing 38.380.010 NA
Affordable housing plan NA
Comments: No wireless facilities are proposed. No affordable housing requirements are triggered with
the proposed uses.
6a. Conformance with Article 4 - Community Design Provisions: Transportation
Facilities and Access (38.400)
Meets Code?
Streets 38.400.010 Yes
Street and road dedication 38.400.020 NA
Access easements Yes
Level of Service
38.400.060
Yes Transportation grid adequate to serve site Yes
Comments: Adjacent streets exist to serve the site. A traffic impact study was provided and reviewed by
engineering. Level of service standards for arterial and collector streets serving the site was evaluated by
engineering. A Waiver of Right to Protest Creation of Special Improvement Districts (SID’s) for future
transportation improvements was provided by the applicant for Northwest Crossing Subdivision Phase 1
ensuring participation in funding of future infrastructure improvements that may be required to offset
impacts created by development of the property. Review of roadway design and guarantee of completion
was conducted with the Northwest Crossing Subdivision Phase 1 final plat application.
Sidewalks 38.400.080 Yes
Comments: Sidewalks are to be provided along the primary street frontages.
Drive access 38.400.090 Access to site: 3 Yes
Fire lanes, curbs, signage and striping Yes
Comments: 3 drive accesses are proposed to the lot; engineering evaluated the drive accesses for
spacing and design standards.
Street vision triangle 38.400.100 Yes
Transportation pathways 38.400.110 NA
Pedestrian access easements for shared use pathways and similar transportation
facilities
NA
Public transportation 38.400.120 Yes
Comments: No new transportation pathways are proposed. No public access easements are proposed.
The application is meeting lot and block standards, which were reviewed with the Northwest Crossing,
Phase 1 subdivision. The applicant reached out to HRDC regarding future public transportation
opportunities, but no response was provided. A covered transit stop is provided at Gallatin High School,
approximately a quarter mile to the east along Oak Street.
6b. Conformance with Article 4 – Community Design Provisions: Community
Design and Elements (38.410)
Meets Code?
Neighborhood centers 38.410.020 NA
Comments: This project does not trigger neighborhood center requirements.
Lot and block standards 38.410.030-040 Yes
Midblock crossing: rights of way for pedestrians alternative block delineation NA
Comments: This project does not trigger lot and block standards.
Staff Report
Icon at Northwest Crossing Phase 2 Site Plan
Application No. 21435
November 9, 2022
Page 13 of 17
If the development is adjacent to an existing or approved public park or public open
space area, have provisions been made in the plan to avoid interfering with public
access to and use of that area
NA
Provisions for utilities including efficient public services and utilities 38.410.050-060 Yes
Easements (City and public utility rights-of-way etc.) Yes
Water, sewer, and stormwater Yes
Other utilities (electric, natural gas, communications) Yes
CIL of water Yes
Comments: Requirements were reviewed by engineering. CIL of water rights payment is required prior to
final site plan approval. The application is proposing adequate easements and utilities.
Municipal infrastructure requirements 38.410.070 Yes
Comments: Municipal water, sanitary sewer, and storm sewer systems proposed with this project have
been reviewed by engineering.
Grading & drainage 38.410.080 Yes
Location, design and capacity of stormwater facilities Yes
Stormwater maintenance plan Yes
Landscaping: native species, curvilinear, 75% live vegetation 38.410.080.H NA
Comments: Location, design and capacity of stormwater facilities was reviewed by engineering. No surface
stormwater facilities are proposed.
Watercourse setback 38.410.100 NA
Watercourse setback planting plan 38.410.100.2.f NA
6c. Conformance with Article 4 – Community Design Provisions: Park and
Recreation Requirements (38.420)
Meets Code?
Parkland requirements 38.420.020.A Improvements In Lieu & Park Development Yes
Cash donation in lieu (CIL) 38.420.030 Yes
Improvements in-lieu Yes
Comments: Required parkland is to be provided via a combination of new park with baseline
improvements, and improvements-in-lieu of parkland above and beyond the baseline. A new park totaling
0.75 acres is to be provided directly to the west of the project is proposed to be built with this application.
The applicant proposes improvements to include natural play features, covered picnic tables, benches,
fitness stations, bike racks, and open usable yard area. The park design was reviewed against Parks
standards by the Parks Department. The applicant must provide an approved CIL/IIL proposal prior to
final site plan approval.
Park Frontage 38.420.060 Yes
Park development 38.420.080 Yes
Recreation pathways 38.420.110 Yes
Park/Recreational area design Yes
Comments: The proposed master park plan for the development of the adjacent park was reviewed by
the Parks Department. The applicant must provide an approved park design prior to final site plan
approval.
7a. Conformance with Article 5 – Project Design: Block Frontage Standards
(38.510)
Meets Code?
Block frontage classification Mixed – Landscaped & Special Residential Yes
Departure criteria None NA
Staff Report
Icon at Northwest Crossing Phase 2 Site Plan
Application No. 21435
November 9, 2022
Page 14 of 17
Comments: West Oak, Rosa Way, Wellspring Dr., Twin Lakes Ave., and Harvest Parkway are all designated
Mixed block frontages, with the applicant developing within the Mixed-landscaped requirements. The one
exception is Wellspring Dr. east of Twin Lakes Ave; this portion is designated storefront per the subdivision
and master site plan review proposal by the applicant. For the Mixed-landscaped frontages, the project
meets the following:
Building placement – All buildings facing a street frontage are placed 10-feet or more as required.
Façade transparency – 15% overall transparency required for the façade facing the street. The
carriage buildings (type A) are meeting the overall transparency requirement of 15%. The type B
buildings have an overall transparency of 32% meeting the standard, and type C buildings have an
overall transparency of 27%.
Parking location, and sidewalk width requirements. Parking must be placed to the side, rear, below
or above uses. Parking areas are limited to 50% of the street frontage. The application is meeting
these standards for Harvest Parkway (0% parking frontage), Rosa Way (less than 50% parking
frontage), West Oak Street (0% parking frontage), Twin Lakes Ave. (less than 50% parking
frontage), and Wellspring Drive (where mixed less than 50% parking frontage). A 6-foot wide
sidewalk is proposed along West Oak Street meeting the arterial sidewalk standard, All other
sidewalks are proposed at the required 5-foot width.
Front building entrances with 3-foot deep weather protection are proposed to individual unit
entrances and shared entrances for the buildings facing the street (see the North and South Site
plans). Building Types B, C, and B-Alt propose a single shared entrance facing the street with a
sidewalk connection. The carriage buildings (Type A) propose individual unit entrances.
Special residential block frontage is for residences with ground floor living spaces facing a sidewalk or
pedestrian path in a residential development. This standard requires the applicant to pick from one of the
public/private transition elements described in the section. The applicant has opted for the raised deck or
porch option. This requires a minimum 60 SF porch or deck raised at least one foot above grade. The
ground level patios provided, meet these standards.
7b. Conformance with Article 5 – Project Design: Site Planning and Design
Elements (38.520)
Meets Code?
Design and arrangement of the elements of the plan (e.g., buildings, circulation, open
space and landscaping, etc.) so that activities are integrated with the organizational
scheme of the community, neighborhood, and other approved development and produce
an efficient, functionally organized and cohesive development
Yes
Relationship to adjacent properties 38.520.030 NA
Non-motorized circulation and design systems to enhance convenience and safety
across parking lots and streets, including, but not limited to paving patterns, pathway
design, landscaping and lighting 38.420.040
Yes
Comments: Pedestrian paths through the site connecting residents to the public sidewalk, open space,
service areas, and parking areas meet the standards in this section for location, connections, and widths.
Design of vehicular circulation systems to assure that vehicles can move safely and
easily both within the site and between properties and activities within the general
community 38.420.050
Yes
Internal roadway design 38.520.050.D NA
Comments: Internal vehicular standards are met. Driveways are shared and spaced appropriately
according to engineering standards. No internal roadways are proposed.
On-site open space 38.520.060
Total required 16,900 square feet Yes
Total provided 57,319 square feet Yes
Staff Report
Icon at Northwest Crossing Phase 2 Site Plan
Application No. 21435
November 9, 2022
Page 15 of 17
Comments: Lot 15 in Phase 2 is proposed with 5,391 SF of shared open space with Open Space D (See
open space detail sheet OS001). This area provides walkways, a shade shelter and outdoor kitchen,
tables and seating, play stumps for kids, and 2 hammocks. The remaining open space is to be completed
with Phase 1 and is required to be shared across both phases via a legal framework that must be
provided prior to final plan approval. In phase 1, Lot 1 proposes 3,821 SF of shared open space with
Open Space A. This area provides a fenced dog park area with artificial turf, pet stations, bike racks, and
seating. Lot 13 is proposed with 5,765 SF of shared open space with Open Space C. This space also
features a fenced dog park area with the same amenities listed above and the addition of dog agility
equipment. The largest shared open space area in phase 1 is proposed in Open Space B. This space is
proposed adjacent to the clubhouse building totaling 27,031 SF. Proposed shared amenities include a
pool with associated seating, and outdoor kitchen, hammocks, a fire pit with seating, shade structures, 2
bar gardens with TV’s, picnic tables, and lounge seating, corn hole, and a bike repair station. Shared
open space totals 42,008 SF. Additional open space is to be provided via indoor recreational areas in the
clubhouse building. The ground floor plan of the clubhouse is proposed to provide exercise space and
equipment, a “great room” with adjacent outdoor patio, and a gaming room. The upper level floor plan
shows co-work spaces, another game and poker room, a boardroom, and an outdoor balcony. In order to
meet the code requirements for indoor recreational areas these spaces must be visible, which they are
meeting with a centrally located clubhouse, and be designed to serve interior recreational functions with
amenities and design elements that encourage use, which this application is meeting. These spaces total
8,160 SF. Additional open space is proposed via balconies. Balconies may account for up to 50% of the
required open space and must be at least 36 square feet with no dimension less than 6-feet. The
proposed apartment balconies on the second and third floors meet the requirements of this section and
total 7,151 SF. Lastly open space may be provided via ground level private outdoor open space. For
units with ground level patios, in order to qualify towards required open space, the patios must be
screened by a fence or hedge at least 32 inches high. No such screening is proposed for the ground level
patios therefore those areas will not count towards required open space.
Location and design of service areas and mechanical equipment 38.520.070 Yes
Comments: For the apartment buildings (Types B and C) mechanical equipment is to be housed on the
roof, and hidden behind the parapet wall. For the Type A/Carriage buildings, mechanical units are to be
housed at ground level and screened via landscaping. Utility meters are to be screened by landscaping.
Sheet LS508 shows a row of coniferous shrubs used to screen mechanical equipment and utilities. Code
provision 7 requires the planting plans to be updated to reflect this plan shown in the architectural
drawings. Solid waste will be collected via multiple dumpster enclosures on each lot. The enclosures
meet the screening standards in this section and adequate adjacent landscaping is provided.
7c. Conformance with Article 5 – Project Design: Building Design (38.530) Meets Code?
Compatibility with, and sensitivity to, the immediate environment of the site and the
adjacent neighborhoods and other approved development 38.530.030
Yes
Building massing and articulation 38.530.040 Yes
Building details, materials, and blank wall treatments 38.530.050-070 Yes
Comments: The buildings proposed with this application are meeting the building design standards of this
section. For building type B and C use of vertical elements, patios, roofline modulation with varied
parapet lines, and material changes provide required modulation. For building type A, the carriage
buildings, these two-story buildings have pitched roofs with dormer ends with contrasting siding providing
modulation of the façade along the second floor. The building also provides articulation with building
entrances and balconies. For all buildings, cementitious wallboards are the dominant siding material and
are meeting the requirement that the design integrate a mix of colors and textures. The designs proposed
with cementitious boards are vertically oriented board & batten, and horizontal lap in various colors. Blank
walls are present along the east and west building end elevations for the carriage buildings. Code
Staff Report
Icon at Northwest Crossing Phase 2 Site Plan
Application No. 21435
November 9, 2022
Page 16 of 17
7d. Conformance with Article 5 – Parking (38.540) Meets Code?
Parking requirements 38.540.050 Yes Yes
Parking requirements residential 38.540.050.A.1 256 spaces
Reductions residential 38.540.050.A.1.b NA
Parking requirements nonresidential
38.540.050.A.2
NA
Reductions nonresidential 38.540.050.A.2.c NA
Provided off-street 217
Provided on-street 53
Bicycle parking 38.540.050.A.4 84 – includes covered
parking in Phase 1.
Comments: Parking is proposed to be provided for the 64 1-bedroom units, 50 2-bedroom units, and 20
3-bedroom units via surface parking lots, private garages with stacked spaces, and an on-street parking
reduction. The 256 spaces required less the available 53 on-street spaces yields a required off-street
total of 203 parking spaces. 217 off-street spaces are proposed. The provided off-street parking does not
exceed the maximum parking provision of 125% the required minimum. Each stall provided off-street
meets the stall, aisle, and driveway design requirements of Section 38.540.020. Bike parking will be
provided adjacent to each building with compliant U-style bike racks, with covered bike parking to be
provided within the clubhouse building to be built with Phase 1.
Loading and uploading area requirements 38.540.080 NA
First berth – minimum 70 feet length, 12 feet in width, 14 feet in height NA
Additional berth – minimum 45 feet length NA
Comments: NA
7e. Conformance with Article 5 – Landscaping (38.550) Meets Code?
Mandatory landscaping requirements 38.550.050 Yes
Drought tolerant species 75% required Yes
Parking lot landscaping Yes
Additional screening Yes
Street frontage Yes
Street median island NA
Acceptable landscape materials Yes
Protection of landscape areas NA
Irrigation: plan, water source, system type Yes
Residential adjacency Yes
Comments: The provided landscaping plan conforms to standards.
Landscaping of public lands 38.550.070 Yes
Comments: Street trees will be provided along Rosa Way, Twin Lakes Avenue, Wellspring Drive, and
Harvest Parkway. Proposed tree species for public landscaping were reviewed by the Forestry Division.
7f. Conformance with Article 5 – Signs (38.560) Meets Code?
Allowed SF/building 38.560.060 NA NA
Proposed SF/building NA NA
Comments: Conceptual signage is proposed with this application. Sign size, location, and design will be
reviewed with subsequent sign permits.
7g. Conformance with Article 5 – Lighting (38.560) Meets Code?
provision 6 requires the applicant to update the landscaping plans to revise the planting bed locations
along these blank walls to be located in front of each wall.
Staff Report
Icon at Northwest Crossing Phase 2 Site Plan
Application No. 21435
November 9, 2022
Page 17 of 17
Site lighting (supports, cutoff, footcandles, temperature) 38.570.040 NA
Building-mounted lighting (supports, cutoff, footcandles, temperature) 38.570.040.B Yes
Comments: 10 types of site lighting are proposed. These include parking lot pole mounted lighting, wall
mounted lighting, low profile bollard lights to illuminate walkways, accent lighting at the open spaces, and
streetlights. Code provision 8 requires revised drawings to show proposed string lights modified with
covers to meet full cutoff compliance. All other proposed lighting meets the cutoff and intensity
requirements of this section.
8. Conformance with Article 6 – Natural Resource Protection Meets Code?
Floodplain regulations 38.600 NA
Wetland regulations 38.610 NA
Comments: NA
9. Relevant Comment from Affected Parties (38.220) Meets Code?
Public Comment Yes
Comments: A public notice period was conducted meeting the requirements of this section and detailed on
page 1 of this report. No public comment was received.
10. Division of Land Pertaining to Subdivisions (38.240-Part 4) Meets Code?
Subdivision exemptions NA
Required easements NA
Comments: Code provision 4 requires original copies of all required public easements prior to site plan
approval. Due to amenities being shared across 3 lots separated by public right of way, the applicant is
required, with code provision 5, to provide legal access to shared amenities prior to final plan approval.