Loading...
HomeMy WebLinkAbout016 A11 BldgF,G,H&I-ElevationsMATERIAL LEGEND CEMENTITIOUS BOARD AND BATTEN (SW 7069 IRON ORE) STANDING SEAM METAL ROOF ASPHALT ROOF SHINGLES. COLOR TBD BY OWNER 7" CEMENTITIOUS SIDING (SW 7661 REFLECTION) 7" CEMENTITIOUS SIDING (SW 7019 GAUNTLET GRAY) 7" CEMENTITIOUS SIDING (WOODTONE: RIVER ROCK) CONCRETE SPLIT-FACE CMU BLOCK 7" CEMENTITIOUS SIDING (SW 7069 IRON ORE) METAL COPING (SW 6258 TRICORN BLACK) TRIM (SW 7069 IRON ORE) ADHERED STONE VENEER (LIMESTONE HURON)BUILDING HEIGHT11'-7 1/8"1 1/2" / 1'-0"34 37 35 08 BUILDING HEIGHT11'-6"1 1/2" 1'-0" 34 37 08 BUILDING HEIGHT11'-6"1 1/2" 1'-0" 34 37 08 BUILDING HEIGHT11'-6"34 37 32 08 42 4543 42 4345 42 4543 1/4" 1'-0" 42 4543 BUILDING HEIGHT17'-0"0310371101 BUILDING HEIGHT17'-0"011011 0337 BUILDING HEIGHT17'-0"0310371101 BUILDING HEIGHT17'-0"0310013711 8'-0"RE: PLAN 58 59 2555 WALNUT STREET DENVER, COLORADO 80205 www.kephart.com K E P H A R T community planning architecture COPYRIGHT ©Project Architect Project Designer Date Job Number Drawn By Checked By Title Sheet Number 8/18/2022 12:09:59 PMC:\RevitLocalFiles\218052_Graf St_Apartments_ScottKSWB3G.rvt2131 GRAF2131 GRAF ST.BOZEMAN, MT 597182021DVL A11 DVL 04.15.2021 218052 SK JG BLDG F, G, H & I ELEVATIONS KEYNOTES NO.NOTE 01 COMPOSITE ASPHALT ROOF SHINGLES - OWENS CORNING "ESTATE GRAY" 03 CEMENTITIOUS BOARD & BATTEN SIDING (HARDIE PANEL HL5 AS BASIS OF DESIGN) - SHERWIN WILLIAMS SW7069 "IRON ORE" 08 CONCRETE SPLIT-FACE CMU BLOCK 10 CEMENTITIOUS TRIM - SHERWIN WILLIAMS SW7069 "IRON ORE" 11 PRE-MANUFACTURED METAL GUTTER - BERRIDGE "CHARCOAL GRAY" 32 DECORATIVE METAL GATE - POWDERCOAT, BERRIDGE "CHARCOAL GRAY" 34 CONCRETE CAP 35 STANDING SEAM METAL ROOFING 37 CEMENTITIOUS ROOF FASCIA - SHERWIN WILLIAMS SW7069 "IRON ORE" 42 STEEL COLUMN - PER DESIGN BUILD 43 METAL CANOPY - PER DESIGN BUILD 45 METAL BEAM - PER DESIGN BUILD 58 3X3 BLACK METAL POST W/ CAP 59 WELDED WIRE MESH 1/8" = 1'-0"8 TRASH ENCLOSURE - REAR ELEVATION 1/8" = 1'-0"7 TRASH ENCLOSURE - RIGHT ELEVATION 1/8" = 1'-0"6 TRASH ENCLOSURE - LEFT ELEVATION 1/8" = 1'-0"5 TRASH ENCLOSURE - FRONT ELEVAVTION 1/8" = 1'-0"9 COVER BIKE PARKING FRONT ELEVATION - BLDG H 1/8" = 1'-0"12 COVER BIKE PARKING LEFT ELEVATION - BLDG H 1/8" = 1'-0"10 COVER BIKE PARKING RIGHT ELEVATION - BLDG H 1/8" = 1'-0"11 COVER BIKE PARKING REAR ELEVATION - BLDG H No. Date Issue 07.25.19 SDP SET 1 02.18.20 SDP RESUBMITTAL 2 08.14.20 SITE PLAN RESUBMITTAL 2 4 12.03.20 SDP RESUBMITTAL 3 5 08.15.21 SDP RESUBMITTAL 4 6 08.19.22 MSP MODIFICATION 1/8" = 1'-0"13 PARK PAVILLION FRONT ELEVATION - BLDG I 1/8" = 1'-0"14 PARK PAVILLION LEFT ELEVATION - BLDG I 1/8" = 1'-0"15 PARK PAVILLION REAR ELEVATION - BLDG I 1/8" = 1'-0"16 PARK PAVILLION RIGHT ELEVATION - BLDG I 1/8" = 1'-0"18 ELECTICAL EQUIP. SCREEN ELEVATION @ BLDG #4 & #6 6