Ms. Susana Montana
City of Bozeman
20 East Olive St.
Bozeman,MT 59771
Reference: Site Plan Modifications for Master Site Plan Applications for 2131 Graf Apartments Homes (City
of Bozeman Application#19308)
Dear Ms.Montana:
Please find below a summary of the Master Site Plan modifications for the 2131 Graf Apartment Homes
project (City of Bozeman Application#19308)
The following revisions are applicable to the Master Site Plan for the above referenced project:
Site Revisions:
Cover Sheet-Madison
1. Pervious area calculation updated
2. Floor area ratio updated
3. Vehicle parking summary updated
4. Sheet index updated to include B-Alt Building plan sheets and open space structure plan sheets
5. Open space area summary updated
Sheet C0A—CMP - Madison
1. Phase I site plan modified:
a. Building footprint for Building#1 (clubhouse) modified
b. Open space area and parking around building#1 modified
c. Dumpster on south side of Building#5 removed
d. Open Space Area A modified to include a putting green
e. Open Space Area F modified to include additional shade structures, grilling stations, pizza
oven and outdoor recreation areas
f. Two sidewalk connections from Building#4 to Lantern Street right-of-way eliminated
g. Two sidewalk connections from Building#2 to South 215t Avenue right-of-way eliminated
h. Sidewalk locations from Building#5 to west trail modified
i. Two sidewalk connections from Building#6, 7,and 8 to paved pedestrian trail eliminated
j. Two sidewalk connections from Building#2 to South 2Pt Avenue right-of-way eliminated
k. Two sidewalk connections from Building#9 to east trail eliminated
1. Addresses changed on all buildings
Sheet C0.2—Utility Plan-Madison
1. Phase I site plan modified:
a. Building footprint for Building#1 (clubhouse)modified
b. Open Space Area F pavilion structure modified
c. Addresses changed on all buildings
2. Future phase site plan modified:
a. Building#18 changed to Type B-alt
b. Building#12 changed to Type B
c. Addresses changed on all buildings
Sheet C0.3—Phasing Plan-Madison
1. Phase I site plan modified:
a. Building footprint for Building#1 (clubhouse) modified
b. Open space area and parking around building#1 modified
c. Dumpster on south side of Building#5 removed
d. Open Space Area A modified to include a putting green
e. Open Space Area F modified to include additional shade structures, grilling stations, pizza
oven and outdoor recreation areas
f. Two sidewalk connections from Building#4 to Lantern Street right-of-way eliminated
g. Two sidewalk connections from Building#2 to South 215t Avenue right-of-way eliminated
h. Sidewalk locations from Building#5 to west trail modified
i. Two sidewalk connections from Building#6,7,and 8 to paved pedestrian trail eliminated
j. Two sidewalk connections from Building#2 to South 2Vt Avenue right-of-way eliminated
k. Two sidewalk connections from Building#9 to east trail eliminated
1. Addresses changed on all buildings
2. Future phase site plan modified:
a. Building#18 changed to Type B-alt
b. Building#12 changed to Type B
c. Addresses changed on all buildings
d. Dumpster eliminated on north side of Building#20
e. Open Space Area H size modified
f. Building#17 (Clubhouse) footprint modified
g. Pool area and associated amenity area modified
h. Parking modified on south side of Building#17
i. Dumpster removed on south side of Building#17
j. Open Space Area J size modified
k. Open Space Area L size modified
1. Dumpster added at west side of Building#11
m. Building#11 mirrored
Sheet C0.4—Parking Plan- Madison
1. Phase I site plan modified:
a. Building footprint for Building#1 (clubhouse) modified
b. Open space area and parking around building#1 modified
c. Dumpster on south side of Building#5 removed
d. Open Space Area A modified to include a putting green
e. Open Space Area F modified to include additional shade structures, grilling stations, pizza
oven and outdoor recreation areas
f. Two sidewalk connections from Building#4 to Lantern Street right-of-way eliminated
g. Two sidewalk connections from Building#2 to South 2V Avenue right-of-way eliminated
h. Sidewalk locations from Building#5 to west trail modified
i. Two sidewalk connections from Building#6,7,and 8 to paved pedestrian trail eliminated
j. Two sidewalk connections from Building#2 to South 2Pt Avenue right-of-way eliminated
k. Two sidewalk connections from Building#9 to east trail eliminated
1. Addresses changed on all buildings
2. Future phase site plan modified
a. Building#18 changed to Type B-alt
b. Building#12 changed to Type B
c. Addresses changed on all buildings
d. Dumpster eliminated on north side of Building#20
e. Open Space Area H size modified
f. Building#17 (Clubhouse) footprint modified
g. Pool area and associated amenity area modified
h. Parking modified on south side of Building#17
i. Dumpster removed on south side of Building#17
j. Open Space Area J size modified
k. Open Space Area L size modified
1. Dumpster added at west side of Building#11
in. Building#11 mirrored
3. Future phases East and West parking calculations modified.
Sheet C0.5—Grading Plan-Madison
1. Phase I site plan modified:
a. Building footprint for Building#1 (clubhouse) modified
b. Open space area and parking around building#1 modified
c. Dumpster on south side of Building#5 removed
d. Open Space Area A modified to include a putting green
e. Open Space Area F modified to include additional shade structures, grilling stations, pizza
oven and outdoor recreation areas
£ Two sidewalk connections from Building#4 to Lantern Street right-of-way eliminated
g. Two sidewalk connections from Building#2 to South 211,Avenue right-of-way eliminated
h. Sidewalk locations from Building#5 to west trail modified
i. Two sidewalk connections from Building#6,7,and 8 to paved pedestrian trail eliminated
j. Two sidewalk connections from Building#2 to South 21st Avenue right-of-way eliminated
k. Two sidewalk connections from Building#9 to east trail eliminated
1. Addresses changed on all buildings
2. Future phase site plan modified
a. Building#18 changed to Type B-alt
b. Building#12 changed to Type B
c. Addresses changed on all buildings
d. Dumpster eliminated on north side of Building#20
e. Open Space Area H size modified
f. Building#17 (Clubhouse) footprint modified
g. Pool area and associated amenity area modified
h. Parking modified on south side of Building#17
i. Dumpster removed on south side of Building#17
j. Open Space Area J size modified
k. Open Space Area L size modified
1. Dumpster added at west side of Building#11
in. Building#11 mirrored
Sheet C1.5—Drainage Plan-Madison
1. Phase I site plan modified:
a. Building footprint for Building#1 (clubhouse) modified
b. Open space area and parking around building#1 modified
c. Dumpster on south side of Building#5 removed
d. Open Space Area A modified to include a putting green
e. Open Space Area F modified to include additional shade structures, grilling stations, pizza
oven and outdoor recreation areas
f. Two sidewalk connections from Building#4 to Lantern Street right-of-way eliminated
g. Two sidewalk connections from Building#2 to South 215t Avenue right-of-way eliminated
h. Sidewalk locations from Building#5 to west trail modified
i. Two sidewalk connections from Building#6,7, and 8 to paved pedestrian trail eliminated
j. Two sidewalk connections from Building#2 to South 2Pt Avenue right-of-way eliminated
k. Two sidewalk connections from Building#9 to east trail eliminated
1. Addresses changed on all buildings
Sheet C1.6—Drainage Plan-Madison
1. Future phase site plan modified
a. Building#18 changed to Type B-alt
b. Building#12 changed to Type B
c. Addresses changed on all buildings
d. Dumpster eliminated on north side of Building#20
e. Open Space Area H size modified
f. Building#17 (Clubhouse) footprint modified
g. Pool area and associated amenity area modified
h. Parking modified on south side of Building#17
i. Dumpster removed on south side of Building#17
j. Open Space Area J size modified
k. Open Space Area L size modified
1. Dumpster added at west side of Building#11
m. Building#11 mirrored
210
Sheet A4—Bldg.D&E Floor Plans
1. Details 3 and 4 modified to reflect updated clubhouse floor plans
Sheet A5—Bldg. F,G,H&I Floor Plans
1. Details 1 and 2 eliminated(previous open space pavilion design is no longer used)
Sheet A10—Bldg. D& E Elevations
1. Details 5-8 modified to reflect current clubhouse elevation design
Sheet A11—Bldg. F,G,H& I Elevations
1. Details 1-4 eliminated (previous open space pavilion design is no longer used)
Sheet A17—Materials Board
1. Finish materials and colors updated
Arch i tectutal Additions-XeDh-M
Sheet AX—Bldg. B-ALT Floor Plans
Sheet AX—Bldg. B-ALT Elevations
Sheet A1.0—A3.0—Details of Structures within Open Space Area F
If you have any questions,please feel to call anytime at (406) 582-8100.
Sincerely,
Paul Connelly
Owner's Representative
Graf Apartments,LLC
Will Ralph,PE,LEED AP
Vice President of Development
Graf Apartments,LLC