Loading...
HomeMy WebLinkAbout11-15-22 Public Comment - M. Brown - Walker Subdivision Annexation Section 4 - 2. Per BMC 38.400.80.A. City standard sidewalks ate must be constructed along all public or private streets. A 10 foot multiuse pathway may be required to be constructed along Campbell Road. Sidewalk/path will need to be installed with the construction of the proposed project presented in Concept Application No. 21-451.