Loading...
HomeMy WebLinkAbout22305 Application SummaryBOZEMANMT Community Development DEVELOPMENT REVIEW APPLICATION Remember to obtain owner signature on this form prior to uploading w ith the rest of your submittal PROJECT INFORMATION Project Name:Nexus Point Phase 2 Project Type(s):Site Plan SP Street Address:Nexus Point Phase 2, West of S 19th Ave, connecting to Lantern and Discovery Drive Legal Description: MINOR SUB 235B, S23, T02 S, R05 E, LOT 1, PLAT J-284 Description of Project: Site development. Current Zoning:R-5 Residential Mixed-Use High Density District Existing Use:Residential Proposed Use:Mixed Gross Lot Area:232 Number of Buildings:4 Type and Number of Dwellings: 142 Building Size (SF): 53100 Non-Residential Building Size (SF): 1937 Building Height (ft):155.54 Affordable Housing (Y/N):No Departure/Deviation Request (Y/N): No Zoning Verification Expedited (Y/N): No PROPERTY OWNER Company Name: Nexus Point LLC Name: Steve Moore Full Address: 3661 Jagar Lane, Bozeman, MT 59718 Email:steve@smadvisorygroup.com Phone:(406) 599-5169 APPLICANT Company Name: Madison Engineering Name: Joshua Wolfram Full Address: 895 Technology Blvd, Suite 203 , Bozeman, Montana 59718 Email:josh.w@mad-eng.com Phone:(406) 586-0262 219,127.53219,127.53 REPRESENTATIVE Company Name: Madison Engineering Name: Chris Budeski Full Address: 895 Technology Blvd 203, Bozeman, Montana 59718 Email:chris@mad-eng.com Phone:(406) 586-0262 CERTIFICATIONS AND SIGNATURES Applicant signature is captured electronically at time of application submittal. This application PDF must also be signed by the property owner(s) for all application types before the submittal w ill be accepted. The only exception to this is an informal review application that may be signed by the applicant(s) only. The applicant(s) and property owner(s) submit this application for review under the terms and provisions of the Bozeman Municipal Code. It is further indicated that any work undertaken to complete a development approved by the City of Bozeman shall be in conformance w ith the requirements of the Bozeman Municipal Code and any special conditions established by the approval authority. I acknow ledge that the City has an Impact Fee Program and impact fees may be assessed for my project. Further, I agree to grant City personnel and other review agency representative's access to the subject site during the course of the review process (Section 38.200.050, BMC). I (We) hereby certify that the above information is true and correct to the best of my (our) know ledge. Certification of Completion and Compliance - I understand that conditions of approval may be applied to the application and that I w ill comply w ith any conditions of approval or make necessary corrections to the application materials in order to comply w ith municipal code provisions. Statement of Intent to Construct According to the Final Plan - I acknow ledge that construction not in compliance w ith the approved final plan may result in delays of pccupancy or costs to correct noncompliance. Property Owner Signature: Printed Name:Steve Moore CONTACT US Alfred M. Stiff Professional Building phone 406-582-2260 20 East Olive Street fax 406-582-2263 Bozemn, MT 59715 planning@bozeman.net www.bozeman.net/planning