Loading...
HomeMy WebLinkAbout019A E101 - Electrical Site PlanMJJJJJJJJJJSP2WDWDWDE1012E1013SP1SP2LC1LC1LC1LC1LC1LC1LC1LC1LC1LC1LC1LC1SP1SP2SP1SP2SP9SP9SP9SP9SP9SP9SP9SP9SP9SP9SP9SP9UTILITYUNDERGROUND PRIMARY SERVICE LATERAL. SEE ONE-LINEDIAGRAM FOR ADDITIONAL INFORMATION. VERIFYROUTING PRIOR TO START OF WORK.PROPOSED POWER COMPANY PAD LOCATION. WITHPROPOSED POWER COMPANY PAD MOUNTEDTRANSFORMERS FOR ELECTRIC SERVICE TO THE PROJECTBUILDING. PROVIDE CONDUIT RISERS AT PAD PER POWERCOMPANY'S REQUIREMENTS. SEE ONE-LINE DIAGRAM ONSHEET E302 FOR ADDITIONAL INFORMATIONTO POINT OF CONNECTION. VERIFYPRIOR TO START OF WORKPROPOSED POINT OF CONNECTION TOCOMMUNICATIONS SERVICES. FIELD VERIFYLOCATION WITH RESPECTIVE COMPANY'S AND CIVIL PLANS. PROVIDE CONDUIT RISER AT POLE, PER SERVICE PROVIDER'S REQUIREMENTS.COMMUNICATIONS TERMINALBOX.VERIFY FINAL LOCATION IN FIELD PRIORTO START OF WORK.TO UTILITY POINT OF CONNECTION. VERIFYPRIOR TO START OF WORK.-1MDP-1MDP-1MDP-1MDP-1MDP-3MDP-3MDP-3MDP-3MDP-3MDP-3MDP-3MDP-5MDP-7MDP-5MDP-5MDP-5MDP-7MDP-5MDP-9MDP-9MDP-9MDPROUTE UNDERGROUND COMMUNICATIONS CONDUITS TO THIS LOCATION. REFER TO ENLARGED ELECTRICAL PLAN -PAYSTATIONCANOPY & VACUUM EQUIPMENT BUILDING,THIS SHEET.ROUTE UNDERGROUND POWER CONDUITS TO THIS LOCATION. REFER TO ENLARGED ELECTRICAL PLAN -PAYSTATION CANOPY & VACUUM EQUIPMENT BUILDING,THIS SHEET.SP10SP10SP10SP10SP10SP10SP10REFER TO DETAIL PROTECTIVE BOLLARD FOR ADDITIONAL INFOMRATION.P1P1P1P1P1P1P1P1P1P1P1SP2-7MDPSP2-7MDPSP1-5MDPSP1-7MDPSP10SP10SP10MOTORIZEDGATEMOTORIZEDGATEPAYSTATIONPAYSTATIONSIGNSIGN(2)- 1"- C(2)- 1"- CSP2SP2SP3SP3SP4SP5SP6SP7SP8SP6SP7SP8LA- 7LA- 7LA- 9LA- 11LA- 13LA- 13MULTIPLE UNDERGROUND POWER& COMMUNICATIONS CONDUITS(SPARE AND USED) WITH POWERAND SYSTEMS CABLING(1)- 1"- C33448"48"48"LF1EM-11MDPLF1 EM-11MDPLF1 EM-11MDPLF1 EM-11MDPVAC1VAC2DVAC1DVAC2SP1SP1PROVIDE (1) SPARE CONDUIT FOR FUTURE POWER.PROVIDE (2) SPARE CONDUIT W/PULL WIRE FOR FUTURE LOW VOLTAGE SYSTEMS CABLING.LA- 3LA- 3LA- 3MCCMCC3/32" = 1'-0"1ELECTRIC SITE PLAN - FLOORDRAWN BY:PROJ. NO:ADDRESS:SHEET SIZE:30" x 42"#DATEDESCRIPTIONSHEET TITLE & NUMBERCHECKED BY:PROJECT INFORMATIONCopyright 2021 PROJECT REVISIONSISSUED:REVISED:SEALARCHITECTCLIENTCONSULTANTSTRUCTURALM.E.P.PROJECTCIVILA11BCDEFGHJ234567891011234567891011ABCDEFGHJ12127/22/2022 3:31:16 PME101ELECTRICAL SITEPLANEBA210392102 W. BABCOCK STREETBOZEMAN, MT 5971802/01/22TIDAL WAVETHORSON BAKER + ASSOCIATES2055 READING ROAD, SUITE 280CINCINNATI, OH 45202513.579.8200KLH ENGINEERS1538 ALEXANDRIA PIKE STE 11FORT THOMAS, KY 41075614.603.2662TIDAL WAVE AUTO SPA2102 W. BABCOCK STREETBOZEMAN, MT 59718NEW POTATO CREEK HOLDINGS, LLC124 E. THOMPSON STREETTOMASTON, GA 30286REZTARK DESIGN STUDIO, LLC601 MAIN STREET, SUITE 200CINCINNATI, OH 45202513.233.3333REZTARK DESIGN STUDIO, LLC(UNDER SEPARATE OWNER CONTRACT)MADISON ENGINEERINGBOZEMAN, MT 59718460.586.0262LGFAUTO SPANKEYED NOTESSP1 PROVIDE A NEMA 3R DISCONNECT SWITCH FOR VACUUM. COORDINATE EXACT LOCATION ANDREQUIREMENT WITH CAR VENDOR DRAWINGS PRIOR TO ROUGH-IN AND CONNECT FOROPERATION.SP2 MOTORIZED ACCESS GATE. FURNISH AND INSTALL POWER AND CONTROLS PER MANUFACTURER'SINSTRUCTIONS. INTERCONNECT CONTROLS TO PAY STATION AS REQUIRED.SP3 RECESSED ACCESS PANEL BY G.C. IN STONE FACED ENCLOSURE. ENCLOSURE TO CONTAIN PULLBOXES (POWER & LOW VOLTAGE) AND CONDUIT STUBS FROM MAIN BUILDING TO DISTRIBUTEPOWER, DATA, SECURITY, ACCESS CONTROLS, ETC. TO EQUIPMENT ASSOCIATED WITHRESPECTIVE PAY CANOPY DRIVE AISLE. REFER TO IN-GRADE BOX-HANDHOLD DETAIL FORADDITIONAL INFORMATION.SP4 POLE MOUNTED CCTV. PROVIDE 1" CONDUIT WITH PULL WIRE VIA PULL BOX TO OPERATORSTATION AND MAIN BUILDING. SCOPE OF WORK WITH G.C.SP5 ARM MOUNTED CCTV. PROVIDE 1" CONDUIT WITH PULLWIRE INTO BOOTH, DOWN WALL ANDUNDERGROUND VIA PULLBOX TO OPERATER STATION AT MAIN BUILDING. COORDINATE SCOPE OFWORK WITH G.C.SP6 PAY STATION RECESSED IN STONE FACED ENCLOSURE. PROVIDE POWER, DATA, AND ACCESSCONTROLS PER MANUFACTURE'S INSTRUCTIONS. PROVIDE NEMA 3R DISCONNECTING MEANSWITHIN ENCLOSURE.SP7 PROVIDE (1) 1-1/4" CONDUIT STUBBED INTO A ACCESSIBLE LOCATION FOR DATA/COMMUNICATIONSCABLING. COORDINATE REQUIREMENTS WITH VENDOR AND CABLING CONTRACTOR PRIOR TOROUGH-IN.SP8 PAY STATION CONNECTION (POWER & DATA). VERIFY ALL REQUIREMENTS (LOCATION, MOUNTING,CONTROLS, ETC) PRIOR TO ROUGH-IN WITH OWNER, ARCHITECT AND INSTALLER.SP9 VERIFY FINAL MOUNTING, MOUNTING HEIGHT, LOCATION, ETC. FOR LIGHT FIXTURE 'LC1' WITH G.C.,OWNER AND ARCHITECT PRIOR TO ROUGH-IN AND INSTALLATION.SP10 REFER TO CONTACTOR SCHEDULE AND DIAGRAM ON SHEET E001 FOR ADDITIONAL INFORMATION.50% ON/OFF DUSK TILL DAWN VIA PHOTOCELL (HALF THE LIGHT POLES), 50% ON/OFF VIAPHOTOCELLBUT FORCED OFF VIA TIMECLOCK AFTER HOURS (CANOPY LIGHTS AND HALF THE LIGHT POLES).1/4" = 1'-0"2ENLARGED PAY STATION CANOPY1/4" = 1'-0"3ENLARGED VACUUM EQUIPMENT STATION 12 07.22.22 Site Updates2222MJJJJJJJJJJSP2WDWDWDE1012E1013SP1SP2LC1LC1LC1LC1LC1LC1LC1LC1LC1LC1LC1LC1SP1SP2SP1SP2SP9SP9SP9SP9SP9SP9SP9SP9SP9SP9SP9SP9UTILITYUNDERGROUND PRIMARY SERVICE LATERAL. SEE ONE-LINEDIAGRAM FOR ADDITIONAL INFORMATION. VERIFYROUTING PRIOR TO START OF WORK.PROPOSED POWER COMPANY PAD LOCATION. WITHPROPOSED POWER COMPANY PAD MOUNTEDTRANSFORMERS FOR ELECTRIC SERVICE TO THE PROJECTBUILDING. PROVIDE CONDUIT RISERS AT PAD PER POWERCOMPANY'S REQUIREMENTS. SEE ONE-LINE DIAGRAM ONSHEET E302 FOR ADDITIONAL INFORMATIONTO POINT OF CONNECTION. VERIFYPRIOR TO START OF WORKPROPOSED POINT OF CONNECTION TOCOMMUNICATIONS SERVICES. FIELD VERIFYLOCATION WITH RESPECTIVE COMPANY'S AND CIVIL PLANS. PROVIDE CONDUIT RISER AT POLE, PER SERVICE PROVIDER'S REQUIREMENTS.COMMUNICATIONS TERMINALBOX.VERIFY FINAL LOCATION IN FIELD PRIORTO START OF WORK.TO UTILITY POINT OF CONNECTION. VERIFYPRIOR TO START OF WORK.-1MDP-1MDP-1MDP-1MDP-1MDP-3MDP-3MDP-3MDP-3MDP-3MDP-3MDP-3MDP-5MDP-7MDP-5MDP-5MDP-5MDP-7MDP-5MDP-9MDP-9MDP-9MDPROUTE UNDERGROUND COMMUNICATIONS CONDUITS TO THIS LOCATION. REFER TO ENLARGED ELECTRICAL PLAN -PAYSTATIONCANOPY & VACUUM EQUIPMENT BUILDING,THIS SHEET.ROUTE UNDERGROUND POWER CONDUITS TO THIS LOCATION. REFER TO ENLARGED ELECTRICAL PLAN -PAYSTATION CANOPY & VACUUM EQUIPMENT BUILDING,THIS SHEET.SP10SP10SP10SP10SP10SP10SP10REFER TO DETAIL PROTECTIVE BOLLARD FOR ADDITIONAL INFOMRATION.P1P1P1P1P1P1P1P1P1P1P1SP2-7MDPSP2-7MDPSP1-5MDPSP1-7MDPSP10SP10SP10MOTORIZEDGATEMOTORIZEDGATEPAYSTATIONPAYSTATIONSIGNSIGN(2)- 1"- C(2)- 1"- CSP2SP2SP3SP3SP4SP5SP6SP7SP8SP6SP7SP8LA- 7LA- 7LA- 9LA- 11LA- 13LA- 13MULTIPLE UNDERGROUND POWER& COMMUNICATIONS CONDUITS(SPARE AND USED) WITH POWERAND SYSTEMS CABLING(1)- 1"- C33448"48"48"LF1EM-11MDPLF1 EM-11MDPLF1 EM-11MDPLF1 EM-11MDPVAC1VAC2DVAC1DVAC2SP1SP1PROVIDE (1) SPARE CONDUIT FOR FUTURE POWER.PROVIDE (2) SPARE CONDUIT W/PULL WIRE FOR FUTURE LOW VOLTAGE SYSTEMS CABLING.LA- 3LA- 3LA- 3MCCMCC3/32" = 1'-0"1ELECTRIC SITE PLAN - FLOORDRAWN BY:PROJ. NO:ADDRESS:SHEET SIZE:30" x 42"#DATEDESCRIPTIONSHEET TITLE & NUMBERCHECKED BY:PROJECT INFORMATIONCopyright 2021 PROJECT REVISIONSISSUED:REVISED:SEALARCHITECTCLIENTCONSULTANTSTRUCTURALM.E.P.PROJECTCIVILA11BCDEFGHJ234567891011234567891011ABCDEFGHJ12127/22/2022 3:31:19 PME101ELECTRICAL SITEPLANEBA210392102 W. BABCOCK STREETBOZEMAN, MT 5971802/01/22TIDAL WAVETHORSON BAKER + ASSOCIATES2055 READING ROAD, SUITE 280CINCINNATI, OH 45202513.579.8200KLH ENGINEERS1538 ALEXANDRIA PIKE STE 11FORT THOMAS, KY 41075614.603.2662TIDAL WAVE AUTO SPA2102 W. BABCOCK STREETBOZEMAN, MT 59718NEW POTATO CREEK HOLDINGS, LLC124 E. THOMPSON STREETTOMASTON, GA 30286REZTARK DESIGN STUDIO, LLC601 MAIN STREET, SUITE 200CINCINNATI, OH 45202513.233.3333REZTARK DESIGN STUDIO, LLC(UNDER SEPARATE OWNER CONTRACT)MADISON ENGINEERINGBOZEMAN, MT 59718460.586.0262LGFAUTO SPANKEYED NOTESSP1 PROVIDE A NEMA 3R DISCONNECT SWITCH FOR VACUUM. COORDINATE EXACT LOCATION ANDREQUIREMENT WITH CAR VENDOR DRAWINGS PRIOR TO ROUGH-IN AND CONNECT FOROPERATION.SP2 MOTORIZED ACCESS GATE. FURNISH AND INSTALL POWER AND CONTROLS PER MANUFACTURER'SINSTRUCTIONS. INTERCONNECT CONTROLS TO PAY STATION AS REQUIRED.SP3 RECESSED ACCESS PANEL BY G.C. IN STONE FACED ENCLOSURE. ENCLOSURE TO CONTAIN PULLBOXES (POWER & LOW VOLTAGE) AND CONDUIT STUBS FROM MAIN BUILDING TO DISTRIBUTEPOWER, DATA, SECURITY, ACCESS CONTROLS, ETC. TO EQUIPMENT ASSOCIATED WITHRESPECTIVE PAY CANOPY DRIVE AISLE. REFER TO IN-GRADE BOX-HANDHOLD DETAIL FORADDITIONAL INFORMATION.SP4 POLE MOUNTED CCTV. PROVIDE 1" CONDUIT WITH PULL WIRE VIA PULL BOX TO OPERATORSTATION AND MAIN BUILDING. SCOPE OF WORK WITH G.C.SP5 ARM MOUNTED CCTV. PROVIDE 1" CONDUIT WITH PULLWIRE INTO BOOTH, DOWN WALL ANDUNDERGROUND VIA PULLBOX TO OPERATER STATION AT MAIN BUILDING. COORDINATE SCOPE OFWORK WITH G.C.SP6 PAY STATION RECESSED IN STONE FACED ENCLOSURE. PROVIDE POWER, DATA, AND ACCESSCONTROLS PER MANUFACTURE'S INSTRUCTIONS. PROVIDE NEMA 3R DISCONNECTING MEANSWITHIN ENCLOSURE.SP7 PROVIDE (1) 1-1/4" CONDUIT STUBBED INTO A ACCESSIBLE LOCATION FOR DATA/COMMUNICATIONSCABLING. COORDINATE REQUIREMENTS WITH VENDOR AND CABLING CONTRACTOR PRIOR TOROUGH-IN.SP8 PAY STATION CONNECTION (POWER & DATA). VERIFY ALL REQUIREMENTS (LOCATION, MOUNTING,CONTROLS, ETC) PRIOR TO ROUGH-IN WITH OWNER, ARCHITECT AND INSTALLER.SP9 VERIFY FINAL MOUNTING, MOUNTING HEIGHT, LOCATION, ETC. FOR LIGHT FIXTURE 'LC1' WITH G.C.,OWNER AND ARCHITECT PRIOR TO ROUGH-IN AND INSTALLATION.SP10 REFER TO CONTACTOR SCHEDULE AND DIAGRAM ON SHEET E001 FOR ADDITIONAL INFORMATION.50% ON/OFF DUSK TILL DAWN VIA PHOTOCELL (HALF THE LIGHT POLES), 50% ON/OFF VIAPHOTOCELLBUT FORCED OFF VIA TIMECLOCK AFTER HOURS (CANOPY LIGHTS AND HALF THE LIGHT POLES).1/4" = 1'-0"2ENLARGED PAY STATION CANOPY1/4" = 1'-0"3ENLARGED VACUUM EQUIPMENT STATION 12 07.22.22 Site Updates2222