Loading...
HomeMy WebLinkAbout002 Sht C0.1-Demo & CMP EXT'G 8 N EXT'G FIRE \,p�SJgg'y a SWR MAIN HYDRANT t✓`��pOR��G o EXT'G SIDE �- SIDEWALK <'A> EXT'G CURB EXT'G SAN rm & GUTTER SWR SERVICE z 5' EXT'G 10" WATER MAIN S S S S S T I o TURF R 340.00' (R&M) ` WEST BABCOCK ST. 3 TEL D=27'57'43" R&M EXT'G UTILITY TEL ( iEL IEL 1EL iSAWCUT, DEMO AND REMOVE EXT'G IEL 1EL °' POLE — — EL -fi&5.16 (M&Cj CONCRETE DRIVEWAY AND ADJACENT I W. Beall a=Tessa'(R) 1 FRBACK D S/W AND DISPOSE OF OFF SITE (TYR) I SETBACK _ w w—PROPOSED 10'w w w EXT'G UTILITY w w w w j z FRONTYARD � F1 POLE ����q(��\ SETBACK ° yy Mend hall t P nH f�F'�' I� fury'�n`HP' nr P/ —�ni1�� " gIHP DH ', DHP OHF. GAS� ni�lAS AS GAS CONSTRUCTION _ ROUTE � GRAVEL ���� ,_ _ r � i P ' — — — — EXT'G UTILITY -- POLE a L i o I W. Main St. / EXISTING �- I l L\ c I � / I LOT LINE — — _ —_ � —� � I o, I � I a ���mmmmmmmmommmo V � GRAVEL NI I ASPHALT I L O '---J , I --Z— PROJECT Z LOCATION ON TAN, \ / I DEMO AND REMOVE EXT'G p` . CHRIS G. CONCRETE CURB & GUTTER AND SCALE - Pj e'T. DISPOSE OF OFF SITE (TYR) - 0 10, TA' 40' s ,d,("ers ae DEMO AND REMOVE EXT'G \\\ -- ---- ----- 4g24 I CONCRETE CURB & GUTTER AND Ilyn Ct, EA DISPOSE OF OFF SITE (TYR) \\' \ DEMO AND REMOVE EXT'G p_ / \\� ASPHALT PAVEMENT AND I Koch St. DISPOSE OF OFF SITE (TYR) �� I � I � I DRAWN BY: CGB - RF � �� EXT'G CURB / REVIEWED BY: DAD AND GUTTER \�, J� -O PROJECT ENGINEER:CGB CURB & SIDEWALKPROTECTION NOTE / O N `- DESIGNED BY: DAD PROTECT EXT'G CURB AND SIDEWALK, NOT 1 h - to SCHEDULED TO BE REMOVED, DURING Q CONSTRUCTION. CURB AND SIDEWALK DAMAGED DURING CONSTRUCTION TO BE REPLACED BY II� / EXT O CONTRACTOR AT NO COST TO OWNER. (TYR) I \ PARKING A VED LOT N -- v 4825 III N� SJe� I✓ 1 I N \.°gyp G.ti g`L I ov �- T_L TEL College St. 6) -------------------- 26' RI ACCESS ROAD ENT III I GpP" CONSTRUCTION ROUTE MAP OR PER 16- FM 2159 EASE P �O NTS A-. U U DEMO AND REMOVE EXT'G I III DEMO AND REMOVE EXT'G 12' 12' O CONCRETE CURB & GUTTER AND - CONCRETE CURB & GUTTER AND DISPOSE OF OFF SITE (TYR) \�, DEMO AND REMOVE EXT'G - DISPOSE OF OFF SITE (TYP) U ASPHALT PAVEMENT AND DISPOSE OF OFF SITE III 5 4826 5' SIDEYARD N SETBACK 2-6' WIDE GATE bl O PSFIAJ 10' WIDE MIOUNTAINT OF STAT SA TELEPHONE U AND TELEGRAPH PER 19 I'm pG 56 Od I ASPHALT 5' SIDEYARD 114 12 O EXT'G CURB SETBACK AND GUTTER EXT'G IRRIGATION (� 4827 STRUCTURE O1 \ 1=i \ — — — - — — — — — — — — — — RAILING —/ — - — — — — — — — CORNER ryb POST TOP BRACE CHAIN LINK Lv�V RAIL POST FABRIC 44 �m) � DEMO/CONSTRUCTION MANAGEMENT PLAN 10' REARYARD jhT+yi SETBACK P N LEGEND 4771 MINOR CONTOUR (1") ----- ROAD CENTERLINE io LIGHT POLE CONSTRUCTION MANAGEMENT PLAN 4775 MAJOR CONTOUR (5') CURB & GUTTER 10, POWER POLE 1. CONTRACTOR SHALL PROVIDE BARRICADES AND WARNING DEVICES TO < --•--•--•— PROPERTY LINE/ROW EDGE OF PAVEMENT b GUY ANCHOR ENSURE THE SAFETY OF THE PUBLIC AS WELL AS WORKERS. 6' O N v i ----- -- EDGE OF GRAVEL 2. NO TRENCHES SHALL BE LEFT IN AN UNSAFE CONDITION. ALL TRENCHES---- SETBACK LINE O ELECTRICAL PEDESTAL g ® �O EDGE OF CONCRETE SHALL BE SECURELY BARRICADED, PLATED OR FILLED IN BEFORE THE END U EASEMENT LINE ELECTRICAL METER OF EACH WORK DAY. OPEN TRENCHES SHALL NOT BE LEFT UNATTENDED. - x ------ EDGE OF BUILDING FENCE ® TELEPHONE PEDESTAL �I S SEWER MAIN • FOUND MONUMENT AS NOTED p GAS METER 3. CONTRACTOR SHALL MAINTAIN SWPPP AT ALL TIMES. ss CONTROL POINT SEWER SERVICE 6 D4 GAS VALVE 4. CONTRACTOR SHALL KEEP SITE CLEAN OF DEBRIS THAT MAY BLOW AWAY. _ —w— WATER MAIN BENCHMARK 0 TEST PIT ws SEWER MANHOLE 5. CONSTRUCTION TRASH ENCLOSURE AND MATERIAL STORAGE AREA TO BE WATER SERVICE Q G PERC TEST BOTTOM SELF FS FIRE SERVICE TREE CONIFER (SIZE AS NOTED) o SEWER CLEANOUT LOCATED BY CONTRACTOR. SEE TRASH ENCLOSURE DETAIL BELOW. RAIL NOTE: SUPPORTED 3 SHEET SD STORM MAIN pd WATER VALVE TREE DECIDUOUS (SIZE AS NOTED) 6. ROLL OFF CONTAINER MAY BE USED IN LIEU OF TRASH ENCLOSURE BUT 1. CONTRACTOR MAY USE 40 CY ROLL FENCE a C�•1 OP qp FIRE HYDRANT MATERIAL STORAGE AREA ENCLOURE MUST BE PROVIDED. OFF CONTAINER AT HIS DISCRETION. F OVERHEAD POWER P OVERHEAD TELEPHONE ® CURB STOP 7. EXCAVATED MATERIAL SHALL BE STOCKPILED IN A SAFE CONDITION AND TIDAL WAVE GAS w WATER WELL EXCESS REMOVED FROM SITE AS SOON AS PRACTICAL. I UNDERGROUND GAS Oo �DETAIL EMO/CMP PLAN TEL UNDERGROUND PHONE STREET SIGN 8. CONTRACTOR TO CORDINATE WITH UTILITY COMPANIES FOR COl CONSTRUCTION TRASH ENCLOSURE&MATERIAL STORAGE AREA N.T.S. � PROPROJECT:21-105 E UNDERGROUND ELECTRIC BOLLARD REMOVE/RELOCATION/ABANDONMENT OF EXT'G UTILITIES IN CONFLICT WITHS DATE:08/25/21 PROPOSED IMPROVEMENTS OR UTILITIES NOT UTILIZED ON SITE. i