HomeMy WebLinkAbout001 Sht C0.0 - Cover Sheet SITE PLAN
FOR
TIDAL WAVE ABUT® SPA CAR WASH
PROJECT LOCATED IN
BOZEMAN, MONTANA SHEET INDEX �
SHEET NO. DESCRIPTION C) N
(�,y��yI CO.0 COVER 03/22/22 � 4 °q
� �T �®6/y�� C0.1 DEMO/CONSTRUCTION MANAGEMENT PLAN 08/25/21 O a U
U�111 l�J V' r C1.0 SITE PLAN 03/08/22 (�
N O h N
o�j N N N N C1.1 DIMENSION PLAN 03/08/22 F u
Q z z z z z z z z C2.0 GRADING & DRAINAGE PLAN 03/08/22
C3.0 CIVIL DETAILS 08/25/21 lJ^
W. Beall F"
Q na PROJECT A901 COLOR EXTERIOR VIEWS 03/01/22 a
o
o � Men enhall PROJECT: TIDAL WAVE AUTO SPA CAR WASH A902 CAR WASH — FIRST FLOOR PLAN 03/01/22 A
LOCATION o
ro PROPERTY OWNER: FALGERS INC A903 CAR WASH — EXTERIOR ELEVATIONS 03/01/22
¢' `/�/ ^q ATTN: JAMES HRUSKA (� N
W. M i n �t, A904 AUXILIARY STRUCTURES 03/01/22
o 2422 RIDGE ROAD
L = Uri
LINCOLN NE 68512-2400 A905 AUXILIARY BUILDINGS 03/01/22
-
N APPLICANT: NEW POTATO HOLDING LLC A906 AUXILIARY BUILDINGS 03/01/22
ATTN: HENRY HILSMAN L1.1 PLANTING PLAN 03/21/22
124 EAST THOMPSON ST
THOMASTON GA 30286 11.2 PLANTING SCHEDULE AND NOTES 03/21/22
r •� (813) 690-3759 L1.3 PLANTING DETAILS 03/21/22 w
o > L - L Pio er Dr. 0 ❑ ENGINEER: MADISON ENGINEERING N
0 L2.1 IRRIGATION PLAN, SCHEDULE AND NOTES 03/21/22 a N
jam. 3 s ATTN: CHRIS G. BUDESKI, PE o
Marilyn Ct. N 895 TECHNOLOGY BLVD SUITE 203 L2.2 IRRIGATION DETAILS 03/21/22 0
r%) ci BOZEMAN, MT 59718 L2.3 IRRIGATION DETAILS 03/21/22
y Koch t. ❑❑ (406) 586-0262
N
Donna Ave. } ❑❑❑❑ ❑ ARCHITECTURAL: M. TODD ALBRITTON ARCHITECT
202 EAST MAIN STREET E000 I ELECTRICAL SITE AND PHOTOMETRIC PLAN 02/01/22
o N ❑❑❑❑ ( )ASTON 30286
� 770 550-3275
O N
N
LOCATION: 2102 WEST BABCOCK
2 ❑❑❑❑ BOZEMAN MT 59715 z w
N N
s PROPERTY DESC: LOT 1A BLOCK 3 KIRK 4TH SUBDIVISION w
o ❑❑❑ SECTION 11 TMS RSE g
N CITY OF BOZEMAN GALLATIN COUNTY
U
_ ZONING: B2
W. College S t. �5 a LOT AREA: 1.055 ACRES o
S
Charmber FLOOR AREA: 4,136 SF FAR:1:0.1
,p Analysis Dr. lain Dr. DENSITY: N/A w
[Dr.
rtin r- BLOCK FRONTAGE: MIXED - LANDSCAPED
z
u
3 SURFACE WATER: NO SURFACE WATER IS EVIDENT ON SITE
W. Garfield St. SITE LIGHTING: BUILDING AND POLE MOUNTED LIGHTING PROPOSED
U-) PAYBACK DISTRICT: NO PAYBACK OR SPECIAL IMPROVEMENT DISTRICTS ARE
+, SHOWN ON THE CITI'S COMMUNITY DEVELOPMENT VIEWER
CASH-IN-LIEU OF WATER RIGHTS: CIL OF WATER RIGHTS TO BE PAID
PRIOR TO SITE PLAN APPROVAL.
VICINITY MAP AFFORDABLE HOUSING: N/A — COMMERCIAL DEVELOPMENT
PUBLIC PARK: N/A — COMMERCIAL DEVELOPMENT
COMMERCIAL OPEN SPACE AREA
REQUIRED:
2% X LOT AREA = 2% X 1.055 ACRES = 918 SF
PROVIDED:
990 SF WITH PICNIC TABLE
CERTIFY THAT THE GRADING PLAN FOR THIS PROJECT PARKING SUMMARY: _
HAS BEEN DESIGNED TO PROVIDE ADA ACCESIBLE REQUIRED:
ROUTES TO ALL THE UNIT DOORS FROM A PUBLIC 1 SPACE/EMPLOYEE ON MAXIMUM SHIFT
STREET. PROVIDED:
2 SPACES (2 EMPLOYEES ON MAX SHIFT) `
CHRIS G. BUDESKI, PE
i
i
3
008/25/216
COVER SHEET