Loading...
HomeMy WebLinkAbout001 Sht C0.0 - Cover Sheet SITE PLAN FOR TIDAL WAVE ABUT® SPA CAR WASH PROJECT LOCATED IN BOZEMAN, MONTANA SHEET INDEX � SHEET NO. DESCRIPTION C) CO.0 COVER 07/22/22 P-4 4 °q ��4��III JI 4�� �®�� C0.1 DEMO/CONSTRUCTION MANAGEMENT PLAN 08/25/21 O a U III JI C1.0 SITE PLAN 07/22/22 N O h N o�j N N N N C1.1 DIMENSION PLAN 07/22/22 � F C.) Q z z z z z z z z C2.0 GRADING & DRAINAGE PLAN 07/22/22 C3.0 CIVIL DETAILS 08/25/21 lJ^ W. Beall F" Q no PROJECT A901 COLOR EXTERIOR VIEWS 03/01/22 a o o Men enhall PROJECT: TIDAL WAVE AUTO SPA CAR WASH A902 CAR WASH — FIRST FLOOR PLAN 07/22/22 A LOCATION o ro PROPERTY OWNER: TWAS PROPERTIES LLC A903 CAR WASH — EXTERIOR ELEVATIONS 07/22/22 ¢' W. ^q + ATTN: JOHN LAPOINTE (� N _ ' z VV, M i n 1, A903A CAR WASH — EXTERIOR ELEVATIONS 07/22/22 0 115 EAST THOMPSON ST L = Uri THOMASTON GA 30286 A904 AUXILIARY STRUCTURES 03/01/22 D (813) 690-3759A905 AUXILIARY BUILDINGS 03/01/22 N APPLICANT: NEW POTATO HOLDING LLC A906 AUXILIARY BUILDINGS 03/01/22 ATTN: HENRY HILSMAN O 124 EAST THOMPSON ST L1.1 PLANTING PLAN 07/29/22 o THOMASTON GA 30286 N N or L Pio er Dr. 0 ❑ (813) 690-3759 N N .� Q'� L1.2 PLANTING SCHEDULE AND NOTES 07/29/22 N N 0 L1.3 PLANTING DETAILS 07/29/22 Q N N ENGINEER: MADISON ENGINEERING o\\ Marilyn Ct. N ❑❑ ATTN: CHRIS G. BUDESKI, PE L2.1 IRRIGATION PLAN, SCHEDULE AND NOTES 07/29/22 00 N O C e r7 cv 895 TECHNOLOGY BLVD SUITE 203 K BOZEMAN, MT 59718 12.2 IRRIGATION DETAILS 07/29/22 Donna Ave. } N (406) 586-0262 L2.3 IRRIGATION DETAILS 07/29/22 ❑❑❑❑ ❑ ARCHITECTURAL: M. TODD ALBRITTON ARCHITECT E101 ELECTRICAL SITE PLAN 07/22/22 0 0 a ❑❑❑❑ THO EAST MAIN STREET E103 ELECTRICAL SITE PHOTOMETRIC PLAN 07/22/22 0 N THOMASTON GA 30286 'N N 770) 550-3275 N � L ❑❑❑❑ z W W Ln LOCATION: 2102 WEST BABCOCK 3 3:N LIB BOZEMAN MT 59715 a_ N g j tF W W o ❑❑❑ PROPERTY DESC: LOT 1A BLOCK 3 KIRK 4TH SUBDIVISION g SECTION 11 T2S RSE w CITY OF BOZEMAN GALLATIN COUNTY _ �`+ ZONING: B2 W. College S t° � 05 a LOT AREA: 1.055 ACRES o 0 a a Grant J' Chamber FLOOR AREA: 4,136 SF FAR:1:0.1 ,p Analysis Dr. lain Dr. DENSITY: N/AJuli w w Martin r— BLOCK FRONTAGE: MIXED — LANDSCAPED Z � N 3 Dr. SURFACE WATER: NO SURFACE WATER IS EVIDENT ON SITE W. Garfield St. SITE LIGHTING: BUILDING AND POLE MOUNTED LIGHTING PROPOSED PAYBACK DISTRICT: NO PAYBACK OR SPECIAL IMPROVEMENT DISTRICTS ARE +, SHOWN ON THE CITI'S COMMUNITY DEVELOPMENT VIEWER CASH—IN—LIEU OF WATER RIGHTS: CIL OF WATER RIGHTS TO BE PAID PRIOR TO SITE PLAN APPROVAL. VICINITY MAP AFFORDABLE HOUSING: N/A — COMMERCIAL DEVELOPMENT PUBLIC PARK: N/A — COMMERCIAL DEVELOPMENT COMMERCIAL OPEN SPACE AREA REQUIRED: 2% X LOT AREA = 2% X 1.055 ACRES = 918 SF PROVIDED: 990 SF WITH PICNIC TABLE CERTIFY THAT THE GRADING PLAN FOR THIS PROJECT PARKING SUMMARY: _ HAS BEEN DESIGNED TO PROVIDE ADA ACCESIBLE REQUIRED: ROUTES TO ALL THE UNIT DOORS FROM A PUBLIC 1 SPACE/EMPLOYEE ON MAXIMUM SHIFT STREET. PROVIDED: 2 SPACES (2 EMPLOYEES ON MAX SHIFT) ` CHRIS G. BUDESKI, PE i CIVIL ENGINEERING: SURVEY: MADISON ENGINEERING MEE]E DIAN LAND S UR WERYINO Ma INTA 1. 895 TECHNOLOGY BOULEVARD, SUITE 203 610 PROFESSIONAL DRIVE SUITE 3 H G. BOZEMAN, MT 59718 BOZEMAN MIT 59718 0825 PE BONA (406) 586-0262 (406) 586-5740]FAX (Q6)624-6565 „`"`, i 07/29/22 COVERSHEET