HomeMy WebLinkAbout008 Dog Park Grading Plan I I x�x
w �x�
( I a
x- Q3..
x A.
\ i 4737.0 x .
x�x
�x
° �x-
( I 4j3jS x�x
APPROX. EG-4736.32
o 4738.0 473>.5 Y x x
APPROX. EG=4736.09 •� o ! '• �� •�'• x
I• � '. a .e •, x�x�
•• .' 4937_5
FG=4736.71 • e•. e •
•O' .{/ a. ( FG-4736.91 .CATCH R36.5' -7 jq 4j Q Q Q
• CURB •♦ 1' vj
-A •°�a �. I X I 4738.5 FG=4737.68 ° 'a a,• ° ,1°•
41
o a'
I I I I 9 e
FG=4738.36 �i A CATCH ° A °a.1 A.
FG--4737.11 ' 1 I FG=4737.29 SPILL R5.5' CURB .
/ ° .e ° I CURB R5.0' / 4735.5 47,3,5 0 4736.-5�
R9.5' 'o.sq FG-4736.50 4>3$
APPROX. EG-4736.47
/ ( I 3-FT WIDE CURB CUT. SPILL FROM
APPROX. EG=473�7 i i R4.0' e I PARKING LOT TO CONC. APRON.
POND BOTTOM TO
FG=4738.54- \
o
I R4.5'
735:0
FG=4736.65
4738:0 4735.5
3-FT WIDE CURB CUT. SPILL FROM 4-736r5
PARKING LOT TO CONC. APR00
ON.
FG=4736.50
( A)`?$0 R9.5' "�' o PROPOSED RETENTION POND
I I
' r POND BOTTOM ELEV. = 4735.00'
IR�I - - M OVERTOPPING ELEV. = 4736.50'
`�-IR S FG=4736.85 v POND BOTTOM AREA = 679 SF
-2.oq STORAGE = 1,752 CF @ 1.5' DEPTH
I I `c9 R4.0'
O
BEGIN TRANSITION FROM CATCH CURB TO SPILL CURB
I I o
I
I I
PROPOSED 10.0' `t SPILL
��- UTILITY EASEMENT CURB 4737.5
IR
I I ,
( I R9.5'
I I
SPILL
CURB
I I
FG=4739.25 ��9
( I o
I I
y FG-4739.40-
R4.0'
I I R16.5'
I I \4j3g 3 0
I I FG=4738.97 �
( I R4.5' �qo Rj3, FG=4737.45
( I -s p
- E
I I E
n
( I v FG-4739.12 FG=4737.78
�>
SPILL %0 R4.5' R16.5'
CURB
4739.0 ,� o
I I M 4>3g o
FG=4737.97 n
REVISIONS: / \ 4738.5 v -
1. CURB RADIUS LABELS ADDED. / \
2. MINOR CHANGE TO CURB TYPE (SPILL VS. CATCH). of
3. PROPOSED 10-FT UTILITY EASEMENT NOW SHOWN ALONG /
FERGUSON AVE. FRONTAGE.
NO. REVISIONS DRAWN BY DATE 0 10 20 30 PROJECT g:01-241.40 T� SHEET
�p }��
1 AS OUTLINED IN NOTES ABOVE MCG 08/10/22 COUN J Y R EGIONA L �[A][ K IM PROV EEl�[]�NTS 32 DISCOVERY DRIVE DATE: 01/11/2022
,{�//� �p }�7 }�}�� }�7 �? BOZEMAN,MT 59718 Civil Engineering }�
DOG ]BARK - GRADING AND DRAINAGE PLAN Engineering GRADING PLAN �La�
SCALE (FEET) PHONE(406)582-0221 GeotechnicalEn ineerin ALLIED
FAx(406)582-577. Land Surveying �� PARK
PROJECT ENGINEER: RSR DRAWN BY: MCG GAT LATIp T COUNTY REGIONAL PAR www.alliedengineering.com
DESIGNED BY: MCG REVIEWED BY: RSR L lll� COUNTY REGIONAL PARK °��,5e p�ole�"� GRADING PLAN