HomeMy WebLinkAboutMDT - Bozeman TCC Area Projects Report_10-24-22Bozeman Area Transportation Coordinating Committee Wednesday, October 26, 2022 Bozeman Area- Construction Phase Gallatin Canyon VMS: ➢ Adds permanent electronic message boards in the Gallatin Canyon. ➢ Awarded to Stillwater Electric. ➢ Construction expected to be completed in fall 2022. Bozeman Rest Area Relocation, aka Headwaters Rest Area: ➢ Public/Private Partnership project to relocate the RA currently located on N. 19th in Bozeman north of I-90 Exit 274 near Three Forks. ➢ Awarded by Transportation Commission in April 2021. ➢ Construction began in August 2021 ➢ RA completion, and property transfer expected in spring of 2023. Bozeman Hill Ditch Cleaning: (Maintenance) ➢ I-90 EB and WB, RP 313- 323 ➢ Remove and recycle excess sanding materials in roadway ditches. ➢ 75,000 cubic yards of material recycled to date. Dry Creek Road and Manhattan to Belgrade: (Maintenance) ➢ Tied Chip seal projects ➢ Dry Creek Road- RP 0.7- 9.0 ➢ Manhattan-Belgrade frontage Road- RP 0.0 – 8.0 ➢ Complete Logan Dump Rd. and Madison Frontage Rd (Maintenance) ➢ Tied chip seal projects ➢ Combined total of approx. 3.0 miles ➢ Complete Bozeman- NE and Bridger Canyon Rd. (Maintenance) ➢ MT 86 ➢ RP 2.3- 9.6 overlay ➢ RP 2.3- 15.8 chip seal ➢ Chip seal will be applied in 2023 season East Valley Center Rd. (Maintenance) ➢ RP 0.1 – 4.4 from Jackrabbit to Spur Road signal ➢ Completed Luminaire Upgrades- MDT Maint. Statewide Total- (Maintenance) ➢ Replacing current high pressure sodium luminaire heads w/LED Type. ➢ Individual projects in each MDT division. ➢ Statewide effort, to be completed by the end of 2023. Bozeman Area- 2023 Design Phase Projects 2023 I-90 Incident Management- Phase 1 ➢ Mitigate operational and maintenance impacts for I-90 closures and weather events between Three Forks and Billings. ➢ The project area encompasses approximately 170 miles of I-90 between the US 287 Interchange west of Three Forks to the I-90/I-94 junction at Billings. ➢ Installation of advance warning such as road closure signs and gates with flashers and electronic message boards throughout the corridor. 2023 SF-189 D2 HT Median Cable Rail ➢ Includes locations on Interstates 15 and 90 ➢ I-90 Bozeman Area- between Three Forks and the mouth of Rocky Canyon. 2023 Turnbay North of Gallatin Gateway US 191, RP 77 ➢ Adds a two way left turn lane between Gooch Hill Rd. and Zachariah Lane. ➢ Connects to existing turn lanes at either end. 2023 CRSII NH 50-2(87)61 S. of Spanish Creek-S ➢ US 191, RP 61- 65 ➢ M/F, seal and cover ➢ Begins at bridge near Lava Lake trailhead, extends north 3.8 miles 2023 4-Corners East ➢ 19th to Fowler- Mill/fill ➢ Seal and Cover – 4-corners to 19th Avenue 2023 North 7th & Griffin Drive, Bozeman ➢ Intersection reconstruction, traffic signals, lighting, ADA upgrades to current standards, and turn lanes. ➢ MDT is coordinating this project with the city of Bozeman’s reconstruction of West Griffin Drive. 2023 N 19th Ave Bozeman ➢ Mill Fill – I-90 interchange to Main Street. 2023 SF-169 S-288 Curves (Safety Project South of Manhattan) ➢ Site 1- RP 4.5- 5.0 o Replace bridge w/culvert. o Reconstruct curve. o Widened shoulders, rumble strips, delineation, int. improvements, slope flattening. ➢ Site 2- RP 2.4- 2.9 o Widened shoulders, rumble strips, and signs. o Replace stock pass and correct adverse super-elevation.