Loading...
HomeMy WebLinkAbout04 PLAN-MAIN EXGUP DN DN 6' - 6 1/4"28' - 2"12' - 7" - - - - 14' - 4 1/4"2' - 3"2' - 6 1/2" OPENING 3' - 10 3/4" 0' - 6" OPENING 2' - 4" 0' - 6 1/4" 3' - 3" OPENING 3' - 11"5' - 11 1/4" 39' - 6"12' - 3"5' - 11 3/4"OPENING3' - 11"6' - 0 1/4"4' - 9 1/2"3' - 8 3/4"1' - 2"1' - 0 1/2"OPENING2' - 6 1/2"4' - 3"OPENING2' - 6 1/2"2' - 2"0' - 6 3/4"OPENING2' - 6"2' - 10 1/2"LIVING ROOM HALLWAY KITCHEN REAR ENTRY / LAUNDRY OFFICE BEDROOM 1 DRYERWASHER RANGEDW FRIDGE CABIINETSCLOSETCLOSET EXTERIOR COVERED PORCHBATHCABIINETSCABIINETSDN - - - - 6' - 4 3/4" OPENING 2' - 0"5' - 10 3/4"6' - 11 3/4" OPENING 2' - 10"5' - 7 1/4" 102 10 2 2 2 11 11 EXG. APT 2. SEE DOCS EXISTING TO REMAIN PROPOSED CONSTRUCTION PLOT DATE:Design 212 S. WALLACE AVE #301 BOZEMAN, MT tel. 406 -282 -4411 THRULINEPARTNERS.COM DRAWN BY: SHEET NO. SHEET TITLE CLIENT NAMEPROJECT ADDRESSPERMIT #FILE PATH:to Build Project No. DATE ISSUED:PAGE SIZE: ANSI B (11 X 17)2022.09.26 TBD 9/26/2022 5:54:49 PMBIM 360://TMC/22.001_TMC_r21.rvtPLAN - MAIN EXISTING CB 04 JEANNE CARTER 415 S 3RD AVE, BOZEMAN, MT 59715THE MORRIGAN22.001 1/4" = 1'-0"2 PLAN - MAIN LEGEND N