Loading...
HomeMy WebLinkAbout014 Landscape Irrigation Response erik@mad-eng.com From: Cory Whiting <cwhiting@isdgllc.com> Sent: Monday, August 29, 2022 12:42 PM To: erik@mad-eng.com Subject: RE: Nexus Point Preliminary Plat - Irrigation Comment Erik, we have designed the irrigation system to meet the requirements of the well on-site. We were told that we could use up to 35gpm for the well. Our biggest flow is only about 33 gpm so we easily meet that requirement. For overall runtime,the site can be watered in approx. 8 hrs water window three times per week so if there is water restrictions we should be just fine. Let me know if you need anything else. Thanks, Cory Whiting —ASLA, PLA Landscape Architect/Owner I C a + _.. n No ` DESIGN GROUP Landscape Architecture Land Planning 17 North 470 West American Fork,Utah 84003 0:8oi.756.5043 C:801-372.2458 F:8ol.756.5279 www.in-sitedesigngroup..com Licensed in Utah, Idaho,Wyoming,Montana Nevada,Colorado,Oregon and North Dakota From: erik@mad-eng.com<erik@mad-eng.com> Sent: Monday, August 29, 2022 11:42 AM To:Cory Whiting<cwhiting@isdgllc.com> Subject: FW: Nexus Point Preliminary Plat- Irrigation Comment Cory, I have been trying to reach someone at In Site Design Group, below is my previous email correspondence and unfortunately, I cannot get ahold of anyone through phone calls. Could you possibly help me out? I need to address the comment we received from the City to resubmit for preliminary plat.This comment also came up for 2131 Graf street which shares this parkland. Let me know whenever you get a chance.Thanks. Erik Ringsak, Ell,CMI Madison Engineering,LLC 895 Technology Boulevard, Suite 203 Bozeman, MT 59718 1 406.586.0262 office eriktWmad-enR.com M�Wl,ION t.�GlNt:t:Rl�l. From: erik mad-eng.com<erik mad-enR.com> Sent: Friday, August 26, 2022 12:50 PM To: 'architects@isdllc.com'<architects@isdllc.com> Subject: FW: Nexus Point Preliminary Plat- Irrigation Comment In Site Design Group, I am just checking in on the email below. I need a little bit of information to provide the City of Bozeman regarding a question they had for the preliminary Plat at Nexus Point. Let me know whenever you get a chance. Thanks. Erik Ringsak, El, CMI Madison Engineering, LLC 895 Technology Boulevard, Suite 203 Bozeman, MT 59718 406.586.0262 office erik@mad-ena.com MAMtiM ENGINEERING From: erik@mad-eng.com<erik@mad-eng.com> Sent:Wednesday, August 24, 2022 1:35 PM To: 'Thomas McKenna' <Thomas@isdRllc.com> Subject: Nexus Point Preliminary Plat- Irrigation Comment Thomas, We recently received City review comments for the Nexus Point Preliminary Plat.Attached above is the Lantern Park North Landscape Plan and a comment from the parks department regarding the irrigation and water use. Can you please answer this question when you get a chance? I will need to include your response to the Nexus Point Preliminary Plat Resubmittal. If you need any additional information feel free to ask. Erik Ringsak, El, CMI Madison Engineering, LLC 895 Technology Boulevard, Suite 203 Bozeman, MT 59718 406.586.0262 office erik@mad-eng.com 2