HomeMy WebLinkAbout008 L18 Traffic Memo
2304 N. 7TH AVENUE | SUITE L | BOZEMAN, MT 59715 | (406) 587-2781
Professional Consulting Engineers and Land Surveyors
Equal Opportunity Employer | www.hyaliteeng.com
February 28, 2022
City of Bozeman Engineering
Alfred M. Stiff Professional Building
PO Box 1230
Attn: Mikaela Schultz
RE: Nelson Meadows Lot 18 Subdivision
Traffic Memorandum
Bozeman, Gallatin County, Montana
Dear Mikaela:
Hyalite Engineers performed a trip generation estimate for Lot 18 of the Nelson Meadows Subdivision.
Nelson Meadows Lot 18 will be constructed in one phase and will include both warehousing and small office
building space.
Enclosed with this memorandum in Appendix A is a set of figures to display the project location and the
building layout for Nelson Meadows Lot 18. Below is a list of the figures enclosed:
Figure 1: Site Location
Figure 2: Building Layout
The trip generation analysis was performed using generation rates found in the Trip Generation; 10th Edition
published by the Institute of Transportation Engineers (ITE) for estimating average vehicle trip ends based
on Land Use Code 150 – Warehousing and Land Use Code 712 – Small Office Building. Nelson Meadows
Lot 18 is projected to generate a total of 70 average weekday trips as well as 9 weekday AM and 12
weekday PM peak hour trips. The results of this analysis are included in Appendix B.
Nelson Meadows Lot 18 will have minimal impacts on the transportation system in the area of the
development and will not require a traffic study to investigate the impacts. A waiver for the requirement of a
traffic study in writing from the Engineering Division is required prior to any application approval. We
request that this waiver from the Engineering Division be provided for this site plan submittal.
Let me know if you have any questions regarding this traffic memorandum, or if anything else needs to be
provided or clarified. Please give me a call or send an email to bmegaard@hyaliteeng.com with any
questions.
Sincerely,
Brett Megaard, P.E.
Project Manager
Enclosed:
Appendix A: FIGURES
Appendix B: TRIP GENERATION ESTIMATE
N E L S O N M E A D O W S
L O T 1 8 S U B D I V I S I O N
F E B R U A R Y 2 0 2 2
A P P E N D I X
APPENDIX A
FIGURES
M:\213688\Traffic Impact Study\213688.dwgSITE LOCATION
FIGURE 1
JOB NUMBER :
SHEET :
SCALE :1" = 500'
1 OF 10500'1000'
DATE :
W E B : w w w . h y a l i t e e n g . c o m
2304 NORTH 7TH AVENUE STE. L B O Z E M A N , M T 5 9 7 1 8
P H O N E : ( 4 0 6) 5 8 7 - 2 7 8 1 F A X : ( 4 0 6 ) 5 2 2 - 9 2 2 5
PROJECT LOCATION
NELSON ROADFEB 2022
213688
NELSON MEADOWS
LOT 18 SUBDIVISION
R
O
Y
A
L
W
O
L
F
R
O
A
D
F
R
O
N
T
A
G
E
R
O
A
D
I-
9
0
V
A
L
L
E
Y
C
E
N
T
E
R
R
O
A
D
M:\213688\Traffic Impact Study\213688.dwgBUILDING LAYOUT
FIGURE 2
JOB NUMBER :
SHEET :
SCALE :NTS
1 OF 1
DATE :
W E B : w w w . h y a l i t e e n g . c o m
2304 NORTH 7TH AVENUE STE. L B O Z E M A N , M T 5 9 7 1 8
P H O N E : ( 4 0 6) 5 8 7 - 2 7 8 1 F A X : ( 4 0 6 ) 5 2 2 - 9 2 2 5
FEB 2022
213688
NELSON MEADOWS
LOT 18 SUBDIVISION
N E L S O N M E A D O W S
L O T 1 8 S U B D I V I S I O N
F E B R U A R Y 2 0 2 2
A P P E N D I X
APPENDIX B
TRIP GENERATION ESTIMATE
Quantity
ITE In Out Total In Out Total In Out Total
LUC Land Use 77%23%27%73%50%50%
150 Warehousing 4.885 1 0 1 1 1 2 5 5 10
Rate: Rate: Rate:
Quantity
ITE In Out Total In Out Total In Out Total
LUC Land Use 82%18%32%68%50%50%
712 Small Office Building 3.655 7 1 8 3 7 10 30 30 60
Rate: Rate: Rate:
TOTALS:8.54 9 1 9 4 9 12 35 36 70
PROJECT TOTALS:9 1 9 4 9 12 35 36 70
1.92 / 1K SF GFA 2.45 / 1K SF GFA 16.19 / 1K SF GFA
Weekday Morning Peak Hour Weekday Evening Peak Hour Daily Trips
NELSON MEADOWS LOT 18
Trip Generation
Trip Generation Estimate
0.17 / 1K SF GFA 0.19 / 1K SF GFA 1.74 / 1K SF GFA
Weekday Morning Peak Hour Weekday Evening Peak Hour Daily Trips