HomeMy WebLinkAbout007 L18 Stormwater Report Stormwater Report: for NELSON MEADOWS LOT 18 Gallatin County, Montana June, 2022 Prepared For: Vista, LLC Prepared By: Hyalite Engineers, PLLC Brett Megaard, PE Page 1 NELSON MEADOWS LOT 18 ENGINEER’S STORM DRAINAGE DESIGN REPORT Owner: Vista, LLC 1276 N 15th Ave Suite 103 Bozeman, MT 59715-3289 Introduction This report provides a design basis and hydrologic calculations for sizing stormwater infrastructure for Nelson Meadows Lot 18. The project site is located 0.08 miles south of the Royal Wolf Way and Prince Lane intersection. This project in total is 0.95 acres of commercial development constructed in one proposed phase. The owner would like to construct one unit. The existing site has topography sloping at approximately -5.0% to the north. There is currently no existing stormwater infrastructure on the lot. All precipitation is currently either contained on site through absorption and infiltration or runs offsite to the north. The City of Bozeman Design Standards and Specifications (March 2004) was used as the primary guideline for this stormwater drainage design. General Design The proposed development of the site will be 47% impervious area containing a building, asphalt driveways, and concrete walkways and 53% pervious area of undisturbed land. Groundwater observed 0.5 miles to the southwest of this site was found at depths ranging from 3’ or deeper, while monitoring wells 1 mile to the northeast ranged from 5’ or deeper. The proposed building will have roof drains that will capture rainwater which will then be routed to a surface retention pond. The site is graded so that runoff from all the areas will runoff into the proposed surface retention ponds. All stormwater will be captured and retained within the site. No stormwater will be drained into any existing systems adding no demands to the surrounding area. Hydrologic Methodology The modified rational method was used to calculate retention volumes. The modified rational method is used to compute runoff for storm durations equal to or greater than time of concentration. Total runoff volume is computed by multiplying the duration of the storm by the runoff rate. Retention volumes were calculated using the following formulas: Q = CIA V = DQ Where: C = Weighted C Factor I = Storm Intensity (in/hr) A = Area (acres) Q = Runoff (cfs) D= Duration (s) V = Volume (cf) Retention volumes were analyzed for the 10-year 2-hour and 100-year 2-hour and 24-hour storms using Figure I-3 from The City of Bozeman design Standards (March 2004). Page 2 Runoff coefficients and watershed flow calculations are included in Appendix A. The storm coefficients A and B are from the City of Bozeman Design Standards and the infiltration rates are from DEQ 8. Stormwater Retention Ponds The stormwater retention ponds were designed to be sized for the development of Nelson Meadows Lot 18. The proposed 20’x15’ retention pond will be installed to account for the runoff from the southern quarter of the proposed commercial building and the unimproved area around it. The proposed 80’x18’ retention pond will be installed to account for the runoff from the driveway/parking areas and the unimproved areas surrounding them, along with the northern three-quarters of the building. The water will flow away from the proposed development and into the proposed retention ponds. Some of the water will be captured in a swale that will direct the runoff to the ponds. At these locations where the swale meets the pond, riprap will be installed to dissipate the water’s velocity. The stormwater calculations for these areas are included in Appendix A and the drainage areas are shown in Appendix B. Flooding Excessive runoff from a large storm event will be routed such that runoff does not inundate home sites, drain fields or over top the roadway. Finished floor elevations of buildings will be set higher than the surrounding ground with finished ground sloping away from them. In the event that the ponds overtop, stormwater will be diverted away from buildings on the site. Appendix A – Stormwater Retention Pond Calculations Appendix B – Drainage Area Exhibit N E L S O N M E A D O W S L O T 1 8 J U N E 2 0 2 2 A P P E N D I X APPENDIX A STORMWATER RETENTION POND CALCULATIONS NELSON MEADOWS LOT 18 Stormwater Basin 1 Page 1 of 1 2/11/2022 By Cody Kerkaert RETENTION POND Design Storm: 10-Year, 2 Hour (City of Bozeman) Basin Area (ac): 0.09 Post-Dev C (weighted): 0.51 Storm Duration (min)120.00 Weighted Runoff Co-efficent: Area Runoff (acres) Coefficient Calculations Impervious 0.04 0.90 0.04 Undisturbed 0.05 0.20 0.01 Totals 0.09 0.05 Cw =0.51 Runoff Rate (Rational Method): Storm Event (yr): 2-yr, 2-hr 10-yr, 2-hr 25-yr, 2-hr 100-yr, 2-hr 100-yr, 24-hr *Storm Coeff. A: 0.36 0.64 0.78 1.01 1.01 *Storm Coeff. B:0.60 0.65 0.64 0.67 0.67 Composite C: 0.51 0.51 0.51 0.51 0.51 Storm Intensity (in/hr): 0.24 0.41 0.50 0.63 0.12 Post-Dev Qp (cfs): 0.01 0.02 0.02 0.03 0.01 Pond Size: 10-Year, 2 Hour Storm Duration Time: 7200.00 sec V10YR/2HR : 135 cf *Values are from COB Design Standards Figure 2 - Rainfall Intensity Druation in Minutes NELSON MEADOWS LOT 18 Stormwater Basin 2 Page 1 of 1 2/11/2022 By Cody Kerkaert RETENTION POND Design Storm: 10-Year, 2 Hour (City of Bozeman) Basin Area (ac): 0.86 Post-Dev C (weighted): 0.53 Storm Duration (min)120.00 Weighted Runoff Co-efficent: Area Runoff (acres) Coefficient Calculations Impervious 0.41 0.90 0.37 Undisturbed 0.45 0.20 0.09 Totals 0.86 0.46 Cw =0.53 Runoff Rate (Rational Method): Storm Event (yr): 2-yr, 2-hr 10-yr, 2-hr 25-yr, 2-hr 100-yr, 2-hr 100-yr, 24-hr *Storm Coeff. A: 0.36 0.64 0.78 1.01 1.01 *Storm Coeff. B:0.60 0.65 0.64 0.67 0.67 Composite C: 0.53 0.53 0.53 0.53 0.53 Storm Intensity (in/hr): 0.24 0.41 0.50 0.63 0.12 Post-Dev Qp (cfs): 0.11 0.19 0.23 0.29 0.06 Pond Size: 10-Year, 2 Hour Storm Duration Time: 7200.00 sec V10YR/2HR : 1348 cf *Values are from COB Design Standards Figure 2 - Rainfall Intensity Druation in Minutes N E L S O N M E A D O W S L O T 1 8 J U N E 2 0 2 2 A P P E N D I X APPENDIX B DRAINAGE AREA EXHIBIT