Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout017 SP001 EXTERIOR MATERIALSC
8.11.22 NAC
Scott Bechtle 1914
ES
D A R
NLECITS H TCETIANETfoOM
T
ABECHTLE ARCHITECTS
Any unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2022 Bechtle ArchitectsJOB:4515 Valley Commons Drive #201 Bozeman, MT 59718406.585.4161 ph 406.585.6919 faxBECHTLEARCHITECTS9/1/2022 9:42:45 AMBIG 406 LLC MEDICALOFFICE BUILDINGBozeman, MT2121
SP001
EXTERIOR
MATERIALS
SITE PLAN
REVIEW
SEPT. 2, 2022
FIBER CEMENT PANEL - GRAY FINISH
FCP-2:
MFR: NICHIHA -CONCRETE SERIES
INDUSTRIAL BLOCK
CONCRETE EPC601F
FIBER CEMENT 6" PANEL - WOOD FINISH
FCP-1:
MFR: NICHIHA -WOOD SERIES
VINTAGEWOOD REDWOOD
SMOOTH WALL PANEL - WHITE GLOSSY FINISH
WP-1:
MFR: STONEWOOD -STANDARD SERIES
WHITE 5401-AB
CORRUGATED STEEL
MWP-1:
MFR: BRIDGER STEEL
PRE-FINISHED SHEET MTL
SMF-1:
MFR: BRIDGER STEEL GALVUME
ALUM STOREFRONT - MATTE BLACK
INSPIRATION IMAGES
C
8.11.22
C
8.11.22
REVISION SCHEDULE
No. Description Date
C SITE
PLAN
REVIEW
COMME
NTS 2
8.11.22