Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
017 SP001 EXTERIOR MATERIALS
C 8.11.22 NAC Scott Bechtle 1914 ES D A R NLECITS H TCETIANETfoOM T ABECHTLE ARCHITECTS Any unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2022 Bechtle ArchitectsJOB:4515 Valley Commons Drive #201 Bozeman, MT 59718406.585.4161 ph 406.585.6919 faxBECHTLEARCHITECTS9/1/2022 9:42:45 AMBIG 406 LLC MEDICALOFFICE BUILDINGBozeman, MT2121 SP001 EXTERIOR MATERIALS SITE PLAN REVIEW SEPT. 2, 2022 FIBER CEMENT PANEL - GRAY FINISH FCP-2: MFR: NICHIHA -CONCRETE SERIES INDUSTRIAL BLOCK CONCRETE EPC601F FIBER CEMENT 6" PANEL - WOOD FINISH FCP-1: MFR: NICHIHA -WOOD SERIES VINTAGEWOOD REDWOOD SMOOTH WALL PANEL - WHITE GLOSSY FINISH WP-1: MFR: STONEWOOD -STANDARD SERIES WHITE 5401-AB CORRUGATED STEEL MWP-1: MFR: BRIDGER STEEL PRE-FINISHED SHEET MTL SMF-1: MFR: BRIDGER STEEL GALVUME ALUM STOREFRONT - MATTE BLACK INSPIRATION IMAGES C 8.11.22 C 8.11.22 REVISION SCHEDULE No. Description Date C SITE PLAN REVIEW COMME NTS 2 8.11.22