Loading...
HomeMy WebLinkAbout008 BIG406MOB Water Sewer Storm Design ReportJOB NO. B20-041 MONTANA | WASHINGTON | IDAHO | NORTH DAKOTA | PENNSYLVANIA JANUARY 2022 406.586.0277 tdhengineering.com 234 East Babcock Street Suite 3 Bozeman, MT 59715 CLIENT ENGINEER Bechtle Architects 4515 Valley Commons Drive, #201 Bozeman, MT 59718 TD&H Engineering 234 East Babcock Street, Suite 3 Bozeman, MT 59715 Engineer: Ahren Hastings, PE BIG406LLC MEDICAL OFFICE BUILDING BOZEMAN, MONTANA BASIS OF DESIGN REPORT Image courtesy of Bechtle Architects B20-041 BIG406LLC MEDICAL OFFICE BUILDING Page 1 of 3 BIG406LLC MEDICAL OFFICE BUILDING – PHASE I DESIGN REPORT JANUARY 2022 Purpose and Introduction The purpose of this report is to explain how water, sanitary sewer, and storm drainage improvements will be designed to meet the City of Bozeman requirements and Montana Public Works Standard Specifications (MPWSS) to provide service to Phase I of the new BIG406LLC Medical Office Building proposed in Lot 4 of the Sundance Minor Subdivision at the corner of Galloway St. and Davis Ln. The report will provide information on the detailed design of the above-mentioned infrastructure. The project is located at along the western edge of the right-of-way of Davis Lane between Galloway Street and Equestrian Lane north of Baxter Lane. The parcel is described as Lot 4 of Minor Subdivision 509, located in the SE ¼ of S34, T01 S, R05 E, Gallatin County, Montana and is 3.247 acres in size. The property is currently undeveloped and is within zoning district B-2. Proposed site improvements include the construction of a new multi-story, commercial medical office building with associated parking, landscape, hardscape, utility services, and stormwater management systems. No off-site infrastructure improvements are proposed to service this development. Project construction is proposed to be performed in two phases. Phase I is the subject of this site plan and will include construction of a new 3-story medical office building with an approximate footprint of 8,345 square-feet and a total floor space of 25,038 square-feet. Phase I will also include 101 new parking spaces, new water and sewer services, and an on-site stormwater management system. Phase II will be submitted at an undetermined date under a separate site plan and is anticipated to include expansion of the 3-story medical office building constructed in Phase I. Phase II will also include construction of an additional new parking spaces, as well as the landscape and hardscape associated with the additional parking. The proposed water, sewer, and storm management systems for Phase I are being sized and designed to service the finished site after completion of Phase II. Design Report Water The project lot has an existing water stub at the northwest corner that was installed to accommodate a future main extension to multiple buildings on Lot 4. However, only one building is proposed on this lot and therefore this stub won’t be needed and is proposed to be abandoned. A new 4-inch domestic water service and a fire service line (Size TBD) will be extended to the new building from the existing 8-inch main in Galloway Street. Final service sizing will be verified by the mechanical engineer. The services will be Class 51 ductile iron and be installed per the City of Bozeman Design Standards and Modifications to Montana Public Works Standard Specifications (MPWSS). The estimated domestic water demands for the Phase 1 of the project are summarized B20-041 BIG406LLC MEDICAL OFFICE BUILDING Page 2 of 3 in Table 1 below with supporting assumptions and calculations in accordance with C.O.B. DSSP Section V.A.4 provided in Appendix A. Table 1: Estimated Water Demands Average Day Max. Day Peak Hour Phase 1 Building Demand 7,310 gpd 16,813 gpd 15.23 gpm TABLE 1: Estimated domestic water demands based on an equivalent population of 43 people and a unit rate of 170 gpcd. Calculations can be found in Appendix A. The irrigation system water source is proposed as a new exempt well on the site and will not use the public water supply. Sewer An existing 8-inch sewer stub was extended to the northwest corner project site that was intended for a future main extension to connect multiple buildings on Lot 4. Since there will only be one building on Lot 4, a sewer main stub is no longer needed. A new 6-inch sewer service is proposed from the building, with 6” sewer cleanouts at maximum 100- foot intervals. It is proposed to use the existing sewer stub as a service connection by means of connecting with an 8x6 inch reducer. The new 6” sewer service line will be SDR-26 PVC and will be installed per the City of Bozeman Design Standards and Modifications to Montana Public Works Standard Specifications (MPWSS). The estimated sewer demands for Phase 1 of the project are calculated in accordance with C.O.B. DSSP Section V.B. and using information from the City’s 2015 Wastewater Facilities Plan and DEQ circular 4. The estimated sewer demands for Phase 1 are summarized in Table 2 below with assumptions and supporting calculations provided in Appendix B. Table 2: Estimated Sewer Demands Average Day (gpd) Peak Hour (gpm) New Building Demand 2,800 - Lot Infiltration 480 - Total Sewer Demand 3,280 8.75 TABLE 2: Estimated sanitary sewer demands based on an average daily building occupancy of 280 people and a unit flow rate of 10 gpcd. Calculations can be found in Appendix B. The latest approved Sundance Minor Subdivision engineering design report allocated 2,000 gal/day/acre domestic sewer flow plus 150 gal/day/acre Infiltration flows for Lot 4 based on future anticipated land use. This equates to an allocated 6,981 gpd allocated daily demand for Lot 4 which more than covers the estimated Phase 1 average day demand and leaves an estimated 3,701 gpd available for Phase 2. B20-041 BIG406LLC MEDICAL OFFICE BUILDING Page 3 of 3 Storm Drainage The existing project site consists of a vacant field that slopes generally to the north. The proposed site development includes a new multi-story building, new concrete sidewalks, hardscape patios, new parking areas, and new landscaping. An existing drainage ditch north-to-south along the west edge of the site, and an existing public storm water pond occupies an easement in the southeast corner of the lot. The drainage ditch is the closest outfall location and is proposed to be regraded within the drainage easement along the western property line to accommodate a new sidewalk. Stormwater from the site and subdivision is conveyed north via this drainage ditch to a receiving tributary south of Cattail Street. The proposed site grading directs all on-site runoff to a new stormwater pond at the northwest corner of the site. At the lowest point of the site parking and hardscape, a drainage chase will direct runoff to the combination detention/retention pond with an outfall structure discharging to the adjacent drainage ditch. To accommodate the storm runoff from the buildings, a series of roof drains and drainage chases will direct runoff to the parking lot which will also drain to the stormwater pond. The pond is designed to fully retain/infiltrate the flow from the first half inch of rainfall from site impervious areas. As this will be the only stormwater feature for both phases of the project, the pond has been sized for the full phase 2 buildout of the site. Runoff volumes greater than the first half inch will be allowed to flow to the drainage ditch via a pond outfall structure with a weir positioned above the retention volume elevation designed to restrict flows to pre-development flow rate. The ultimate stormwater destination will be to the receiving tributary south of Cattail Street, with the first half inch of rainfall retained on-site and the overflows flows being restricted to the pre- development runoff rate for the design storm. A geotechnical excavation investigation was conducted at the site on October 25th, 2021. Groundwater was observed from depths of approximately 5 to 7.5 feet below existing grade in test pits with depths of 6.2 to 8.5 feet. Therefore, it is anticipated that groundwater will be sufficiently deep to allow for a retention/infiltration strategy to be successful at this site using an extended detention surface pond per the Montana Post- Construction Stormwater BMP Design Guidance Manual. Perforated pipe in subgrade drains is proposed along the entire length of the pond bottom for settlement of pollutants. The subgrade drains will direct flow to the outfall structure which will have a slot designed to drain the first half inch of rain over a minimum of forty-eight hours to provide time for pollutants to settle prior to discharge. The subgrade drains will allow seasonally high groundwater to drain from the pond bottom and prevent water from stagnating. APPENDIX A Water Calculations BIG406LLC Medical Office Building Galloway St. & Davis Ln. Date: 1.21.2022 Phase 1 Water Demands Domestic Water Demand - New Medical Office Building: Equivalent Population= 43 people (sewer flow / 64.4 gpcd - from 2015 Wastewater Plan) Average Day Demand = 7,310 GPD (170 gppd per COB Design Standards) Peak Hour Demand: Average Day Demand = 7,310 GPD (All Uses) Average Day Demand = 5.08 gpm (GPD / 1,440 minutes) Maximum Day Demand = 11.68 gpm (Ave. Day x Peaking Factor = 2.3) Peak Hour Demand = 15.23 gpm (Ave. Day x Peaking Factor = 3) APPENDIX B Sewer Calculations BIG406LLC MEDICAL OFFICE BUILDING Galloway St. & Davis Ln. Date: 01.21.2022 Phase 1 Sewer Flow Calculation Average Daily Flow: Wastewater Flow Rate = 10.0 GAL./PERSON/DAY (10 gppd for Hostpital, Medical-Employee per MT DEQ-4) Daily medical providers = 14.0 PEOPLE (from architect plans) Daily building staff = 42.0 PEOPLE (3 staff per provider per architect plans) Daily Patients = 224.0 PEOPLE (estimated 16 outpatients per provider per day) Average Total Daily Occupancy = 280.0 PEOPLE Average Daily Flow = 2,800 GPD Infiltration: Property Size = 3.2 acres Infiltration Flow = 480 GPD (150 gpd/acre per COB Design Standards) Peak Sewer Flow: Average Day Demand = 2,800 GPD (total domestic flow) Equivalent Population = 43 Persons (total flow / 64.4 gpcd - from 2015 Wastewater Plan) P = 0.0435 (population/1,000) Peaking Factor = 4.33 Peak Domestic Sewer Demand = 12,114 GPD (avg. day demand)*(peaking factor) + Infiltration Flow = 480 GPD (not peaked) Total Peak Flow = 12,594 GPD (peaked domestic flow + infiltration) Peak Sewer Flow = 8.75 GPM (peak flow)/(24 hrs/day)/(60 min/hr) ௠௔௫ ௔௩௚ = 18 + ℎ ଵ/ଶ 4 + ℎ ଵ/ଶ BIG406LLC MEDICAL OFFICE BUILDING Galloway St. & Davis Ln. Date: 01.21.2022 6" Sewer Service Pipe Capacity Input Values d = 0.50 ft = 6" y = 0.375 ft = 75% Calculated Values (Equations from Fluid Mechanics by Chow) Theta (Θ) 4.19 rad 2*arccos(1-y/(d/2)) Area (A) 0.16 ft2 (1/8)*(Θ-sinΘ)d2 Wetted Perimeter (P) 1.05 ft 0.5Θd Hydraulic Radius (R ) 0.15 ft (.25)*(1-(sinΘ)/Θ)d Top Width (T) 0.43 ft (sin 0.5Θ)d Mannings Equation (Equation from Fundamentals of Mechanics by Munson) n = 0.013 (per COB Design Standards) S0 = 0.0100 ft/ft (1.0% Min. Slope) Q = 0.51 cfs Q = 1.49/n*A*R2/3*S0 0.5 Q = 230.3 gpm Q gpm = (Q cfs)(7.48 gal/ft3)(60 sec/min) V = 3.25 ft/s V = Q/A Results A 6" diameter sewer service flowing 75% full at the min. slope of 1.0% has a carrying capacity of 230.3 gpm. JOB NO. B13-016 GREAT FALLS, BOZEMAN, KALISPELL & SHELBY, MT | SPOKANE, WA | LEWISTON, ID | WATFORD CITY, ND | MEDIA, PA JUNE 2018 406.586.0277 tdhengineering.com 234 East Babcock Street Suite 3 Bozeman, MT 59715 CLIENT ENGINEER Baxter Meadows Land Partners TD&H Engineering 234 East Babcock Street, Suite 3 Bozeman, MT 59715 Engineer: Ahren Hastings, PE WATER, SEWER, PAVING AND STORM DRAINAGE IMPROVEMENTS SUNDANCE SUBDIVISION PHASES A & C INFRASTRUCTRE IMPROVEMENTS BOZEMAN, MONTANA DESIGN REPORT 7-24-18 Ammeded 5.11.2020 to include Equestrian Lane extension to Davis Lane Latest approved Sundance Minor Subdivision Engineering Design Report 3 Each lot in the subdivision has or will have at least an 8-inch sewer stubbed out to the lot. All new sewer mains will be 8-inch diameter SDR 35 PVC. The sewer mains have been sized for the development based upon the following values from the City of Bozeman Design Standards and Specification Policy, Revised 3/31/2011: Residential  2.11 people / unit  188 Units  89 gallons / capita / day  150 gallons / acre / day infiltration  2000 gallons per acre per day average (commercial)  25 gallons per acre per day average (park) New sewer mains will be designed to roughly parallel the road centerline grades. A capacity check on 8-inch sewer main using the minimum slope of 0.4% and a Manning’s friction factor of 0.013 indicates new wastewater flows from the subdivision will not exceed the pipe’s capacity assuming 75% of the maximum capacity. 8-inch sewer mains will be able to adequately handle the flows as described above. However, since this subdivision falls within the Baxter Meadows Lift Station zone adequate capacity must be present in the lift station to support these flows. From the original Baxter Lift Station design report, for B2 zoning, 3,495 gpd/ac was used. This project falls entirely within B-2 zoning and the size of Lots 2, 3, 4, Sundance Park and R2 make up a total of 23.9 acres. Allocated capacity within the lift station is calculated as follows: 3,495 gpd/ac x 23.9 ac = 83,531 gpd / 1440 min/day = 58.0 gpm 150 gpd/ac x 23.9 ac = 3,585 gpd / 1440 min/day = 2.5 gpm Peaking factor from original lift station design report = 3.01 (58.0x3.01)+2.5 = 177.1 gpm (allocated flow in lift station) Estimated flow for this subdivision is calculated as follows: Lots 3, 4 and R2 are commercial and total 11.89 acres 2,000 gpd/ac x 11.89 ac = 23,780 gpd / 1440 min/day = 16.5 gpm Sundance Park total 2.83 acres 25 gpd/ac x 2.83 ac = 70.75gpd / 1440 min/day = 0.05 gpm 150 gpd/ac x 14.72 ac = 2,208 gpd / 1440 min/day = 1.5 gpm Peaking factor from original subdivision design report = 4.1 (16.5 x4.1)+2.5 = 70.2 gpm Lots 2 is 188 residential units and 0.67 acres (29,397 SF) of commercial 2,000 gpd/ac x 0.67 ac = 1,340 gpd / 1440 min/day = 0.9 gpm 188 x 2.11 x 89 = 35,305 gpd / 1440 min/day = 24.5 gpm Sewer flow rates allocated for Lot 4: 2,000 gpd/ac Domestic +150 gpd/ac Infiltration Appendix C Storm Water Calculations c c c HC HC HC HC HC c c c c c c c c c c HC B20-041 DRAINAGE DRAINAGE BASIN & RETENTION FACILITY SIZING .DWG C4.1 TRB CJC ACH SHEET DESIGNED BY: QUALITY CHECK: JOB NO. FIELDBOOK DRAWN BY: DATE: BIG 406 LLC MEDICAL OFFICE BUILDING BOZEMAN, MONTANA B20-041 01.21.22 REV DATE REVISION Engineering 234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715 406.586.0277 • tdhengineering.com SITE PLAN REVIEW A N L E F N E S S I O N G I T O N M A N E E R A O P Big 406 LLC Medical Office Building Date: 01.21.2022 Basin RRV (First 0.5") Calculations Rational Formula "C" Values Per MTDEQ 8 "C" Impervious Area/Pond Surface 0.9 Gravel Area 0.8 Unimproved Area 0.3 Lawn/landscape 0.1 Post-Development Conditions: Basin # Description Total Area (SF) Total Area (AC) Impervious Area (SF) Gravel Area (SF) Unimproved Area (SF) Landscape Area (SF) Composite Cave 1 Whole Site: Post-Development 128,825 2.96 97,239 0 0 31,586 0.70 Runoff Reduction Volume (First 0.5" of Rainfall): P = 0.5 Inches (Water Quality Rainfall Depth) Rv = 0.73 (Dimensionless Runoff Coefficient, R v=0.05+0.9(I) I = 75.5% (Percent Impervious Area Draining to Facility) A = 2.96 AC (Total Drainage Area) RRV = 0.090 AC-FT (Runoff Reduction Volume)* 3,915 CF *RRV = PRvA/12 per Montana Post-Construction Storm Water BMP Design Guidance Manual Eq. 3-1 Big 406 LLC Medical Office Building Date: 01.21.2022 Peak Runoff Tc* Tc* 10 yr Flow Slope Distance CCf t1 Slope k Velocity Distance t2 Total Cave CCf Area Total i Q % ft min % fps ft min min ac min in/hr cfs 1.06 88 0.30 13.80 1.25 0.491 1.80 316 2.92 Tc* Tc* 10 yr Flow Slope Distance CCf t1 Slope k Velocity Distance t2 Total Cave CCf Area Total i Q % ft min % fps ft min min ac min in/hr cfs 1.06 88 0.70 6.83 1.25 0.491 1.80 316 2.92 *Tc minimum of 5 minutes FHWA HEC 22, Eqn 3-4 Cf = 1.0 for 10-year storm event K=0.457 Grassed Water Way (Roadside Ditch) K=0.619 Paved Area K=0.491 Unpaved shallow concentrated flow 9.76 2.084 4.34 Shallow Concentrated Flow Post- Development Site 9.76 0.70 0.70 2.96 TIME OF CONCENTRATION 10 YEAR FLOW CALC Overland Flow Shallow Concentrated Flow 1.30 TIME OF CONCENTRATION 10 YEAR FLOW CALC IDF curve equation for 10-yr storm Tc = time to concentration in hours Rational Method Cf = 1.0 for 10-yr event 0.30 Pre- Development Site 16.72 0.30 2.96 16.72 1.468 Overland Flow 1 3 1 87 1 1 / f c S . ( . CC ) D T - = V = 3 . 28 × k × S ݅ଵ଴ = 0.64 ⋅ ܶ௖ି.଺ହ ܳ = ܣ ⋅ ݅ ⋅ ௙ܥܥ Big 406 LLC Medical Office Building Date: 01.21.2022 25-yr Pipe Flow Calculations 25-Year Flow Calcs: Pipe Capacity Calcs (94% full): Location Basin Size (Acres) C ave CCf Tc (min) 25 yr i (in/hr) Flow Q2 (cfs) Pipe Diameter (d) (ft) Pipe Slope (%) Manning's n 94% Flow Depth (y) (ft) Theta (Θ) (rad.) Area (A) (ft2) Hydraulic Radius (R) (ft) Qfull (cfs) Pond Release Structure Overflow Pipe 2.96 0.70 0.77 9.76 2.49 5.71 1.50 0.50% 0.013 1.41 5.29 1.72 0.43 8.01 0 Manning's Eqn: Q = 1.49/n*A*R 2/3 *S0 0.5 Rational Method Cf = 1.1 for 25-yr event IDF curve equation for 25-yr storm Tc = time to concentration in hours Q = CC f × i × A . 64 i 25 = 0 . 78 × T c - Big 406 LLC Medical Office Building Date: 01.21.2022 Outlet Structure Main Slot Width Calculations Pre-Development Peak Runoff (cfs) C (Constant) Head above Slot (ft) 1.30 3.33 0.5 Slot width= 1.11 ft 13.28 in Q = Discharge (cfs) C = Weir Coefficient = 3.33 L = Length of Weir Opening (ft) Reference - City of Bozeman Standards H = Head (ft) C × L × H 3 / 2 = Q weir Big 406 LLC Medical Office Building Date: 01.21.2022 Outlet Structure Extended Detention Slot Width Calculations Pre-Development Peak Runoff (cfs) C (Constant) Head above Slot (ft) 0.02 3.33 0.75 Slot width= 0.0106 ft 0.128 in Q = Discharge (cfs) C = Weir Coefficient = 3.33 L = Length of Weir Opening (ft) Reference - City of Bozeman Standards H = Head (ft) C × L × H 3 / 2 = Q weir R