Loading...
HomeMy WebLinkAbout007_L1.0TreeProtectionPlan100' WATERCOURSE SETBACK SURVEYED TOP OF BANK 02/08/2022 EXISTING TREES EXISTING SANITARY SEWER; SEE CIVIL 1 L1.0 TREE PROTECTION APPROXIMATE TOP OF BANK APPROXIMATE 100' WATERCOURSE SETBACK LIMIT OF WORK LIMIT OF W O R K LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK LIMIT OF WORKUULC FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONSTORAGE YARD LAYOUTTREE PROTECTION PLANNORTHWESTERN ENERGY EAST LOTPROPOSED TRACT 2BOZEMAN, MTL1.0 -17032_03_TP_PROD.DWGSNH/RRB/KF05/18/221ST SP SUBMITTAL09/02/22-----2ND SP SUBMITTAL-------17032.03TREE PROTECTION PLAN 0 30SCALE: 1'' = 30' 601530 VARIES PER TREE SIZE - EXTEND FROM DRIPLINE TO DRIPLINE 4'-0"SECTION NOTES: 1.IN AREAS WHERE GRADING EXTENDS INTO EXISTING TREE DRIPLINES, CONTRACTOR SHALL HAND GRADE. 2.REMOVAL OF TREE PROTECTION FENCE DURING CONSTRUCTION WILL RESULT IN A $500 PER INCIDENT, PER DAY FINE TO THE CONTRACTOR. 3.TREE PROTECTION FENCE SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITIES. 4.ANY DAMAGED FENCE SHALL BE REPAIRED ON A DAILY BASIS. 5.DEAD TREES, SHRUBS, OR UNDERGROWTH SHALL BE CUT FLUSH WITH ADJACENT GRADE. THERE SHALL BE NO SOIL DISTURBANCE UNDER THE DRIPLINE OF THE TREE TO REMAIN. 6.BOULEVARD TREE PROTECTION FENCING TO BE ADJUSTED TO REFLECT THE WIDTH OF THE TREE LAWN OR TREE GRATE AREA WHERE PROVIDING FENCING TO THE DRIPLINE EXTENTS IS NOT POSSIBLE. 7.PROVIDE SUPPLEMENTAL WATER DURING CONSTRUCTION. INSTALL 6' T-POST 6' ON CENTER AT DRIP LINE OF TREE. INSTALL 4' ORANGE CONSTRUCTION FENCE AROUND TREE. USE 3 CABLE TIES PER POST. FENCING NOT TO BE REMOVED WITHOUT WRITTEN CONSENT OF THE PROJECT REPRESENTATIVE 3" DEPTH MULCH ORGANIC MULCH DO NOT TRENCH, FILL, PARK VEHICLES, OR STORE MATERIALS IN DRIP LINE AREA OF TREE OR WITHIN FENCING TREE PROTECTION N.T.S. PLAN 4' ORANGE CONSTRUCTION FENCE 1