HomeMy WebLinkAbout007_L1.0TreeProtectionPlan100' WATERCOURSE SETBACK
SURVEYED TOP OF BANK
02/08/2022
EXISTING TREES
EXISTING SANITARY SEWER;
SEE CIVIL
1
L1.0
TREE PROTECTION
APPROXIMATE TOP OF BANK
APPROXIMATE 100' WATERCOURSE SETBACK
LIMIT OF WORK
LIMIT
OF
W
O
R
K
LIMIT OF WORK
LIMIT OF WORK
LIMIT OF WORK LIMIT OF WORKUULC FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONSTORAGE YARD LAYOUTTREE PROTECTION PLANNORTHWESTERN ENERGY EAST LOTPROPOSED TRACT 2BOZEMAN, MTL1.0 -17032_03_TP_PROD.DWGSNH/RRB/KF05/18/221ST SP SUBMITTAL09/02/22-----2ND SP SUBMITTAL-------17032.03TREE PROTECTION PLAN
0 30SCALE:
1'' = 30'
601530
VARIES PER TREE SIZE - EXTEND FROM DRIPLINE TO DRIPLINE
4'-0"SECTION
NOTES:
1.IN AREAS WHERE GRADING EXTENDS INTO EXISTING TREE
DRIPLINES, CONTRACTOR SHALL HAND GRADE.
2.REMOVAL OF TREE PROTECTION FENCE DURING CONSTRUCTION
WILL RESULT IN A $500 PER INCIDENT, PER DAY FINE TO THE
CONTRACTOR.
3.TREE PROTECTION FENCE SHALL BE INSTALLED PRIOR TO ANY
LAND DISTURBING ACTIVITIES.
4.ANY DAMAGED FENCE SHALL BE REPAIRED ON A DAILY BASIS.
5.DEAD TREES, SHRUBS, OR UNDERGROWTH SHALL BE CUT FLUSH
WITH ADJACENT GRADE. THERE SHALL BE NO SOIL DISTURBANCE
UNDER THE DRIPLINE OF THE TREE TO REMAIN.
6.BOULEVARD TREE PROTECTION FENCING TO BE ADJUSTED TO
REFLECT THE WIDTH OF THE TREE LAWN OR TREE GRATE AREA
WHERE PROVIDING FENCING TO THE DRIPLINE EXTENTS IS NOT
POSSIBLE.
7.PROVIDE SUPPLEMENTAL WATER DURING CONSTRUCTION.
INSTALL 6' T-POST 6' ON CENTER AT
DRIP LINE OF TREE. INSTALL 4'
ORANGE CONSTRUCTION FENCE
AROUND TREE. USE 3 CABLE TIES PER
POST. FENCING NOT TO BE REMOVED
WITHOUT WRITTEN CONSENT OF THE
PROJECT REPRESENTATIVE
3" DEPTH MULCH ORGANIC MULCH
DO NOT TRENCH, FILL, PARK
VEHICLES, OR STORE MATERIALS IN
DRIP LINE AREA OF TREE OR
WITHIN FENCING
TREE PROTECTION
N.T.S.
PLAN
4' ORANGE CONSTRUCTION
FENCE
1