HomeMy WebLinkAbout005_C5.0GradingAndDrainageFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONSTORAGE YARD LAYOUTGRADING AND DRAINAGE PLANNORTHWESTERN ENERGY EAST LOTPROPOSED TRACT 2BOZEMAN, MTC5.0 -17032_03_GRADING & DRAINAGE_PROD_SP.DWGSNH/RRB/KF05/18/221ST SP SUBMITTAL09/02/22-----2ND SP SUBMITTAL-------17032.030 30
SCALE: 1" = 30'
601530
NORTH
NOTE:
-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE
INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER.
THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION.
SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION)
MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW
REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR
EXACT LOCATIONS.
-ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC
WORKS STANDARD SPECIFICATIONS 6TH EDITION, APRIL, 2010, AND THE CITY OF
BOZEMAN STANDARD MODIFICATIONS, DATED MARCH 31, 2011, WITH ADDENDUM.
-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL
BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED
IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR
ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING
TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.
REGULATORY FLOODWAY
FLOODPLAIN HAZARD
AREA
0.2% ANNUAL FLOOD
HAZARD AREA