HomeMy WebLinkAbout003_C3.0ExistingTopographyAndDemoNORTH
NOTE:
-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE
INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE
ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH
INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER,
TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED
ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY
COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.
-ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA
PUBLIC WORKS STANDARD SPECIFICATIONS 6TH EDITION, APRIL, 2010, AND
THE CITY OF BOZEMAN STANDARD MODIFICATIONS, DATED MARCH 31, 2011,
WITH ADDENDUM.
-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING
SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND
SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY
A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN
CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE
SPECIFIC TYPE OF WORK BEING PERFORMED.FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONSTORAGE YARD LAYOUTEXISTING TOPOGRAPHY AND DEMOLITION PLANNORTHWESTERN ENERGY EAST LOTPROPOSED TRACT 2BOZEMAN, MTC3.0 -17032_03_EXISTING_PROD_SP.DWGSNH/RRB/KF05/18/221ST SP SUBMITTAL09/02/22-----2ND SP SUBMITTAL-------17032.030 30
SCALE: 1" = 30'
601530
REGULATORY FLOODWAY
FLOODPLAIN HAZARD AREA
0.2% ANNUAL FLOOD
HAZARD AREA