HomeMy WebLinkAbout014_STORMWATER_OM September 2, 2022 Project No. 17032.05 STORM DRAINAGE FACILITY MAINTENANCE PLAN FOR NORTHWESTERN ENERGY EAST LOT BOZEMAN, MT OVERVIEW NARRATIVE The purpose of this maintenance plan is to outline the necessary details related to ownership, responsibility and cleaning schedule for the storm drainage facilities for Northwestern Energy East Lot. This plan has been completed in accordance with The City of Bozeman Design Standards and Specifications Policy, dated March 2004. The site stormwater improvements have been designed with the intent to meet the current City of Bozeman drainage regulations for the entire site to the extent feasible. Specific site information and criteria are described below: I. Ownership of Facilities Northwestern Energy Northwestern Energy will own all stormwater facilities which includes a detention facility, outlet structure, and piping within the site boundary. II. Inspection Thresholds for Cleaning Detention Facility Remove trash, debris, yard waste, and accumulated sediment if sediment exceeds 2” beyond design depth. Outlet Structure/Piping Outlet structure is not damaged, clogged, or defective. If sediment in sump exceeds 5 inches or grate is more than 25% clogged with debris. V:17032_NWE_STORMWATER_OM_080522.doc (08/05/22) SNH/ajd III. Cleaning Detention Facility/Outlet Structure/Piping · Remove vegetation and debris from trash racks, pond inlets, and overflow structures. · Check for slumping or sloughing of pond slopes. · Trim vegetation for aesthetics and to prevent the establishment of woody vegetation that may drop leaf litter, fruits, and other vegetative material that may clog facility. · Jet outlet pipe to keep free of clogging. · Remove sediment from pond and structure. IV. Schedule Detention Facility Inspection: Every 6 months and after strong storm events Clean: Every 5 years or as needed based on inspection. Outlet Structure Inspection: Every 6 months and after strong storms Clean: Every 5 years or as needed based on inspection. Piping Inspection: Every 6 months and after storm events Clean: Every 5 years or as needed based on inspection. V. Responsible Party Northwestern Energy Northwestern Energy will be responsible for the inspection and maintenance of all stormwater facilities located within the project limits I agree to the above operation, maintenance and replacement schedule detailed above. Signature: __________________________________________ Northwestern Energy Representative 9/2/22