Loading...
HomeMy WebLinkAbout64-LI100OverallIrrigationPlan8.0000 10.0000 I S I SSSS S S S S S S S S ESEWEW EW EW EW EW EW EWEWEWEW EW EWEWEWE E P CO CO D D D DD D D D D D D D D D D D D D D D M D D D D DD D D D D D DD D D D D D P P P PPPP P P PP P P P P E E EE EEE EEE6" FIRE4" DOMESTIC 6" FIRE 4" DOMESTIC 6" FIRE 4" DOMESTIC 6" FIRE4" DOMESTIC FIRE DOMESTIC FIREDOMESTIC 6" FIRE4" DOMESTIC 6" FIRE4" DOMESTIC 6" FIRE4" DOMESTIC >>>>>>>>>>>>>>>>>>BP BP BP BP BP SDSDSDESEWEW EW EWEWEWEW EW EWEWEW8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8SPHASE 1 PHASE 2 PHASE 1 LIMIT OF WORK LIMIT OF WO R K HARVEST PA R K W A Y TWIN LAKES AVENUEROSA WAYWELLSPRING DRIVE WEST OAK STREET LOT 5 LOT 2 LOT 3 LOT 6 LOT 8 LOT 7 LOT 9 LOT 10 LOT 11 LOT 12LOT 13 PARK 3 NORTHWEST CROSSING SINGLE FAMILY - SEE MASTER SITE PLAN BAXTER CREEK Q Q A W5 Q Q B M2 Q Q Q NORTH 0 2010 40 SCALE 1" = 20' OVERALL IRRIGATION PLAN LI100 LI101 LI102 LI103 LI104 OWNER: DATE: SHEET TITLE: OWNER: DATE: SHEET TITLE:CHECKED BY:DRAWN BY:NWX APARTMENTS - AN ICON COMMUNITYSITE PLAN - PHASE 2BOZEMAN, MONTANANWX APARTMENTS LLC 1735 SOUTH 19TH AVE SUITE B BOZEMAN, MT 59718 OFFICE: 406.582.8100 FAX: 406.582.8108 GH, JSKS, RH10/29/21: SP 01 06/02/22: SP 02 244 North College Avenue #130 Fort Collins, Colorado 80524 P 970.409.3414 www.norris-design.com POC #2 POC #1 POC 75 PSI MIN. 35 GPM MAX 2-INCH #5 CONTROLLER 120 VAC REQUIRED A CONTROLLER 120 VAC REQUIRED B REFER TO PHASE 1 FINAL PLAT IRRIGATION , SHOWN FOR REFERENCE ONLY