HomeMy WebLinkAbout42-LS001LandscapeNotesOWNER:
DATE:
SHEET TITLE:
OWNER:
DATE:
SHEET TITLE:CHECKED BY:DRAWN BY:NWX APARTMENTS - AN ICON COMMUNITYSITE PLAN - PHASE 2BOZEMAN, MONTANANWX APARTMENTS LLC
1735 SOUTH 19TH AVE
SUITE B
BOZEMAN, MT 59718
OFFICE: 406.582.8100
FAX: 406.582.8108
GH, JSKS, RH10/29/21: SP 01
06/02/22: SP 02
244 North College Avenue #130
Fort Collins, Colorado 80524
P 970.409.3414
www.norris-design.com
LANDSCAPE
NOTES
LS001
1.THE CONTRACTOR AND OWNER'S REPRESENTATIVE SHALL CONTACT THE
LANDSCAPE ARCHITECT FOR A PRE-CONSTRUCTION MEETING PRIOR TO
START OF ANY WORK SHOWN ON THESE PLANS.
2.THESE PLANS SHALL NOT BE UTILIZED FOR CONSTRUCTION OR PERMITTING
UNLESS STATED FOR SUCH USE IN THE TITLE BLOCK.
3.DRAWINGS ARE INTENDED TO BE PRINTED ON 24 X 36 PAPER. PRINTING THESE
DRAWINGS AT A DIFFERENT SIZE WILL IMPACT THE SCALE. VERIFY THE
GRAPHIC SCALE BEFORE REFERENCING ANY MEASUREMENTS ON THESE
SHEETS. THE RECIPIENT OF THESE DRAWINGS SHALL BE RESPONSIBLE FOR
ANY ERRORS RESULTING FROM INCORRECT PRINTING, COPYING, OR ANY
OTHER CHANGES THAT ALTER THE SCALE OF THE DRAWINGS.
4.VERIFY ALL PLAN DIMENSIONS PRIOR TO START OF CONSTRUCTION. NOTIFY
THE OWNER'S REPRESENTATIVE TO ADDRESS ANY QUESTIONS OR CLARIFY
ANY DISCREPANCIES.
5.WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS.
6.SUBMIT A CHANGE ORDER FOR APPROVAL FOR ANY CHANGES TO WORK
SCOPE RESULTING FROM FIELD CONDITIONS OR DIRECTION BY OWNER'S
REPRESENTATIVE WHICH REQUIRE ADDITIONAL COST TO THE OWNER PRIOR
TO PERFORMANCE OF WORK.
7.THE CONTRACTOR SHALL PROVIDE A STAKED LAYOUT OF ALL SITE
IMPROVEMENTS FOR INSPECTION BY THE OWNER'S REPRESENTATIVE AND
MAKE MODIFICATIONS AS REQUIRED. ALL LAYOUT INFORMATION IS AVAILABLE
IN DIGITAL FORMAT FOR USE BY THE CONTRACTOR.
8.IF A GEOTECHNICAL SOILS REPORT IS NOT AVAILABLE AT THE TIME OF
CONSTRUCTION, NORRIS DESIGN RECOMMENDS A REPORT BE AUTHORIZED
BY THE OWNER AND THAT ALL RECOMMENDATIONS OF THE REPORT ARE
FOLLOWED DURING CONSTRUCTION. THE CONTRACTOR SHALL USE THESE
CONTRACT DOCUMENTS AS A BASIS FOR THE BID. IF THE OWNER ELECTS TO
PROVIDE A GEOTECHNICAL REPORT, THE CONTRACTOR SHALL REVIEW THE
REPORT AND SUBMIT AN APPROPRIATE CHANGE ORDER TO THE OWNER'S
REPRESENTATIVE IF ADDITIONAL COSTS ARE REQUESTED.
9.CONTRACTOR SHALL CONFIRM THAT SITE CONDITIONS ARE SIMILAR TO THE
PLANS, WITHIN TOLERANCES STATED IN THE CONTRACT DOCUMENTS, AND
SATISFACTORY TO THE CONTRACTOR PRIOR TO START OF WORK. SHOULD
SITE CONDITIONS BE DIFFERENT THAN
REPRESENTED ON THE PLANS OR UNSATISFACTORY TO THE CONTRACTOR,
THE CONTRACTOR SHALL CONTACT THE OWNER'S REPRESENTATIVE FOR
CLARIFICATION AND FURTHER DIRECTION.
10.CONTRACTOR IS RESPONSIBLE TO PAY FOR, AND OBTAIN, ANY REQUIRED
APPLICATIONS, PERMITTING, LICENSES, INSPECTIONS AND METERS
ASSOCIATED WITH WORK.
11.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY FINES OR PENALTIES
ASSESSED TO THE OWNER RELATING TO ANY VIOLATIONS OR
NON-CONFORMANCE WITH THE PLANS, SPECIFICATIONS, CONTRACT
DOCUMENTS, JURISDICTIONAL CODES, AND REGULATORY AGENCIES.
12.THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL
UTILITY LOCATES PRIOR TO ANY EXCAVATION. REFER TO ENGINEERING
UTILITY PLANS FOR ALL PROPOSED UTILITY LOCATIONS AND DETAILS. NOTIFY
OWNER'S REPRESENTATIVE IF EXISTING OR PROPOSED UTILITIES INTERFERE
WITH THE ABILITY TO PERFORM WORK.
13.UNLESS IDENTIFIED ON THE PLANS FOR DEMOLITION OR REMOVAL, THE
CONTRACTOR IS RESPONSIBLE FOR THE COST TO REPAIR UTILITIES,
ADJACENT OR EXISTING LANDSCAPE, ADJACENT OR EXISTING PAVING, OR ANY
PUBLIC AND PRIVATE PROPERTY THAT IS DAMAGED BY THE CONTRACTOR OR
THEIR SUBCONTRACTOR'S OPERATIONS DURING INSTALLATION,
ESTABLISHMENT OR DURING THE SPECIFIED MAINTENANCE PERIOD. ALL
DAMAGES SHALL BE REPAIRED TO PRE-CONSTRUCTION CONDITIONS AS
DETERMINED BY THE OWNER'S REPRESENTATIVE. CONTRACTOR SHALL BE
RESPONSIBLE FOR LOGGING ANY DAMAGES PRIOR TO START OF
CONSTRUCTION AND DURING THE CONTRACT PERIOD.
14.ALL WORK SHALL BE CONFINED TO THE AREA WITHIN THE CONSTRUCTION
LIMITS AS SHOWN ON THE PLANS. ANY AREAS OR IMPROVEMENTS DISTURBED
OUTSIDE THESE LIMITS SHALL BE RETURNED TO THEIR ORIGINAL CONDITION
AT THE CONTRACTOR'S EXPENSE. IN THE EVENT THE CONTRACTOR REQUIRES
A MODIFICATION TO THE CONSTRUCTION LIMITS, WRITTEN PERMISSION MUST
BE OBTAINED FROM THE OWNER'S REPRESENTATIVE PRIOR TO ANY
DISTURBANCE OUTSIDE OF THE LIMITS OF WORK.
15.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OF ANY OF THEIR
TRENCHES OR EXCAVATIONS THAT SETTLE.
16.THE CONTRACTOR SHALL BE RESPONSIBLE TO PREPARE AND SUBMIT A
TRAFFIC CONTROL PLAN TO THE APPROPRIATE JURISDICTIONAL AGENCIES
AND THE OWNER'S REPRESENTATIVE IF THEIR WORK AND OPERATIONS
AFFECT OR IMPACT THE PUBLIC RIGHTS-OF-WAY. OBTAIN APPROVAL PRIOR
TO ANY WORK WHICH AFFECTS OR IMPACTS THE PUBLIC RIGHTS-OF-WAY. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR ANY FINES OR PENALTIES
ASSESSED TO THE OWNER RELATING TO THIS REQUIREMENT DURING THE
CONTRACT PERIOD.
17.SIGHT TRIANGLES AND SIGHT LINES SHALL REMAIN UNOBSTRUCTED BY
EQUIPMENT, CONSTRUCTION MATERIALS, PLANT MATERIAL OR ANY OTHER
VISUAL OBSTACLE DURING THE CONTRACT PERIOD AND AT MATURITY OF
PLANTS PER LOCAL JURISDICTIONAL REQUIREMENTS.
18.NO PLANT MATERIAL OTHER THAN GROUND COVER IS ALLOWED TO BE
PLANTED ADJACENT TO FIRE HYDRANTS AS STIPULATED BY JURISDICTIONAL
REQUIREMENTS.
19.COORDINATE SITE ACCESS, STAGING, STORAGE AND CLEANOUT AREAS WITH
OWNER'S REPRESENTATIVE.
20.CONTRACTOR IS RESPONSIBLE FOR PROVIDING TEMPORARY SAFETY FENCING
AND BARRIERS AROUND ALL IMPROVEMENTS SUCH AS WALLS, PLAY
STRUCTURES, EXCAVATIONS, ETC. ASSOCIATED WITH THEIR WORK UNTIL
SUCH FACILITIES ARE COMPLETELY INSTALLED PER THE PLANS,
SPECIFICATIONS AND MANUFACTURER'S RECOMMENDATIONS.
21.CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF THEIR MATERIAL
STOCK PILES AND WORK FROM VANDALISM, EROSION OR UNINTENDED
DISTURBANCE DURING THE CONSTRUCTION PERIOD AND UNTIL FINAL
ACCEPTANCE IS ISSUED.
22.THE CONTRACTOR SHALL KNOW, UNDERSTAND AND ABIDE BY ANY STORM
WATER POLLUTION PREVENTION PLAN (SWPPP) ASSOCIATED WITH THE SITE.
IF A STORM WATER POLLUTION PREVENTION PLAN IS NOT PROVIDED BY THE
OWNER'S REPRESENTATIVE, REQUEST A COPY BEFORE PERFORMANCE OF
ANY SITE WORK.
23.MAINTAIN ANY STORM WATER MANAGEMENT FACILITIES THAT EXIST ON SITE
FOR FULL FUNCTIONALITY. THE CONTRACTOR SHALL INSTALL AND MAINTAIN
ANY NEW STORM WATER MANAGEMENT FACILITIES THAT ARE IDENTIFIED IN
THE SCOPE OF WORK TO FULL FUNCTIONALITY. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR ANY FINES OR PENALTIES ASSESSED TO THE OWNER FOR
FAILURE TO MAINTAIN STORM WATER MANAGEMENT FACILITIES DURING THE
CONTRACT PERIOD.
24.THE CONTRACTOR SHALL PREVENT SEDIMENT, DEBRIS AND ALL OTHER
POLLUTANTS FROM EXITING THE SITE OR ENTERING THE STORM SEWER
SYSTEM DURING ALL DEMOLITION OR CONSTRUCTION OPERATIONS THAT ARE
PART OF THIS PROJECT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY
FINES OR PENALTIES ASSESSED TO THE OWNER RELATING TO THESE
REQUIREMENTS DURING THEIR CONTRACTED COURSE OF WORK.
25.THE CONTRACTOR SHALL BE RESPONSIBLE TO PREVENT ANY IMPACTS TO
ADJACENT WATERWAYS, WETLANDS, OR OTHER ENVIRONMENTALLY
SENSITIVE AREAS RESULTING FROM WORK DONE AS PART OF THIS PROJECT.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY FINES OR PENALTIES
ASSESSED TO THE OWNER RELATING TO THESE STANDARDS DURING THEIR
CONTRACTED COURSE OF WORK.
26.THE CONTRACTOR AND/OR THEIR AUTHORIZED AGENTS SHALL INSURE THAT
ALL LOADS OF CONSTRUCTION MATERIAL IMPORTED TO OR EXPORTED FROM
THE PROJECT SITE SHALL BE PROPERLY COVERED TO PREVENT LOSS OF
MATERIAL DURING TRANSPORT. TRANSPORTATION METHODS ON PUBLIC
RIGHT-OF WAYS SHALL CONFORM TO JURISDICTIONAL REQUIREMENTS. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR ANY FINES OR PENALTIES
ASSESSED TO THE OWNER RELATING TO THESE REQUIREMENTS.
27.THE CLEANING OF EQUIPMENT IS PROHIBITED AT THE JOB SITE UNLESS
AUTHORIZED BY THE OWNER'S REPRESENTATIVE IN A DESIGNATED AREA. THE
DISCHARGE OF WATER, WASTE CONCRETE, POLLUTANTS, OR OTHER
MATERIALS SHALL ONLY OCCUR IN AREAS DESIGNED FOR SUCH USE AND
APPROVED BY THE OWNER'S REPRESENTATIVE.
28.THE CLEANING OF CONCRETE EQUIPMENT IS PROHIBITED AT THE JOB SITE
EXCEPT IN DESIGNATED CONCRETE WASHOUT AREAS. THE DISCHARGE OF
WATER CONTAINING WASTE CONCRETE IN THE STORM SEWER IS PROHIBITED.
29.THE USE OF REBAR, STEEL STAKES, OR STEEL FENCE POSTS TO STAKE DOWN
STRAW OR HAY BALES OR TO SUPPORT SILT FENCING USED AS AN EROSION
CONTROL MEASURE IS PROHIBITED.
30.OPEN SPACE SWALES: IF SWALES ARE EXISTING ON SITE AND ARE NOT
INTENDED TO BE MODIFIED AS PART OF THE PLANS, THE CONTRACTOR SHALL
BE RESPONSIBLE TO MAINTAIN THE CONVEYANCE OF WATER WITHIN THE
SWALES DURING THE CONTRACT PERIOD. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR ANY DIVERSION OR PUMPING OF WATER IF REQUIRED TO
COMPLETE WORK. ANY SWALES DISTURBED BY THE CONTRACTOR SHALL BE
REPAIRED/RESTORED TO THEIR ORIGINAL CONDITION. IF THE SWALE NEEDS
TO BE DISTURBED OR MODIFIED FOR ANY REASON, THE CONTRACTOR SHALL
NOTIFY THE OWNER'S REPRESENTATIVE FOR APPROVAL PRIOR TO
DISTURBANCE.
31.DETENTION AND WATER QUALITY PONDS: IF DETENTION PONDS AND WATER
QUALITY PONDS ARE EXISTING ON SITE AND ARE NOT INTENDED TO BE
MODIFIED AS PART OF THE PLANS, THE CONTRACTOR SHALL MINIMIZE
DISTURBANCE TO THE PONDS, DRAINAGE STRUCTURES AND SPILLWAYS
DURING CONSTRUCTION. ALL PONDS, DRAINAGE STRUCTURES AND
SPILLWAYS SHALL BE MAINTAINED IN OPERABLE CONDITIONS AT ALL TIMES.
ANY POND OR SPILLWAY AREAS DISTURBED BY THE CONTRACTOR SHALL BE
REPAIRED/RESTORED TO THEIR ORIGINAL CONDITION. IF THE POND NEEDS TO
BE DISTURBED OR MODIFIED FOR ANY REASON, THE CONTRACTOR SHALL
NOTIFY THE OWNER'S REPRESENTATIVE FOR APPROVAL PRIOR TO
DISTURBANCE.
32.MAINTENANCE ACCESS BENCHES: IF MAINTENANCE BENCHES OR ACCESS
ROADS EXIST ON SITE AND ARE NOT INTENDED TO BE MODIFIED AS PART OF
THE PLANS, THE CONTRACTOR SHALL MINIMIZE DISTURBANCE TO THE
BENCHES OR ACCESS ROADS DURING CONSTRUCTION. ANY BENCHES OR
ACCESS ROADS DISTURBED BY THE CONTRACTOR SHALL BE
REPAIRED/RESTORED TO THEIR ORIGINAL CONDITION. THE CONTRACTOR
SHALL MAINTAIN ACCESS TO ALL EXISTING BENCHES AND ACCESS ROADS
DURING THE CONSTRUCTION PERIOD. IF ACCESS NEEDS TO BE BLOCKED FOR
ANY REASON, THE CONTRACTOR SHALL NOTIFY THE OWNER'S
REPRESENTATIVE FOR APPROVAL PRIOR TO INTERRUPTION OF ACCESS.
33.LOCAL, STATE AND FEDERAL JURISDICTIONAL REQUIREMENTS, RESTRICTIONS
OR PROCEDURES SHALL SUPERSEDE THESE PLANS, NOTES AND
SPECIFICATIONS WHEN MORE STRINGENT. NOTIFY THE OWNER'S
REPRESENTATIVE IF CONFLICTS OCCUR.
GENERAL NOTES
1.THE CONTRACTOR SHALL INSTALL OR COORDINATE INSTALLATION OF SLEEVING FOR
IRRIGATION AND UTILITY IMPROVEMENTS PRIOR TO INSTALLING ALL PAVING. REFER TO
IRRIGATION AND UTILITY PLANS FOR SIZE AND LOCATIONS.
2.CONTRACTOR SHALL COORDINATE AND BE RESPONSIBLE FOR ALL SUB-GRADE COMPACTION
UNDER PAVED AREAS. REFER TO PLANS, DETAILS, SPECIFICATIONS OR GEOTECHNICAL
REPORTS WHICH IDENTIFY COMPACTION REQUIREMENTS. COORDINATE ALL COMPACTION
TESTING WITH OWNER'S REPRESENTATIVE. CONTRACTOR SHALL BE FINANCIALLY
RESPONSIBLE FOR THE REPLACEMENT OF ANY PAVING THAT CRACKS OR MOVES RESULTING
FROM IMPROPER COMPACTION.
3.CURVED WALKS AND CURB EDGES ARE INTENDED TO BE CONSTRUCTED WITH SMOOTH
FLOWING CURVES. ANYTHING OTHER THAN SMOOTH FLOWING CURVES WILL BE REJECTED AS
DETERMINED BY THE OWNER'S REPRESENTATIVE.
4.LAYOUT ALL SURFACING, SCORE JOINTS AND PAVING PATTERNS AS CLOSELY AS POSSIBLE
TO PLANS, DETAILS, AND SPECIFICATIONS. DO NOT DEVIATE FROM PLANS UNLESS SPECIFIC
APPROVAL IS OBTAINED FROM THE OWNER'S REPRESENTATIVE.
5.CONTRACTOR SHALL COORDINATE A FORM INSPECTION WITH THE OWNER'S
REPRESENTATIVE NO LESS THEN 24 HOURS PRIOR TO PLACEMENT OF ANY SURFACING.
6.CONCRETE EDGES, SAW CUTS AND/OR TROWELED SCORE JOINTS SHALL BE CRISP, CLEAN,
COMPLETE AND NEAT IN APPEARANCE. LOCATE ALL JOINTS AS IDENTIFIED ON THE PLANS OR
AS DIRECTED BY THE OWNER'S REPRESENTATIVE.
7.ALL EXPOSED PAVING SHALL BE FINISHED PER DETAILS.
8.CONTRACTOR SHALL PROVIDE ALL PROTECTION AND FACILITIES NECESSARY TO INSURE
PROPER CURING AND FINISH OF PAVING.
PAVING LAYOUT NOTES
1.WRITTEN DIMENSIONS WILL TAKE PRECEDENCE OVER SCALED DIMENSIONS.
2.SHOULD SITE CONDITIONS BE DIFFERENT THAN WHAT IS INDICATED ON THE
DRAWINGS CONTACT THE LANDSCAPE ARCHITECT IMMEDIATELY FOR
CLARIFICATION.
3.CURVED WALKS AND CURB EDGES ARE INTENDED TO BE CONSTRUCTED WITH
SMOOTH FLOWING CURVES. ANYTHING OTHER THAN SMOOTH FLOWING CURVES
WILL BE REJECTED.
4.THE CONTRACTOR SHALL OBTAIN, AT THEIR EXPENSE, ALL PERMITS WHICH ARE
NECESSARY TO PERFORM THE PROPOSED WORK.
5.THE CONTRACTOR SHALL COORDINATE WITH THE OWNER REGARDING WHO WILL
PROVIDE SURVEY SERVICES FOR LAYOUT OF THE WORK.
6.THE CONTRACTOR SHALL REVIEW WITH OWNER'S REPRESENTATIVE AND
LANDSCAPE ARCHITECT ALL STAKING PRIOR TO SETTING FORMS OR
COMPLETING FLATWORK AND PERFORM MINOR MODIFICATIONS AS REQUIRED TO
ACHIEVE PROPER DRAINAGE OR ACCESSIBILITY AS REQUIRED FOR THE DESIGN,
AT NO ADDITIONAL COST TO THE OWNER.
7.THE CONTRACTOR SHALL INSTALL SLEEVING FOR IRRIGATION IMPROVEMENTS
PRIOR TO INSTALLING CONCRETE FLATWORK. REFER TO IRRIGATION PLANS.
8.LAYOUT WALKS, SCORE JOINTS AND PAVING PATTERNS AS CLOSELY AS
POSSIBLE TO PLANS, DETAILS, AND SPECIFICATIONS. DO NOT DEVIATE FROM
PLANS UNLESS SPECIFIC APPROVAL IS OBTAINED FROM THE OWNER'S
REPRESENTATIVE.
9.ALL WORK SHALL BE CONFINED TO THE AREA WITHIN THE CONSTRUCTION LIMITS
AS SHOWN ON THE PLANS. ANY AREAS OR IMPROVEMENTS DISTURBED OUTSIDE
THESE LIMITS SHALL BE RETURNED TO THEIR ORIGINAL CONDITION AT THE
CONTRACTOR'S EXPENSE. IN THE EVENT THE CONTRACTOR REQUIRES A
MODIFICATION TO THE CONSTRUCTION LIMITS, WRITTEN PERMISSION MUST BE
OBTAINED FROM THE LANDSCAPE ARCHITECT PRIOR TO ANY DISTURBANCE
OUTSIDE OF THE LIMITS OF WORK. SEE TECHNICAL SPECIFICATIONS.
10.WHEN APPLICABLE CONTRACTOR IS RESPONSIBLE FOR PROVIDING TEMPORARY
FENCING AROUND ALL PLAY STRUCTURES UNTIL PROPER FALL SURFACE IS
COMPLETELY INSTALLED PER MANUFACTURER'S SPECIFICATIONS.
11.CONTRACTOR IS RESPONSIBLE FOR SUPERVISING ALL SAFETY SURFACING AND
PAVEMENT DURING THE CURING PROCESS.
LAYOUT NOTES
1.THE CONTRACTOR IS TO REVIEW, UNDERSTAND AND ADHERE TO SPOT ELEVATIONS AND
CONTOURS AS INDICATED ON THE GRADING PLAN UNLESS SPECIFICALLY AUTHORIZED BY THE
OWNER'S REPRESENTATIVE. CONTRACTOR SHALL VERIFY THAT ALL MINIMUM AND MAXIMUM
SLOPES IDENTIFIED ON THE PLANS ARE ACHIEVABLE IN THE FIELD PRIOR TO START OF WORK.
2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL STAKING NECESSARY
TO COMPLETE THE WORK. THIS SHALL INCLUDE ANY RE-STAKING IF NECESSARY. THE
CONTRACTOR SHALL PAY FOR ALL STAKING FOR THE PROJECT UNLESS SPECIFICALLY
AGREED TO OTHERWISE IN THE CONTRACT DOCUMENTS.
3.ALL AREAS SHALL BE GRADED TO ACHIEVE POSITIVE DRAINAGE. MINIMUM SLOPE ON
LANDSCAPED AREAS SHALL BE 2%; MAXIMUM SLOPE SHALL BE 25% (4:1) UNLESS OTHERWISE
INDICATED ON THE PLANS.
4.MAXIMUM ALLOWED FINAL GRADES FOR LONGITUDINAL SLOPE ON WALKS AND PAVED AREAS
SHALL BE 5% UNLESS OTHERWISE INDICATED ON THE PLANS.
5.ALL FINAL GRADES FOR WALKS SHALL HAVE A MINIMUM 1% CROSS SLOPE AND MAXIMUM 2%
CROSS SLOPE UNLESS OTHERWISE INDICATED ON THE PLANS.
6.EXCAVATION INCLUDES ALL MATERIAL ENCOUNTERED TO WHATEVER DEPTH INDICATED ON
THE PLANS. EXCAVATE TO ALLOW FOR PROPER FILL MATERIAL, SLABS, VOIDS, FORMS, AND
FOUNDATIONS.
7.REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION REGARDING GRADING AND
EXCAVATION INCLUDING GUIDELINES AND RESTRICTIONS FOR EARTHWORK AND PLACING OF
PAVEMENT AND LANDSCAPE SURFACING FOR THIS PROJECT.
8.CONTRACTOR SHALL ENSURE EXISTING GRADES ARE WITHIN 0.1 OF A FOOT PRIOR TO START
OF WORK, AND SHALL NOTIFY OWNER'S REPRESENTATIVE IF CONDITIONS ARE DIFFERENT,
PRIOR TO THE START OF WORK.
9.CONTRACTOR SHALL ENSURE THEIR COMPLETED GRADES ARE WITHIN 0.01 OF A FOOT WHEN
COMPLETED WITH WORK.
10.FINISH GRADE SHOWN ON THESE PLANS SHALL REPRESENT COMPACTION REQUIREMENTS AS
DEFINED BY PLANS, DETAILS, AND SPECIFICATIONS.
GRADING NOTES
PERFORMANCE POINTS
TOTAL POINTS REQUIRED 23
INSTALLATION OF 50 PERCENT OR GREATER OF THE SURFACE
AREA OF THE SETBACK WITH DROUGHT TOLERANT SPECIES OF
HERBACEOUS PERENNIALS, AND GRASSES ACCEPTING OF
MAINTENANCE BY ANNUAL MOWING AND LIMITED IRRIGATION.
INSTALLATION OF DROUGHT TOLERANT SPECIES FOR GREATER
THAN 50% AND LESS THAN 75% OF THE NUMBER OF TREES AND
SHRUBS
LANDSCAPE SETBACK COMBINATION FROM TABLE 38.550.060-2
FOUNDATION PLANTINGS OBSCURE > 70% OF THE BUILDING
PERIMETER
38.550.060.B.I.A
38.550.060.B.I.B
38.550.060.B.2.A
38.550.060.B.3.A
PARKING LOT LEGEND
SYMBOL
AMOUNT OF INTERNAL PARKING LOT LANDSCAPE NEEDED:
AMOUNT OF INTERNAL PARKING LOT LANDSCAPE MIN. 8'X8'
TREE REQUIREMENT: 1 TREE / 9 PARKING STALLS
REQUIRED: 21 TREES
PROVIDED: 23 TREES
TOTAL POINTS PROVIDED
3,720
6,610
DESCRIPTION POINTS
WATER SMART PLANTS
PLANT TYPE QTY WATER SMART %WATER SMART
TREES / SHRUBS 1,092 589 54%
PERENNIALS / GRASSES 476 157 33%
3
3
15
2
23
BIKE PARKING REQUIREMENT
10% OF NUMBER OF AUTOMOBILE PARKING STALLS
AUTOMOBILE PARKING
STALLS BIKE PARKING REQUIRED BIKE PARKING PROVIDED TOTAL BIKE RACKS
255 26 26 10²
1. (1) BICYCLE RACK EQUALS 2 BICYCLE PARKING SPACES
2. AN ADDITIONAL (3) PARKING STALLS WILL BE PROVIDED IN PHASE 1