Loading...
HomeMy WebLinkAbout21433 21434 21435 Notice NOTICE OF SITE PLAN APPLICATION Project Name: Icon at Northwest Crossing (NWX) Master Site Plan (MSP), Phase 1 Site Plan (SP), and Phase 2 Site Plan Application:  21433 Icon at Northwest Crossing Master Site Plan  21434 Icon at Northwest Crossing Phase 1 SP  21435 Icon at Northwest Crossing Phase 2 SP Summary: A master site plan, phase 1 site plan, and phase 2 site plan application to construct a total of 336 apartment homes in nine (9) phases in phase 1 of the Northwest Crossing Subdivision NW of the corner of West Oak St. and North Cottonwood Rd. The first phase includes 202 dwelling units in three (3) different building types, a clubhouse, and maintenance building across two (2) lots. Phase 2 includes 134 dwelling units in three (3) different building types. All phases in the site development include off-street parking, access, sidewalks, landscaping, open space, and other associated site improvements. This development is responsible for a portion of the Northwest Crossing park development, known as P3 East within the Northwest Crossing Master Park Plan. The master site plan allows for phasing and construction over a maximum 5-year entitlement period. Each individual site plan for phases 1 and 2 allows for construction over a maximum of 2-years for each phase. The public may comment on the development as a whole with the MSP application, or specifically just the phase 1 or 2 applications, a description of how to view the application materials electronically is detailed below. Parcel size: 14.98 Acres Total, 9.72 Acres Phase 1, 5.26 Acres Phase 2 Location: NE of the corner of West Oak St. & Rosa Way, NW of the corner of West Oak St. & Twin Lakes Ave., and SE of the corner of Rosa Way and Harvest Pkwy. Legal Description: Block 1 Lot 1, Block 3 Lot 13, and Block 4 Lot 14 of Lot of Northwest Crossing Phase 1 Subdivision, NE ¼ Section 4, T 02S, R05 E P.M.M., City of Bozeman, Gallatin County, Montana. Noticing: Public Comment Period 10/13/22 – 10/28/22 Newspaper Legal Ad NA Site Post 10/13/22 Adjacent Owners Mailed 10/13/22 Advisory Boards: Board Community Development Board acting as the Design Review Board for comments and recommendations related to design. Meeting Date(s) 11/7/22 Decision: Authority Director of Community Development Decision Within 10 days of close of public notice period This application is evaluated against the site plan criteria of Section 38.230.100 of the Bozeman municipal code (BMC) and associated standards. Per 38.230.100.B, BMC, approval is granted if all criteria are met. The public may comment in writing regarding compliance of this application with the required criteria. Comments should identify the specific criteria of concern along with facts in support of the comment. Per 38.250.070.B, BMC, issues not raised during public comment period may not be raised on appeal. During the notice period the City will continue review for compliance with applicable regulations. The most recent version of this application was received digitally. Online access to this application is available at: https://www.bozeman.net/departments/community- development/planning/project-information-portal. Select ‘Project Documents’ and navigate to application 21433, 21434, and 21435 to view the full applications. Digital access is also available at the Community Development Department at 20 E. Olive Street, Bozeman, MT Comments may be directed via email to Danielle Garber, dgarber@bozeman.net or agenda@bozeman.net. Written comments may be directed to: City of Bozeman Department of Community Development, ATTN: Planner Garber, PO Box 1230, Bozeman, MT 59771-1230. For those who require accommodations for disabilities, please contact the ADA Coordinator Mike Gray, at 582-3232 (voice), 582-2301 (TDD). Please reference Application 21433, 21434, or 21435 in any correspondence. See the following for additional information submitted by the applicant.