Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
GroundwaterNoteonPPlat
©COPYRIGHT MORRISON-MAIERLE, INC.,2021 PLOTTED DATE: Jan/13/2021 PLOTTED BY: cody farley DRAWING NAME: N:\5659\005 NWX Phase 1 Major Sub\ACAD\Survey\PPLAT\5659005_NWX-PH1_PPLAT PLOT.dwg 1/4 SEC.SECTION TOWNSHIP RANGE PROJ. #:SHEET OF PRINCIPAL MERIDIAN, MONTANA COUNTY, MONTANADATE: SCALE: CLIENT: FIELD WORK: DRAWN BY: CHECKED BY: engineers surveyors planners scientists MorrisonMaierle 2880 Technology Blvd West Bozeman, MT 59718 Phone: 406.587.0721 Fax: 406.922.6702 55NWX, LLC GALLATIN 5659.005 NO SCALE 01/2021 MEE CJF MMI 5E 2S 04NE CONDITIONS OF APPROVAL SHEET Conditions: Buyers of property should ensure that they have obtained and reviewed all sheets of the plat and all documents recorded and filed in conjunction with the plat and buyers of property are strongly encouraged to contact the local planning department and become informed of any limitations on the use of the property prior to closing. The undersigned property owner acknowledges that there are federal, state, and local plans, policies, regulations, and/or conditions of subdivision approval that may limit the use of the property, including the location, size, and use. 1.All street rights-of-way contiguous to or within the proposed development site not used for street pavement, curbs, gutters, sidewalks or driveways (i.e., street boulevards) shall be landscaped, as defined in the Bozeman Municipal Code, and shall include one (1) large canopy tree for each 50 feet of total street frontage rounded to the nearest whole number. For street trees, a City of Bozeman planting permit for street trees and obtaining utility locations before any excavation begins in the City of Bozeman right-of-way. The subdivision landscape plans shall contain a planting note stating that the planting hole shall be at least twice the diameter of the root ball, that the root flare of the newly planted tree is visible and above ground, and there shall be a mulch ring 3'- 4' in diameter around each newly planted boulevard tree. 2.City standard sidewalks (including a concrete sidewalk section through all private drive approaches) shall be constructed on all public and private street frontages prior to occupancy of any structure on individual lots. Upon the third anniversary of the plat recordation of any phase of the subdivision, any lot owner who has not constructed the required sidewalk shall, without further notice, construct within 30 days, the sidewalk for their lot(s), regardless of whether other improvements have been made upon the lot. 3.The property is also subject to master site plan approval City of Bozeman application ______ approved on _______. 4.Ownership of all common open space areas and responsibility of maintenance thereof and for city assessments levied on the common open space lands shall be that of the property owners' association. Maintenance responsibility must include, in addition to the common open space all vegetative ground cover, boulevard trees and irrigation systems in the public right-of-way boulevard strips along all external perimeter development streets and as adjacent to public parks or other common open space areas. All areas within the subdivision that are designated herein as common open space, including pathways, are for the use and enjoyment by the residents of the development and the general public. The property owners' association is responsible for levying annual assessments to provide for the maintenance, repair, and upkeep of all common open space areas and trails. At the same time of recording the final plat the subdivider shall transfer ownership of all common open space aras tot eh property owners' association created by the subdivider to maintain all common open space areas within the Subdivision. 5.Maintenance of stormwater infrastructure is the responsibility of the property owners' association. 6.Due to the potential of high groundwater tables in the areas of the subdivision, it is not recommended that residential dwellings or other structures with full or partial basements be constructed without first consulting a professional engineer licensed in the State of Montana and qualified in the certification of residential and commercial construction. 7.The property owners' association is responsible for maintenance of the alley - _______________. 8.The property owners' association is responsible for maintenance of any lighting located outside of public street rights-of-ways. 9.The property owners' association is responsible for maintenance of all stormwater infrastructure located outside public street rights-of-way. 10.Water rights, or cash-in-lieu of water rights, have not been provided with this subdivision and will be required during the site plan review process for any future development. 11.The groundwater de-watering system (drain tile) is owned and maintained by the property owners' association. 12.Development on all Restricted Lots is subject to further subdivision review. TRACT 5 OF THE CERTIFICATE OF SURVEY No. 2552, SITUATED IN THE NE1/4 OF SECTION 4, TOWNSHIP 2 SOUTH, RANGE 5 EAST, PRINCIPAL MERIDIAN, CITY OF BOZEMAN, GALLATIN COUNTY, MONTANA. NORTHWEST CROSSING SUBDIVISION Certificate of Transfer of Ownership and Completion of Non-Public Improvements; and Conditions of Approval : The following are hereby granted and donated to the property owners association noted below for their use and enjoyment: Common Open Space parcels designated Storm Water Tract. Unless specifically listed in the Certificate of Dedication, the city accepts no responsibility for maintaining the same NWX, LLC hereby further certify that the following non-public improvements, required to meet the requirements of chapter 38 of the Bozeman Municipal Code, or as a condition(s) of approval of the subdivision plotted herewith, have been installed in conformance with any approved plans and specifications prepared in accordance with the standards of Chapter 38 or other City design standards, or have been financially guaranteed and are covered by the subdivision improvements agreement accompanying and recorded with this plat. Installed Improvements: ????? Financially Guaranteed Improvements: ???????. The subdivider hereby grants ownership of all non-public infrastructure improvements to the property owners association created by document number _____________________________________. We further certify that the text and/or graphics shown on the Conditions of Approval sheet represents requirements by the governing body for final plat approval and that all conditions of subdivision application have been satisfied; and that the information shown is current as of the date of the certification, and that changes to any land use restrictions or encumbrances may be made by amendment to covenants, zoning regulations, easements, or other documents as allowed by law or local regulations. NWX, LLC By: ________________________________________________________________________________ ___________________________, Authorized Representative Dated State of ____________________________________ County of ___________________________________ On this ________________ day of ___________________________, 2020, before me, the undersigned Notary Public for the State of _____________________ personally appeared _______________________, known to me to be the Authorized Representative of NWX, LLC and acknowledged to me that said Inc. executed the same. Notary Public in and for the State of ___________________ Printed Name _____________________________________ Residing at _______________________________________ My commission expires _____________________________