HomeMy WebLinkAbout07-C0.6CMPSouthMAIL>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
>>>>>>>>>>>>
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
>
>
>
>
>
>
>
>
>>>>>>>>>>>>>>>>>>>
>>>>>>>>>>>>>>>S89°30'03"W 2649.87'8S
8S
8S
8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S8S 12S 12S 12S12S12S12S12S12S12S12S12S12S12S12S12S12S12S12S12S12S8S8S8S8S8S
8S8S8S8S8S8S8SDSD SD SD SD SD SD SD SD SD SD SD SD
DDSDSDSDSDSDSDDDSDSD SD SD
SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD
SDSDDDSDDSDDSDSDDYHSSSSSSWVWVWVWVWVWVWVWVWVWVWVWVWVWVWVWVWVWVWVWVWVWVEWEWEWEWEWEWEWEWEWEWEWEWEWEWEWESESESESESESESESESESESESESESESESESESESDESDESDESDESDESESEWEWEWEWEWEWEW ESDESDESDESDESDESDESDESDESDESDESDESDESDESDESDESDESDESD8S8S8W 8W 8W 8W 8W 8W
8S 8S 8S 8S 8S 8S8S8S8S8S8S8S 8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8S8S8S8S8S8S8W8W8W8W8W8W8W8W8W8W8W8W8W8WWSFIREFIREWS
FIREWSFIREWS
WSFIREFIREWSWS
S
SD
DSDSDSDSDSDSD
SD SD SD SDSDDDDSD SD SD SD SD SD SD SD SDD DSDDDSDSDSDDDDSDSDDSDDDSD SD PPPPPPPPPEEEEEEEEEEEEEEEEE E EE
EEEEEEEEEEEEEEEEEE E E E E E E EEEEEEEEEEEEEEEEEEEE
EEE
EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE E E E E E E EGGGGGGGGGGGG G G G G G G G G G G G G GGGGGGGGGGGGGGGGGG
G
G
GGGG
GGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGSDSDSDSDSDSDBLDG 3BLDG 4BLDG 1BLDG 2BLDG 5BLDG 6BLDG 7BLDG 8BLDG 9BLDG 13BLDG 14SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF
SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF
JOB SITE OFFICE
JOB SITE OFFICE
XXXX
XMATERIALS & EQUIPMENTSTAGING / STORAGE AREADUMPSTERDUMPSTER SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF408020400SCALE IN FEETCONST MGMTPLAN- SOUTHC0.6.
TWIN LAKES AVENUE
ROSA WAY
WELLSPRING DRIVEW. OAK STREETMEE OWNER:DATE:SHEET TITLE:OWNER:DATE:SHEET TITLE:CHECKED BY:DRAWN BY:
NWX APARTMENTS- AN ICON COMMUNITY
BOZEMAN, MONTANABLACKRIDGE COMPANIES1735 SOUTH 19TH AVESUITE BBOZEMAN, MT 59718OFFICE: 406.582.8100FAX: 406.582.8108244 North College Avenue #130Fort Collins, Colorado 80524P 970.409.3414www.norris-design.com10/29/2021NOTES BY SYMBOL:134EROSION & SEDIMENT CONTROL NOTES:1.ALL IMPROVEMENTS ON THIS PROJECT SHALL BE COMPLETED INACCORDANCE WITH THE MONTANA PUBLIC WORKS STANDARDSPECIFICATIONS, 6TH EDITION DATED APRIL 2010 (MPWSS); THE CITY OFBOZEMAN MODIFICATIONS TO THE MPWSS; AND THE PROJECTSPECIFICATIONS.2.ALL REQUIRED PERIMETER SILT AND CONSTRUCTION FENCING SHALL BEINSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING,STRIPPING, GRADING, ETC). ALL OTHER REQUIRED EROSION CONTROLMEASURES SHALL BE INSTALLED AT THE APPROPRIATE TIME IN THECONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECTSCHEDULE, CONSTRUCTION PLANS, AND STORMWATER MANAGEMENT PLAN.3.AT ALL TIMES DURING CONSTRUCTION, THE CONTRACTOR SHALL BERESPONSIBLE FOR PREVENTING AND CONTROLLING ON-SITE EROSIONINCLUDING KEEPING THE PROPERTY SUFFICIENTLY WATERED SO AS TOMINIMIZE WIND BLOWN SEDIMENT. THE CONTRACTOR SHALL ALSO BERESPONSIBLE FOR INSTALLING AND MAINTAINING ALL EROSION CONTROLFACILITIES SHOWN HEREIN.4.PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINEDWHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATIONSHALL BE LIMITED TO THE AREA(S) REQUIRED FOR IMMEDIATE CONSTRUCTIONOPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME.5.CONDITIONS IN THE FIELD MAY WARRANT EROSION CONTROL MEASURES INADDITION TO WHAT IS SHOWN ON THESE PLANS. THE CONTRACTOR SHALLIMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY TOCONTROL ON-SITE EROSION.6.ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BYAPPROPRIATE EROSION CONTROL METHODS. ANY SOIL STOCKPILE THAT WILLBE DORMANT FOR OVER THIRTY (30) DAYS SHALL BE SEEDED.7.THE CONTRACTOR SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARENECESSARY TO ASSURE THE PROPER CONTAINMENT AND DISPOSAL OFPOLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND ALL APPLICABLELOCAL, STATE, AND FEDERAL REGULATIONS.8.THE CONTRACTOR SHALL IMMEDIATELY CLEAN UP ANY CONSTRUCTIONMATERIALS INADVERTENTLY DEPOSITED ON EXISTING STREETS OR OTHERPUBLIC RIGHTS OF WAY, AND MAKE SURE STREETS ARE CLEANED AT THE ENDOF EACH WORKING DAY.9.ALL STAGING, INCLUDING THE STORAGE OF EXCAVATED MATERIALS ANDCONSTRUCTION MATERIALS, SHALL OCCUR WITHIN EACH RESPECTIVEPHASING BOUNDARY. ALTERNATE STAGING LOCATION BEYOND EACH PHASEBOUNDARY SHALL BE DETAILED BY THE SWPPP ADMINISTRATOR AS PART OFTHE CONTRACTOR'S GENERAL STORM WATER PERMIT.10.CONSTRUCTION DEBRIS WILL BE STORED AND COLLECTED IN A TEMPORARYRENTAL DUMPSTER/ DEBRIS BOX. TYPICAL DUMPSTER DIMENSION ARE12'X8'X3' AND HAVE A 4 TON WEIGHT LIMIT. NORMAL CONSTRUCTIONMATERIALS ARE TO BE COLLECTED, INCLUDING WOOD, METAL, DRYWALL,STONE AND BRICK.2SILT FENCE BMP INSTALLED WITH PHASE 1SWPPP REFER TO DETAIL 1 ON SHEET C5.1INSTALL CONCRETE WASHOUT FACILITYPER DETAIL 4 ON SHEET C5.1TYPE D INLET PROTECTION BMP INSTALLEDWITH PHASE 1 SWPPP REFER TODETAIL 3 ON SHEET C5.111111111422PHASE 1BOUNDARYPHASE 2 BOUNDARYMAINTAIN MINIMUM 30FTVEGETATIVE BUFFERTRACKOUT CONTROL SYSTEM BMPINSTALLED WITH PHASE 1 SWPPP REFERTO DETAIL 2 ON SHEET C5.1 OR ASRECOMMENDED BY MANUFACTUREREXISTINGASPHALT SURFACEEXISTINGCONCRETE SURFACEPROPOSED ASPHALTPAVEMENT SURFACEPROPOSEDCONCRETE SURFACELEGENDEXISTING CONTOURSSIGHT VISIONTRIANGLE (TYP.)33MASTER SITE PLAN10/29/21: MSP 0106/02/22: MSP 0109/06/22: MSP 01 10/29/21: MSP 0106/02/22: MSP 0109/06/22: MSP 010203