Loading...
HomeMy WebLinkAbout22- Service Order 1 - Think One - West Side Campus Exhibit A (Phase 1 - Basic Scope of Work) + Draft Scope of Work – REV 03 August 23, 2022 PROJECT TEAM ThinkOne Architects Architecture / Prime Consultant Anderson Mason Dale Architects Architecture Aquatics Design Group Aquatics Design 5 Landscape Morrison Maierle Civil; Structural; Mechanical Electrical Plumbing Vermeulens Cost PROJECT UNDERSTANDING Professional design services to perform public engagement and concept design services (Phase 1) and potentially final design (Phase 2) and construction (Phase 3) for a West Side Recreation and Aquatics Center and Library Branch. Phase 1 – Community Engagement and Conceptual Design · The City of Bozeman is considering a Fall 2023 ballot measure in support of a West Side Recreation and Aquatics Center and Library Branch to meet the needs of a growing community. · The consultant hired will build upon previous efforts, including but not limited to a 2012 City of Bozeman Recreation/Aquatics Facility Feasibility Study, and engagement efforts conducted as part of the current Bozeman Public Library renovation project. · Community engagement on what kinds of activities and spaces are needed to serve a diverse and growing community will guide the development of the conceptual design. The consultant will be expected to be familiar with and adhere to the Engage Bozeman framework that guides the City of Bozeman’s community engagement efforts. The consultant will work with City staff to develop a community engagement plan to clarify the scope of the engagement process and how input will influence different aspects of the conceptual design of the new facility. The consultant will be expected to implement the community engagement plan using creative and accessible tools and techniques to gather input from the broader community as well as specific groups. Input gathered during the engagement process will guide the resulting conceptual design. · Previous studies have identified the following profile for the project: 70,000 SF recreation center and indoor aquatics 33,000 SF outdoor aquatics facilities 33,000 SF branch library · Creative and efficient use of shared public spaces are critical to the success of this project, as the City of Bozeman strives to provide a campus style setting for a community and cultural center in a growing area of town to serve a diverse population. · The site has been identified as approximately 9 acres of land on the northeast corner of Durston and Cottonwood Roads. Conceptual design should include site analysis to include site improvements necessary to complete the project, including but not limited to geotechnical and survey work, pedestrian circulation, street improvements, parking layouts, landscape strategies, stormwater treatment and management. · High performance construction standards to be coordinated with Bozeman’s adopted Climate Plan, in addition to drought tolerant landscaping and other water conservation efforts. · A marketing package will be required to help communicate the proposed project to voters PROJECT SCHEDULE September 2022 to April 2023 BASE SCOPE OF WORK · Kick-off work session(s) with prime stakeholders o Review overall process, schedule, current relevant information o Review community outreach process, protocols o Identify touchpoints for design team interface w stakeholders, community – focus groups, open houses, events · Programming and Early Conceptual Design Exhibit A + Draft Scope of Work – REV 03 August 23, 2022 o Meet with client agency leadership team (Recreation, Aquatics, Library) to discuss, establish vision parameters for the project o Meet with client agency staff to assemble inventory of facility space needs, requirements, standards to support assembly of preliminary space program o Focused efforts to define aquatics program (indoor and outdoor) o Develop room sheet diagrams articulating size and primary infrastructure requirements o Concurrent concept explorations at a macro level focused on site diagramming: block plan diagrams, general adjacencies, site access and amenities, initial building massing; up to (3) conceptual site strategies will be explored for consideration o Tabulated space program summary with accompanying room sheet diagrams and site diagrams o Design narratives articulating proposed building and site systems (structural, architectural, mechanical, site infrastructure) · Site Analysis o Traffic study o Preliminary geotechnical work, based on preferred concept studies o Preliminary survey work – boundary, utilities, topography o Meetings with Bozeman Public Works Division to review, discuss development requirements · Community Outreach o Architecture camp – (2) cycles, conducted during (2) days in Bozeman, at a venue proximate to the site o Focus groups (in-person and/or virtual sessions) o Open houses – (3) in-person sessions o Preparation and collateral generation for all sessions · Cost Modeling o Develop initial cost model scenarios developed concurrently with programming and early concept design efforts; developed based on site strategies, infrastructure, spatial types, building systems unit cost o Two cost model updates coinciding with early concept design efforts as they evolve, and directed by target value design strategies o One cost model update coinciding with advanced concept design work ADDITIONAL SCOPE OF WORK · Conceptual Design (Advanced) o Further review of initial explorations will move from macro to micro – working toward floor plan diagrams, refined building massing, and character studies o Conceptual landscape strategies o Diagram floor plans, massing o Precedent research of comparable facilities; character boards depicting precedent concepts – spatial, massing, materiality, programs, exteriors, landscapes o Up to (2) conceptual strategies will be developed to allow for selection of a preferred direction · Collateral Package o Illustrative site plan o Conceptual plan diagrams o 3-D massing vignettes o Character vignettes – exterior and interior o Infographics o Final cost model o Digital publication with concept narratives o These assets are to be highlighted on any of the following: singular website platform, social media, brochures, signage, and/or mailings. Optional services: · Precedent facility visits, tours with city staff · Advanced conceptual design to support video flythroughs + Draft Scope of Work – REV 03 August 23, 2022 · Physical massing model built in wood and acrylic Proposed Timeline July 2022 Design Team Selection August 2022 Contract Negotiation September 2022 Project kickoff w city of Bozeman stakeholders – review goals, objectives, protocols, workplan Review of all relevant information and findings from past, recent city efforts; Site visit; collect, prepare site plan exhibits Workshop (virtual) - develop criteria, metrics for concept evaluations October 2022 Site visit; site analysis; Programming, space needs Workshop (virtual) – initial program, space needs; target value analysis, cost modeling review November 2022 Programming, space needs refinement Conceptual site studies Cost modeling scenarios Workshop (in-person) Workshop, Architecture Camp in Bozeman Public meeting – project awareness; community aspirations; site review; initial program review; input on drivers, strategies to inform concept iterations December 2022 Concept site studies; block diagrams; building massing Program confirmation informed by concept studies Cost modeling scenarios; review and adjustments HOLIDAYS January 2022 Conceptual design studies, development; cost modeling alternatives Workshop (in person) Workshop, Architecture Camp in Bozeman February 2022 Advanced conceptual design studies, development Workshop (in person) Public meeting – conceptual design presentation; collect input on character, vernacular, inspiration of place March 2022 Collateral Package development Cost modeling - adjustment for scope & budget alignment Review, confirm collateral content Public meeting – preview final conceptual design April 2023 Final Collateral Package incl. Project Cost Model Bozeman West Side Campus Proposal for Professional Design Services Programming / Public Outreach / Initial Concept Design Team Members / Services Direct Costs Reimbursable Exp.Total Cost ThinkOne Architects (Architecture, Management)$45,000 $0 incl.$45,000 AMD Architects (Architecture Design)$188,000 $0 incl.$188,000 Aquatic Design Group (Aquatics / Recreation)$20,000 $0 incl.$20,000 Design 5 (Landscape Design)$2,000 $0 incl.$2,000 MMI (Civil Engineering)$2,500 $0 incl.$2,500 MMI (Structural Engineering)$1,500 $0 incl.$1,500 MMI (MEP Engineering)$1,500 $0 incl.$1,500 Site Survey (MMI)$5,000 $0 incl.$5,000 Traffic Study (MMI - Tom Eastwood)$17,000 $0 incl.$17,000 Geotechnical Investigation (Allied Engineering)$12,500 $0 incl.$12,500 Phase Total $295,000 $0 $295,000 Enhanced Concept Design - Program Validation - Detailed Costing Effort Team Members / Services Direct Costs Reimbursable Exp.Total Cost ThinkOne Architects (Architecture, Management)$30,000 $0 incl.$30,000 AMD Architects (Architecture Design)$80,000 $0 incl.$80,000 Aquatic Design Group (Aquatics / Recreation)$13,000 $0 incl.$13,000 Design 5 (Landscape Design)$4,500 $0 incl.$4,500 MMI (Civil Engineering)$5,000 $0 incl.$5,000 MMI (Structural Engineering)$2,500 $0 incl.$2,500 MMI (MEP Engineering)$2,500 $0 incl.$2,500 Phase Total $137,500 $0 $137,500 Total All Proposed Design Services $432,500 Bozeman West Side Campus Fee Proposal_Rev 3.xlsx 8/24/2022