Loading...
HomeMy WebLinkAbout001 G100 COVER SHEETACKNOWLEGEMENT OF ACCESS REQUIREMENTS UNDER FEDERAL AND STATE DISCRIMINATION LAWS (ARM 24.301.902) THIS ACKNOWLEDGES THAT THE FOLLOWING PROJECT WAS DESIGNED WITH FULL KNOWLEDGE THAT THE CITY OF BOZEMAN BUILDING DIVISION WILL NOT REVIEW FOR COMPLIANCE WITH, NOR IS RESPONSIBLE FOR ENFORCEMENT OF THE FEDERAL AMERICANS WITH DISABILITIES ACT OF 1990, THE REHABILITATION ACT OF 1973, THE FAIR HOUSING AMENDMENTS ACT OF 1988, TITLE 49, CHAPTER 2, COMMONLY KNOWN AS THE MONTANA HUMAN RIGHTS ACT, OR OTHER SIMILIAR FEDERAL, STATE OR LOCAL LAWS THAT MANDATE ACCESSIBILITY TO COMMERCIAL CONSTRUCTION OR MULTI-FAMILY HOUSING. TOTAL LOT AREA SITE INFORMATION TOTAL BUILDING FOOTPRINT DESCRIPTION AREA PERCENT OF TOTAL TOTAL AREA OF LANDSCAPING TOTAL AREA OF HARDSCAPING PARKLAND DEDICATION REQUIREMENTS GROUND LEVEL OPEN SPACE PROVIDED BY PATIOS. 50% OF 2ND AND 3RD FLOOR UNITS OPEN SPACE PROVIDED BY DECKS. 2ND AND 3RD LEVEL UNITS: (4) EFFICIENCY X 100 = 400 S.F. (7) 1 BEDROOM X 100 = 700 S.F. (2) 2 BED X 150 = 300 S.F. 1,400 S.F./2 = 700 S.F. COMMON OPEN SPACE REQUIRED OPEN SPACE F.A.R. TOTAL BUILDING AREA -17,544 S.F. TOTAL LOT AREA = 39,609 S.F. FAR = GROSS BLDG AREA/LOT AREA FAR = 17,544/39,609 = 0.44 NET RESIDENTIAL DENSITY MIN. DENSITY ALLOWED = 6 D = du/(A-(c+i+s+a+d)) = 20/0.9 = 22.2 BICYCLE PARKING CALCULATIONS PARKING SPACES REQUIRED 27 SPACES BICYCLE PARKING REQUIRED (10%)3 SPACES BICYCLE PARKING PROVIDED 8 SPACES PARKING CALCULATIONS USE PARKING RATIO REQ'D PARKING (7) EFFICIENCY APARTMENTS 1.25 PER UNIT 8.75 SPACES (10) 1 BEDROOM APARTMENTS 1.5 PER UNIT 15 SPACES (3) 2 BEDROOM APARTMENTS 2 PER UNIT 6 SPACES PARKING REQUIRED 29 SPACES PARKING REQUIRED W/ TRANSIT STOP 10% REDUCTION 26.7 SPACES SURFACE PARKING PROVIDED 28 SPACES ADA PARKING REQUIRED ADA PARKING PROVIDED 39,609 S.F. 5,848 S.F. 23,374 S.F. 10,387 S.F. 100% 15% 59% 26% ZONING DISTRICT R-4 0.03 ACRE REQ. DEDICATION PER DWELLING MAX. DEDICATON PER ACRE CASH IN LIEU AREA REQUIRED CASH IN LIEU DEDICATION AT $2.30 12 30,579 S.F. (LOT) = 0.7020 ACRE (12) 0.7020 = 8.424 UNITS 8.424 UNITS X 0.03 = 0.25272 ACRE 0.25 (ACRE) = 10,890 S.F 10,890 S.F. X $2.30 = $25,047 NOTE: SITE AREA EXCLUDES STREET ROW DEDICATION STATUS: JOB NO.: CHECKED: DRAWN: Copyright © 2015 -2022 ADDISON PLACE CONDOS 1242 THOMAS DRIVE BOZEMAN, MT 59715 20-051 PERMIT REVIEW 1242 THOMAS DRIVEBOZEMAN, MT 5971506/10/2022 G100ADDISON PLACE CONDOSCOVER SHEET SITE OVERVIEWVICINITY MAP ENLARGED VICINITY/ZONING MAP PROJECT LOCATION C&H ENGINEERING 1091 STONERIDGE DR. BOZEMAN, MT 59718 PHONE:406-587-1115 per@chengineers.com CIVIL ENGINEERS STRUCTURAL ENGINEERS LANDSCAPE DESIGN CONSULTANTS LEGAL DESCRIPTION STREET ADDRESS OWNER BUILDING INFORMATION GENERAL CONTRACTOR PROJECT INFORMATION BAXTER LANE SUB 1, S35, T01S, R05E LOT 4, 0.91 ACRES, LOUIS ANNEX TO BOZEMAN PLAT H-15 1242 THOMAS DRIVE BOZEMAN, MT 59715 ABS LLC 389 FERGUSON AVE. BOZEMAN, MT 59718 ZONING:R-4 OCCUPANCY:R-2 CONSTRUCTION TYPE:V-A SPRINKLED:YES NUMBER OF STORIES:3 BUILDING HEIGHT 37'-6" SQUARE FOOTAGES 1ST FLOOR 5,848 S.F. 2ND FLOOR 5,848 S.F. 3RD FLOOR 5,848 S.F. TOTAL 17,544 S.F. APPLICABLE CODES: 2021 IBC 2021 UPC 2020 NEC 2021 IECC 2021 IFGC 2021 IMC 2017 ICC A117.1 ARM Modifications to the Adopted 2021 Building Codes INDEX OF DRAWINGS CONSTRUCTION ROUTE C&H ENGINEERING 1091 STONERIDGE DR. BOZEMAN, MT 59718 PHONE:406-587-1115 per@chengineers.com JIM APPLEBEE 406-579-0839 jim@applebeeinc.com PROJECT LOCATION PROJECT LOCATION REVISION SCHEDULENO:DESCRIPTION:DATE:BY:2C.O.B. REVISIONS08/19/2022INCONTOUR 109 E OAK ST SUITE 1F BOZEMAN, MT 59715 PHONE:(406) 624-9111 lessa@incontour.com ME ENGINEERS THREE RIVERS ENGINEERING 24 S WILSON AVENUE BOZEMAN, MT 59715 406-582-8288 john@tremt.com CIVIL C1.0 CIVIL COVER SHEET C2.0 CIVIL SITE PLAN C2.1 DEMO PLAN C3.0 DEMO PLAN C4.0 SITE GRADING & DRAINAGE C5.0 CIVIL DETAILS C5.1 CIVIL DETAILS LANDSCAPE L1.1 PLANTING PLAN L1.2 PLANT SCHEDULE L1.3 PLANTING DETAILS L2.1 PLANT SCHEDULE L2.2 IRRIGATION SHCEDULE LIGHTING AL.1 PHOTOMETRIC SITE PLAN AL.2 CYLINDER FIXTURE ARCHITECTURAL A1.0 SITE PLAN A1.1 SITE DETAILS A2.0 FLOOR AND ROOF TYPES A2.1 FIRST FLOOR PLAN A2.2 SECOND FLOOR PLAN A2.3 THIRD FLOOR PLAN A2.4 ROOF PLAN A2.5 STAIR PLANS A3.0 EXTERIOR ELEVATIONS A3.1 EXTERIOR ELEVATIONS A3.5 PERSPECTIVES A4.0 SCHEDULES A5.0 BUILDING SECTIONS A5.1 BUILDING SECTIONS A5.2 WALL SECTIONS A5.3 WALL SECTIONS A6.0 DETAILS A7.0 INTERIOR ELEVATIONS STRUCTURAL S1.0 FOUNDATION PLAN S1.1 HELICAL PIER PLAN S2.0 MAIN FLOOR FRAMING PLAN S2.1 SECOND & LOWER ROOF FRAMING S2.2 THIRD FLOOR FRAMING PLAN S2.3 UPPER ROOF FRAMING PLAN S3.0 STRUCTURAL NOTES S3.1 STRUCTURAL DETAILS S3.2 STRUCTURAL DETAILS S3.3 STRUCTURAL DETAILS ELECTRICAL E100 FIRST FLOOR ELECTRICAL PLAN E101 SECOND FLOOR ELECTRICAL PLAN E102 THIRD FLOOR ELECTRICAL PLAN E2.1 FIRST FLOOR ELECTRICAL E2.2 SECOND FLOOR ELECTRICAL E2.3 THIRD FLOOR ELECTRICAL E3.1 ELECTRICAL DETAILS E4.1 ELECTRICAL SCHEDULES MECHANICAL M1.0 MECHANICAL FOUNDATION M1.1 FIRST LEVEL MECHANICAL M1.2 SECOND LEVEL MECHANICAL M1.3 THIRD LEVEL MECHANICAL M2.1 PLUMBING SCHEDULES & DETAILS 2 2