Loading...
HomeMy WebLinkAbout026 Stormwater Design ReportINTRODUCTION The Hayden Valley Condos Site Plan project proposes to develop Lot 2, Block 11 of Cattail Creek Subdivision Phase 2A &2B,with two 4-plex buildings.The property is located in the City of Bozeman and is zoned as R-3.A combination of site grading, curb and gutter,and a proposed dry well will be used to manage stormwater runoff on the site. Supporting stormwater calculations are enclosed herein in Appendix B for reference. CATTAIL CREEK SUBDIVISION, PHASE 2A &2B –STORMWATER BACKGROUND INFORMATION Cattail Creek Subdivision Phase 2A &2B included the construction of regional detention ponds that handle the entire Phase 2 runoff by curb and gutter and underground stormwater infrastructure designed by TD&H, Inc.A copy of the Cattail Creek Subdivision Phase 2 Stormwater Design Report (2002) is included in Appendix E.Lot 5, Block 11,was assigned a Rational Method Runoff Coefficient of 0.50 per Bozeman Design Standards and Specifications Policy (DSSP)in that original design.A Runoff Coefficient of 0.50 is an inadequate estimation for the proposed development of this lot.This original underestimation of the future development of this lot means that the regional detention ponds for Phase 2B were not designed to handle the entire runoff contribution of Lot 5, Block 11,as proposed. LOT 5, BLOCK 11 STORMWATER DESIGN The entire 0.56-acre property will be developed as shown on the civil site plan drawings included herein.For a 10-year, 2-hour storm a total of 1,356 cubic feet (cf) of stormwater will be generated. However, a total of 825 cf is allowed to be discharged from the site using the subdivision weighted coefficient of 0.50.Therefore, a total of 531 cf of stormwater will need to be retained on the site. The proposed drywell located within the central drive aisle is designed to hold a total volume of 789 cf.The drywell is adequately sized to retain the stormwater runoff from the respective drainage area. DRAINAGE AREAS The proposed development consists of four (4)Drainage Areas, which are shown on the drainage area exhibit included herein.The allowable off-site drainage will come from Drainage Areas 1,3, and 4, which are generally located on the exterior portions of the property and will discharge to the surrounding roadways within the Cattail Creek Subdivision Phase 2. Drainage Areas 1, 3,and 4 will discharge a total of 601 cf of stormwater off site, which is within the allowable amount of 825 cf as cited above,to be discharged to the Cattail Creek Subdivision,Phase 2. The central portion of the site consists of Drainage Areas 2 and will utilize a proposed drywell. This stormwater will flow towards a low-point at the drywell rim as shown on the site grading and drainage plan (sheet C2.2)included with this application.All runoff within Drainage Area 2 will be retained on site by the proposed drywell.See the attached calculations for Drywell 1 sizing. DEPTH TO GROUNDWATER Groundwater monitoring on Lot 5 of the same block has been conducted by C&H Engineering beginning in April 2021.As shown on the groundwater monitoring results in Appendix C, the shallowest seasonal-high groundwater depth was determined to be approximately 7.08 feet below existing grade. It should also be noted that the drywell rim elevation is about 0.5 feet above the existing grade. As a result, the seasonal-high groundwater depth is expected to be about 7.5 feet below the drywell rim elevation. The drywell structure is approximately 6 feet tall and contains 0.5 feet of washed drain rock beneath the structure resulting in a 6.5-foot profile.Therefore, about 1 foot of separation between the bottom of the washed drain rock and the seasonal-high groundwater is expected. OFF-SITE DRAINAGE CONSIDERATIONS It is understood that drainage cannot be directed onto adjacent properties in a manner or volume which differs from historic patterns (BMC 40.04.700). The existing and historic topography is shown on the topographic map included herein with this site plan application. As shown on the topographic map, the property has a downgradient slope to the north-northeast.Given the undeveloped condition,a runoff coefficient of 0.20 would be applied. Using this runoff coefficient, the 10-year, 2-hour storm would generate a total of 440 cubic feet (cf) of stormwater, which would sheet flow off-site to the north-northeast.All proposed drainage areas direct stormwater into a drywell or the adjacent streets, no surrounding properties will be affected by the runoff from Lot 2 of Block 11. G:\C&H\21\210795\Design Reports\210795 -Stormwater Design Report.Docx APPENDIX A DRAINAGE AREA MAP APPENDIX B DRAINAGE AREA & DRYWELL CALCULATIONS DRAINAGE AREA #1 RUNOFF VOLUME FROM DA#1 1. Calculate Area and Weighted C Factor Contributing Area C Area (ft 2 )C * Area Landscape 0.2 0 0 Hardscape 0.95 3156 2998 Total 3156 2998 A = Area (acres)0.07 C = Weighted C Factor 0.95 2. Calculate Required Volume Q = CIA V=7200Q C = Weighted C Factor 0.95 I = intensity (in/hr) 0.41 (10 yr, 2hr storm) A = Area (acres) 0.07 Q = RUNOFF (cfs)0.03 V = REQUIRED VOL (ft3)202 Check the half inch requirement (per DSSP II.A.4) 1. Determine Area of Hardscape within Drainage Area #1 Contributing Area Area (ft 2 ) Hardscape 3156 2. Calculate 1/2" runoff volume over hardscape (aka Runoff Reduction Volume [RRV] as calculated in Montana Post- Construction Storwater BMP Manual - Equation 3-1) RRV = [P*Rv*A]/12 P = Water quality rainfall depth 0.50 inches Rv = Dimensionless runoff coefficient 0.95 0.05 + 0.9*I I = Percent impervious cover (decimal)1.00 decimal A = Entire drainage area 0.07 acres RRV = Runoff Reduction Volume 0.0029 acre-ft RRV = Runoff Reduction Volume 125 cubic feet Because the runoff volume from the 10‐yr, 2‐hr storm (for flood control) is  greater than the runoff volume produced by the half inch rainfall (for water quality)  RUNOFF VOLUME FROM DA#2 1. Calculate Area and Weighted C Factor Contributing Area C Area (ft 2) C * Area Landscape 0.2 108 22 Hardscape 0.95 11772 11183 Total 11879 11205 A = Area (acres)0.27 C = Weighted C Factor 0.94 2. Calculate Required Volume Q = CIA V=7200Q C = Weighted C Factor 0.94 I = intensity (in/hr) 0.41 (10 yr, 2hr storm) A = Area (acres) 0.27 Q = RUNOFF (cfs)0.10 V = REQUIRED VOL (ft3)755 Check the half inch requirement (per DSSP II.A.4) 1. Determine Area of Hardscape within Drainage Area #2 Contributing Area Area (ft 2) Hardscape 11772 2. Calculate 1/2" runoff volume over hardscape (aka Runoff Reduction Volume [RRV] as calculated in Montana Post- Construction Storwater BMP Manual - Equation 3-1) RRV = [P*Rv*A]/12 P = Water quality rainfall depth 0.50 inches Rv = Dimensionless runoff coefficient 0.94 0.05 + 0.9*I I = Percent impervious cover (decimal)0.99 decimal A = Entire drainage area 0.27 acres RRV = Runoff Reduction Volume 0.0107 acre-ft RRV = Runoff Reduction Volume 466 cubic feet Because the runoff volume from the 10‐yr, 2‐hr storm (for flood control) is  greater than the runoff volume produced by the half inch rainfall (for water quality)  the proposed drywell is sized to handle the larger volume (755 cf). 3. Calculate Drywell Volume Existing Soil Condition Fine Sand Percolation Rate (min/in) 6 (see Circular DEQ 4, Percolation Rate (ft/hr) 0.83 Table 2.1-1) Porous Media in Drywell Gravel Void Ratio of Media 30.00% Gravel Offset Dist. From Drywell (ft) 5.5 Infiltration Drywell Gravel Area (ft2)196.8 Infilitration Volume (ft3)328.02 Gravel Void Volume Gravel Bed Depth (below MH) 0.50 Gravel Volume (ft3)1169.34 Gravel Storage Volume (ft3)350.80 Manhole Volume Manhole Depth (ft) 6.00 Manhole Volume (ft3)109.93 Provided Volume Inc. Perc. (ft3)789 RUNOFF VOLUME FROM DA#3 1. Calculate Area and Weighted C Factor Contributing Area C Area (ft 2 )C * Area Landscape 0.2 2622 524 Hardscape 0.95 2550 2423 Total 5172 2947 A = Area (acres)0.12 C = Weighted C Factor 0.57 2. Calculate Required Volume Q = CIA V=7200Q C = Weighted C Factor 0.57 I = intensity (in/hr) 0.41 (10 yr, 2hr storm) A = Area (acres) 0.12 Q = RUNOFF (cfs)0.03 V = REQUIRED VOL (ft3)199 Check the half inch requirement (per DSSP II.A.4) 1. Determine Area of Hardscape within Drainage Area #3 Contributing Area Area (ft 2 ) Hardscape 2550 2. Calculate 1/2" runoff volume over hardscape (aka Runoff Reduction Volume [RRV] as calculated in Montana Post- Construction Storwater BMP Manual - Equation 3-1) RRV = [P*Rv*A]/12 P = Water quality rainfall depth 0.50 inches Rv = Dimensionless runoff coefficient 0.49 0.05 + 0.9*I I = Percent impervious cover (decimal)0.49 decimal A = Entire drainage area 0.12 acres RRV = Runoff Reduction Volume 0.0024 acre-ft RRV = Runoff Reduction Volume 106 cubic feet Because the runoff volume from the 10‐yr, 2‐hr storm (for flood control) is  greater than the runoff volume produced by the half inch rainfall (for water quality)  RUNOFF VOLUME FROM DA#4 1. Calculate Area and Weighted C Factor Contributing Area C Area (ft 2 )C * Area Landscape 0.2 3225 645 Hardscape 0.95 2450 2328 Total 5675 2973 A = Area (acres)0.13 C = Weighted C Factor 0.52 2. Calculate Required Volume Q = CIA V=7200Q C = Weighted C Factor 0.52 I = intensity (in/hr) 0.41 (10 yr, 2hr storm) A = Area (acres) 0.13 Q = RUNOFF (cfs)0.03 V = REQUIRED VOL (ft3)200 Check the half inch requirement (per DSSP II.A.4) 1. Determine Area of Hardscape within Drainage Area #4 Contributing Area Area (ft 2 ) Hardscape 2450 2. Calculate 1/2" runoff volume over hardscape (aka Runoff Reduction Volume [RRV] as calculated in Montana Post- Construction Storwater BMP Manual - Equation 3-1) RRV = [P*Rv*A]/12 P = Water quality rainfall depth 0.50 inches Rv = Dimensionless runoff coefficient 0.44 0.05 + 0.9*I I = Percent impervious cover (decimal)0.43 decimal A = Entire drainage area 0.13 acres RRV = Runoff Reduction Volume 0.0024 acre-ft RRV = Runoff Reduction Volume 104 cubic feet Because the runoff volume from the 10‐yr, 2‐hr storm (for flood control) is  greater than the runoff volume produced by the half inch rainfall (for water quality)  APPENDIX C GROUNDWATER DATA Project Engineer: Ryan H.Project:Well Information:bgs = below ground surface ags = above ground surfaceMW-1 MW-20.500.50Groundwater Information:MW-1 MW-27.80 7.127.08 7.107.21 7.117.12 7.107.30 7.2106/18/2106/25/2107/02/2107/09/2107/16/2105/14/2105/21/2105/28/2106/04/2106/11/2105/07/21Monitor Well DataDepth to Ground Water (feet-bgs)04/09/2104/16/21Project Number: 201025Cattail & Davis, Groundwater MonitoringProject Location:04/23/2104/30/21Well IDWell Depth (Feet)Top of Well (Elevation)Ground Elevation Date APPENDIX D STORMWATER MAINTENANCE PLAN INSPECTION AND MAINTENANCE FOR STORMWATER MANAGEMENT FACILITIES The Property Owners Association shall be responsible for the maintenance of the stormwater drainage facilities within the Cattail Condominium development. Storm Water Facilities: 1. Drainage swales slope toward retention and detention ponds to collect storm water runoff and channel it to the retention or detention pond. 2. Inlets are facilities where storm water runoff enters a pipe network. Inlets include storm water manholes and drains. 3. Drywells are underground storm water collection facilities that collect and temporarily store runoff from roof tops and landscaped areas before allowing storm water to infiltrate into the ground. Post Construction Inspection: 1. Observe that drywells, catch basins, and outlet structures are clear of any material or obstructions in the drainage slots. Inspect these structures to insure proper drainage following a storm event. Immediately identify and remove objects responsible for clogging if not draining properly. Semi-Annual Inspection: 1. Check retention dry wells three days following a storm event exceeding ¼ inch of precipitation. Failure for water to percolate within this time period indicates clogging or poor-draining soils. Clear any clogs and replace any poor-draining soils with well-draining gravely soils. 2. Check for grass clippings, litter, and debris in drainage swales, catch basins, dry wells, culverts and retention ponds. Flush and/or vacuum drywells or storm water pipes if excessive material is observed in the facilities. Standard Maintenance: 1. Inspect and remove debris from drainage swales, catch basins, dry wells, and retention ponds. Use a vacuum truck to clean catch basins and dry wells. 2. Inspect for the following issues: differential accumulation of sediment, drain time, signs of petroleum hydrocarbon contamination (odors, oil sheen in pond water), standing water, trash and debris. Equipment Type/Access: All drywells will be cleaned using vacuum trucks. All vacuum trucks will access the site through the proposed alley and parking lot. Cost Estimate: Depending on the amount of rainfall in the given year, the cost to maintain the stormwater infrastructure will vary. It is estimated that the drywells will need to be vacuumed out once per year, with an estimated cost of $1,500 to do so. The applicant will be responsible for financing the maintenance of the stormwater infrastructure. APPENDIX E CATTAIL CREEK SUBDIVISION PHASE 2 STORMWATER DESIGN REPORT